Home » Login

Welcome, Please Sign In

New Customer

I am a new customer.

By creating an account at Stove King you will be able to shop faster, be up to date on an orders status, and keep track of the orders you have previously made.

Continue

Returning Customer

I am a returning customer.

E-Mail Address:
Password:

Password forgotten? Click here.

Manufacturers
Live Help

Available 9am-4pm
Search
 
Use keywords to find the product you are looking for.
Advanced Search
1 x Gravity Kit: 2 Elbows 90-Degree, 2 Telescopic Lengths, 2 Grill S
1 x Touch up paint firebox interior
2 x Draft Meter Assembly-sale
3 x 1/2 Pillow Block-4 Pack
1 x Pf1 Shaker Cvr Pp-sales
2 x Air Intake Gasket-set Of6
1 x Bio-120 Hpr Asy-sales
1 x BEARING 3/8 ID X 1-1/8 OD
1 x Pf100 25-1/2 Inch Hinge
1 x Pf1 Chain Shker Gskt-2 Pk
1 x Brick 12 X 6 X 1-1/4
1 x 1638 Cfm 4-speed Blower
1 x Box-4x4 Steel Bin
1 x Hopper Throat Gasket
1 x 4-3/4 Single Paddle Blade
2 x Bearing Retainer W/hdwr
1 x 3 Position Terminal Block
2 x 3/8 Od X 5/16 Oal-5 Pack
2 x Draft Meter Bolt & Tube
1 x Ul Motor Mount W/grommet
2 x 6 Amp Fuse-set Of 5
1 x # 47 burner orifice
1 x 1/2" X 18" Flex Line - Gas Inlet
2 x Dielectric Grease (Packet)
3 x 5/32" Allen key
1 x SF250 GLASS FRAME-SALES
1 x Black Flush Glass Trim (Each)
1 x Brick Clip (Each)
1 x 150/250 CLEANOUT MOUNT-SA
1 x 2 GRATE HOLDER-CAST
1 x Glowing Embers
1 x SHAKER HANDLE MOUNT-SALES
1 x LONG SHAKER HANDLE-SALES
1 x Bottom Black Louver Hinge (Each)
3 x Decorative Volcanic Stone
1 x GLUE-32 OZ GASKET-BIN
1 x Ceramic Stack Old Town Red
1 x 3 GRATE HOLDER-CAST
1 x Full Skid Of Brick-sales
1 x Conversion Kit, Electronic, Propane to Natural
1 x 1/2 Spring Handle-3 Pack
1 x Burner Orifice # 54 - LP - Rear
1 x GASKET-5/8 CHANNEL-5 FT
1 x BOILER BRICK ANGLES-4 SET
1 x SHAKER BLOCK-SALES
1 x Conversion Kit, Electronic, Natural to Propane
1 x GASKET-1/2 RD HD-20 FT
3 x Touch up paint powder coat exterior
1 x 5 HOLE GRATE LINK-CAST
1 x 15-1/2IN FLAPPER-SALES
1 x Mag Door Latch-set Of 4
1 x Ceramic Stack Heritage Brown
1 x Platinum Glowing Embers
1 x 4-1/2 X 8-1/2 RECT GLASS
1 x Ceramic Stack Black Tie
1 x Caution&danger Label-10ea
1 x EFW DOOR SPRING HANDLE - NICKEL
1 x Acc52i 22in Hopper-sales
1 x Log Scraps, Floor Media Kit
1 x Conversion Kit, Electronic Ignition, Propane to Natural
1 x Warm Red Split Herringbone
1 x 1200/1700 RIGHT SHIELD ASSEMBLY
1 x Shroud Leg Spacer Kit (for UL approval of field fab term covers)
1 x 400 PS 1992
1 x 6.0 lb. Bag Smooth Glass Pebbles, Green
1 x Slotted Cradle Gasket
1 x 4" Air Kit with Collar, Hood & 3' Flex
1 x CLASSIC GRILL-SALES
1 x Adv/61a/acc/68/xxv Harnes
1 x Glass Media, 5LB Bag, Reflective Blue
1 x 10 Rpm Motor
1 x 2 Pair Twisted Cat 3 Cabl
1 x Hpr Switch Fdr Fitting-2
1 x 1200/1700 O/S PANEL TRIM ONLY - BLACK
1 x 306w/120v Ignitor 15 Fin
