2 x | Ivory Full Stacked |
1 x | TI 2201 |
1 x | Herringbone Rust |
1 x | Cathedral Ceiling Support |
1 x | 450w Igniter W/instructs |
1 x | 75CFM BLOWER-7FT CORD |
1 x | Horizontal Round Hi-Wind Termination Kit |
1 x | Small Bellows / Wood |
1 x | 4 Piece Fireset Tools Black |
2 x | Convection Blower, with Gasket 1 |
2 x | Frontier, Decorative Accent Trim, Aged Silver |
1 x | Compact Termination SV4.5 |
1 x | Ivory Split Stacked |
1 x | Bulk50-hcs 5mm X 8mm Z |
2 x | Andiron Kit, Classic |
1 x | Cottage Wood Holder w/ Tools |
4 x | BRASS MALE COMP FITTING |
1 x | Flex Compact Term w 18" compressed vent |
1 x | Millivolt - NG to LP |
2 x | 4" Air Kit, Collar & Hood Only |
2 x | 5/16x1/2 Ball Plunger-3pk |
1 x | (892002) Door Handle, Spring – Gold 1 |
1 x | AIR GUIDE-SALES |
1 x | 4-1/2 X 8-1/2 RECT GLASS |
3 x | ADC HINGE BIN |
1 x | Comb Pkg Cap-tl2.0 |
2 x | Length 1ft. |
1 x | Unit- mountable Rocker Switch |
1 x | 33 x 42-1/2 Black |
1 x | Log Scraps, Floor Media Kit |
1 x | 36" Bi-Fold Door, Platinum |
1 x | DOUBLE PILOT ORIFICE NG |
1 x | 11-2/3 X 19 RECT GLASS |
2 x | Full Skid Of Brick-sales |
1 x | 1/4 Silicone Tubing-5 Ft |
1 x | Brown Open End Log Carrier |
1 x | Black Fireplace Hood |
1 x | 32" Perimeter Trim - Platinum |
3 x | Vintage Red Brick Liner Kit 40 |
2 x | Touch up paint firebox interior |
1 x | 90 degree Elbow - Galvanized |
1 x | 40% TD VALVE NG CONVERSIO |
1 x | Decorative Face Trim, Aged Silver |
1 x | Façade, Deco, Black |
2 x | 3/4 X 2-7/16 Ext Spring |
1 x | Log Set |
1 x | 18IN VALVE HARNESS |
1 x | 306w/120v Ignitor 15 Fin |
1 x | 6.0 lb. Bag Smooth Glass Pebbles, Green |
2 x | ARBOR |
2 x | 1/2 Pillow Block-4 Pack |
3 x | Standard Single Speed |
1 x | BLACK CLASSIC DOORKIT |
1 x | Hinge - Male Right 2 |
2 x | OLYMPIC STOVE |
3 x | 42" Outdoor Bi-Fold Glass Door, Brushed Brass Finish |
1 x | 36" Fixed Door, Black |
1 x | 38 Lft Rrcvr-painted-sale |
2 x | Fdr -2cleanout W/gskt-2pk |
1 x | Thermostatic On/Off Remote Control Kit |
1 x | 4 pc. Tool Set - Contemporary - Round Base - Black |
1 x | Variable Speed with Thermo Snap Switch |
1 x | Hinge - Male Left 2 |
4 x | Variable Speed with Wall Switch |
1 x | 36" Bi-Fold Door, Brushed Brass |
1 x | 3-Piece Trim Kit, Black |
1 x | 15-1/2IN FLAPPER-SALES |
1 x | NZ2000/WM1020/NM2020 |
2 x | Remote, On/Off, Hi/Low, Electronic |
3 x | Skytech 1001TH On/Off Fireplace Remote Control With Thermostat |
2 x | 4 Output Circ Brd-sales |
1 x | 36" Mosaic Masonry™ Bi-Fold Door, Oiled Bronze Finish |
2 x | 3-20-60906 Blade-3 Pack |
1 x | Pf1 4 Pole Thermostat Ext |
2 x | Combustion Blower Transition – Aluminum 1 |
1 x | Tl300 Airslide Rod Brkt-s |
1 x | Façade, Contemporary, Black |
1 x | Yankee Bay PI 2002-2012 |
1 x | 48" Masonry Ceramic Glass Bi-Fold Door, Ebony |
2 x | Damper Clamp (Required in vented applications.) |
1 x | Bolt On Ash Dr Hinge-sale |
4 x | Touch up paint powder coat exterior |
1 x | 820 NOVA VALVE-PROPANE |
1 x | 3/8 TRIM BAR-SALES |
1 x | Coastal Legs, Nickel |
1 x | 68/35 Door Trim-brt Nickl |
1 x | 36" Stainless Steel Hood w/4" Brow |
2 x | Glass Media, 5LB Bag, Copper |
1 x | Black 2.5 Quart Cast Iron Kettle |
1 x | Xxv-2 Fdr Weldment |
1 x | 42" Surround, Stainless Matte |
1 x | Herringbone Rust |
1 x | Green/Navy Canvas Log Carrier |
3 x | 38/45/61/68 Gold Ash Lip |
1 x | Pioneer (Heritage)PS 1997-2012 |
1 x | Round Top Termination with Louvered Screen |
1 x | BLOWER |
2 x | 105 ASH CHMBR INSUL-BACK |
1 x | Elbow 90-Degree, 8" I.D. |
1 x | 18.75 GOLD AIR GRILLE |
2 x | Tl300 Brick Insulation |
2 x | Buff Brick Liner Kit 35 |
1 x | 3 HOLE GRATE LINK-CAST |
2 x | Adjustable Length, 8" I.D. (2" - 5") |
1 x | Glass, Side 1 |
1 x | Warm Red Full Herringbone |
1 x | Ivory Full Stacked |
1 x | Wall Switch Kit, On/Off, White |
2 x | Fireplace Insert Insulation (KK0111) |
1 x | Heat Exchange Tube Cleaning Rod 1 |
1 x | Glass Media, 5LB Bag, Platinum |
1 x | 42" Fixed Door, Platinum |
1 x | Burnpot Insert – Replacement for A-S-BURNPOT28FS 1 |
1 x | 36" Outdoor Fireplace Panel Cover |
2 x | RAINIER STOVE |
2 x | BEARING 3/8 ID X 1-1/8 OD |
2 x | Glass Media, 5LB Bag, Goldfinger |
1 x | 6X4-1/2X1-1/4 BRICK-SALES |
1 x | Door - P23, Painted w/Trim 1 |
1 x | 36" Standard Bi-Fold Glass Door, Brushed Brass |
1 x | Combustion Package Cap |
1 x | Hinge, Door - P22, P1000PB, P1000PW (PB/PW) 1 |
1 x | 68/tl3 Ball Sprng Brkt-sa |
2 x | Leveling Legs |
1 x | Fireback Supports |
1 x | Refractory Cement Ready-mixed (tan/buff) |
1 x | 75CFM BLOWER-NO CORD |
2 x | 3F Screen Child Guard Stove |
1 x | 14" Snorkel Termination - Galvanized |
2 x | Glowing Embers |
1 x | Heat Exchange Tube Cleaning Rod - P2000I 1 |
2 x | (891121) Air Switch Tube (Per Foot) 1 |
1 x | Control Board Knob Pkg-10 |
1 x | Herringbone Rust |
2 x | 6 Amp Fuse-set Of 5 |
1 x | 105 Relief Damper Gasket |
1 x | EcoFlow Touchscreen Remote, Electronic |
1 x | Ash Pan – P24F 1 |
1 x | 10 Amp Circuit Breaker |
1 x | Heat Shield |
1 x | CAMANO STOVE |
1 x | Pewter & Graphite - 21" L |
1 x | FLUSH INSERT PERFECT FIT |
1 x | Conversion Kit, Electronic Ignition, Propane to Natural |
1 x | Nake Panel Kit, Black Porcelain |
1 x | Buff Brick Liner Kit 40 |
1 x | 7" Sunburst - Cast Iron Trivet / Enamel Blue Black |
1 x | Door - P24, Painted w/Trim 1 |
1 x | NC12/NC16/NFI-C |
1 x | Cape Cod Flush Wood Plus |
1 x | Junction Box Kit (Required with Blower) |
1 x | Trim Kit, Gold - P22I Medium Flashing 1 |
1 x | Old Town Red Brk Lnr Kit 35-Herringbone |
1 x | Oriental 44"x22" Rect - Beige / Beige |
1 x | Pedestal Ash Drawer Kit |
2 x | Bulk25-ssscp5/16-18 X 3/8 |
1 x | Conversion Kit, Electronic Ignition, Propane to Natural |
2 x | Conversion Kit, Electronic Ignition, Natural to Propane |
2 x | Log Scraps, Floor Media Kit |
1 x | Old Town Red Brk Liner Kit 33 - Herringbone |
3 x | 1.25 Hinge-sales |
1 x | Black Nickel Trim |
1 x | 30" Bison Mountain Log Set, Concrete |
1 x | Control Panel, Digital 1 |
1 x | NG to LP Conversion Kit- RDV-CD |
1 x | Warm Red Split Herringbone |
1 x | 105 Sheet Metal Brkt-sale |
1 x | Door - P22, P1000PW - Brushed Nickel (PW) 1 |
1 x | EPA 1450 |
1 x | Cold Air Collar Kit - 12" Chimney |
1 x | Oriental 56"x26" Half Rnd - Burgundy |
1 x | Flex Compact Term w 48" compressed vent |
1 x | Radiation Shield, 8" I.D. |
1 x | 4" Air Kit with Collar, Hood & 3' Flex |
1 x | Roof Flashing 6/12 to12/12 Pitch |
2 x | 1/2 Spring Handle-3 Pack |
1 x | 24" Masonry Grate 20mm / PC - Black |
2 x | ASH PAN-SALES |
1 x | Montecito Estate CAT Door Black |
1 x | Split Stacked Warm Red Masonry Firebrick Walls |
1 x | 12 X 6 Tile Frame-brt Nkl |
1 x | Decorative Ash Bed / Control Cover Kit |
1 x | EcoFlow Conversion Kit, Electronic, Natural to Propane |
1 x | BRICK PANEL-LEFT |
1 x | Anti-Draft Shield for Round Top Only |
1 x | 38/45/61/68 Brt Nickel Li |
1 x | Mini Rope Design Hoe - 18" L |
1 x | 3/8 ALUM J TUBE-SALES |
2 x | 1 IN RD-WHITE-HD-5 FT/KIT |
1 x | Damper Knob |
1 x | Glass Media, 5LB Bag, Reflective Blue |
2 x | 5in Double Paddle Blade |
1 x | T2300 |
1 x | Coastal Legs, Black |
1 x | Illusion Panel Backlight Kit |
1 x | Gravity Kit: 2 Elbows 90-Degree, 2 Telescopic Lengths, 2 Grill S |
1 x | Large Rope Design Fork |
1 x | Hospitality Rug - Half Round |
1 x | ADC MOTOR MOUNT-SALES KB |
2 x | 12 X 6 Tile Frame-brsh Ss |
1 x | Electronic Natural to Propane (Honeywell) |
1 x | 36" Perimeter Trim Kit - Black |
1 x | CAST DOOR-SALES |
1 x | Flex 5" I.D. X 15' long |
1 x | Outside Air Kit (4’’ I.D. x 10 ft. long insulated flex) |
1 x | Accin22in Ulhop/hopsw-sal |
1 x | Clean Face Panel Kit (Requires Gravity Kit) |
1 x | 18" Timber Oak Log Set, Ceramic Fiber |
1 x | Basement Vent Kit |
1 x | Acc52i Ashlip-maj Brown |
1 x | Power Vent Adaptor Kit 54-42 |
1 x | Platinum Glowing Embers |
1 x | Wrought Iron Wood Hoop - 48"H KD - New! |
1 x | 250 BRICK RETAINER-SALES |
1 x | Conversion Kit, Electronic Ignition, Propane to Natural |
1 x | Wall Mount T-Stat Control Kit |
1 x | Stacked Rust |
1 x | GASKET-HBF SILICA EXPLSN |
1 x | 1/2 Push On Cap |
1 x | Decorative Volcanic Stone |
1 x | 17-1/2IN FLAPPER-SALES |
1 x | BLWR RESTRICTOR PLATE-2PK |
1 x | BOILER BRICK ANGLES-4 SET |
1 x | Iron Rail, Decorative Accent Trim, Aged Silver |
1 x | 5-11/16 X 13-3/4 RECTGLAS |
1 x | 5 Pc Ball Handle - Round Base /Antique Brass/Black / Antique Bra |
1 x | Oak/tl3 Ash Door Latch |
1 x | BUSHING, BRONZE |
1 x | 12 X 6 Tile Frame-gold |
1 x | Auger Biscuit, Octagon – Includes A-BUSHTOP & C-F-088 1 |
1 x | P38 Ash Door Asy-flat-sal |
1 x | Warm Red Split Herringbone |
1 x | Blow Poker |
1 x | 5 Pc Tool Set - Puffin |
1 x | Smoke Pipe Damper 8" *Net / Net |
1 x | 13-3/4 X 19 Lge Rectglass |
1 x | 370 VAC MOTOR RUN CAPACTR |
1 x | Wrought Iron Wood Hoop - 48"H |
1 x | Corner Vent Kit |
1 x | Conversion Kit Propane to Natural |
1 x | Ceramic Stack Old Town Red |
1 x | Cast Cam Block |
1 x | 42" Fixed Door, Black |
1 x | Door - P1000, PCA/PCNA Version, P4000 1 |
1 x | Damper Steel Hndl/scr-bni |
1 x | Conversion Kit, Millivolt, Propane to Natural |
1 x | Twisted Rope Match Holder |
1 x | Air Filters-20x20x1-12 Pk |
1 x | 1-1/2IN SHAKER BAR-SALES |
1 x | LP to NG Conversion Kit |
1 x | BAFFLE-SALES |
2 x | 3/8 Od X 1/4 Oal-5 Pack |
1 x | Façade, Sante Fe, Black |
1 x | Extra Long Rope Design Brush - 36" L |
2 x | 35” Façade Panel – Stainless |
1 x | 50 piece Bulk Outside Air Kit - Collar Only Kit |
1 x | Millivolt, Propane to Natural (SIT) |
1 x | 42" Bi-Fold Door, Brushed Brass |
1 x | 2600 JCKT SIDE W/O HOLE-S |
1 x | Stainless on Bronze Tinted Glass |
1 x | 33 x 41 Black Trim (Includes black trim) No Switch |
1 x | 30 Degree Hi-Temp Offset and Return |
1 x | Gin/dvgin Xl Cord Harness |
1 x | Ivory Split Stacked |
1 x | Brass Protect |
1 x | Pellet - Coal Scuttle |
1 x | Round 7" Trivet - Blue |
1 x | NG to LP Gas Conversion Kit |
1 x | 8-1/2X14-15/16 RECT GLASS |
1 x | Millivolt - NG to LP |
1 x | Stacked Rust |
1 x | Sun Fireback |
1 x | 18" Standard Grate 20mm / PC - Black |
1 x | Decorative Ash Bed / Control Cover Kit (Six Pack) |
1 x | Defiant Non-cat |
1 x | Conversion Kit, Millivolt, Natural to Propane |
1 x | 4000w Tadpole Gskt-10 Ft |
1 x | Cast Door Hinge With Pin |
1 x | Wrought Iron Wood Holder - 18" |
|
$73,440.61 |
Shipping Charges |