1 x Pf1 4 Pole Thermostat Ext
1 x 4" Flex Adaptor
1 x Dual Arch Screen Kit
1 x Split Herringbone Warm Red Masonry Firebrick Walls
1 x Black - 21" L
1 x Glass W/gasket
1 x Stacked Rust
1 x EFW DAMPER HANDLE SPRING - NICKEL
1 x Set Of 7 Standard Bricks
1 x Receiver and Touch Screen Remote Control Kit
1 x Ivory Split Stacked
1 x Accin Snout Weldment-sale
1 x 5/16x1/2 Ball Plunger-3pk
1 x Blower Motor Only
1 x Accin Ul Snout Weldment
1 x 3/16 Rd Blk Ld Psa-10 Ft
1 x Pioneer Bay (Heritage) PI
1 x Accin/xxv Hinge Plate
1 x 1200 FSF LEFT SIDE CABINET
1 x 100/105 Flame Guide Insul
1 x Fem Disc-fully Ins-25/pk
1 x 50% TD LP VALVE
1 x 1200/1700 LEFT SHIELD ASSEMBLY
1 x Antique Brass Plated & Black - 21" L
1 x 68/35 Door Trim-brush Ss
1 x 6.0 lb. Bag Smooth Glass Pebbles, Amber
1 x Elan PS 1990
1 x Conversion Kit, Electronic Ignition, Propane to Natural
1 x Accin Therm Cable Lead 14
1 x 1200 & 1700 LEG KIT ASH DRAWER
1 x Flex Compact Term w 18" compressed vent
1 x Foxfire (400) PI 1993-1996
2 x Damper Clamp (Required in vented applications.)
1 x Outside Air Kit Collar, Hood & 3' Flex for Floor Venting
1 x 9mm X 13mm Tubing-5ft/kit
1 x Pc45 Feeder Auger
1 x 36" Mosaic Masonry™ Bi-Fold Door, Pewter Finish
1 x Wall Switch Kit, On/Off, White
1 x Variable Speed with Thermo Snap Switch
1 x Acc52i Ashlip-maj Brown
1 x Accin Hinge Retr-2 Sets
1 x BURNER SCREEN-SALES
1 x Ddm Replacement Cable Kit
1 x Accin Cast Heat Exch Cvr
1 x Mtr Brkt Grommets/spacers
1 x 18" Section Hi-Temp Double Wall Pipe Snap Lock
1 x Black Plated Knob W/screw
1 x Fan Switch Assembly Complete
1 x P-stove Ul Fdr Snout
1 x Accin Blwr Mnt-sales
1 x Outside Air Kit (4’’ I.D. x 10 ft. long insulated flex)
1 x Round Top with Louvered Screen
1 x AIR GUIDE-SALES
1 x Accin Pipe Insulation
1 x Pellet Comb Blower
1 x Flex Conduit 3/8-7 Ft/kit
1 x 61/45/68 Ash Pan-sales
1 x 1200 LEG KIT ASH DRAWER BOX
1 x 18" Red Wood Mountain Log Set, Concrete
2 x Fan Thermodisc (60T12) 110 Degree
1 x Warm Red Split Herringbone
1 x 3/8x1/2 Silicone Psa-20ft
1 x Conversion Kit, Electronic Ignition, Propane to Natural
1 x 400 PS 1990
1 x 6.0 lb. Bag Smooth Glass Pebbles, Blue
1 x Robertshaw Valve Only - LP
1 x Black Fireplace Hood
2 x Thermostatic On/Off Remote Control Kit
1 x Southern Comfort 24", VF Logs, Concrete 1/2
1 x Fan Speed Controller Knob 99/00/01/02/03/04
1 x Handle Asy-sms,tl3,68,xxv
1 x Decorative Ash Bed / Control Cover Kit
1 x Bulk50-hcs 5mm X 8mm Z
1 x Accin Fan Angle-sales
1 x Wall Mount On/Off Switch Kit
1 x Ivory Split Stacked
1 x 4" Air Kit, Collar & Hood Only
1 x Outside Air Kit
1 x WOODEN HANDLE WITH BOLT
1 x Accin Cb Plate-sales
1 x Flex Compact Term w 48" compressed vent
1 x 1200 CERAMIC BAFFLE - L/R SET
1 x 50" Bi-Fold Door, Brushed Brass
1 x Gas Ng Pilot Complete-pse
1 x Unit- mountable Rocker Switch
1 x Round Top with Mesh Screen
1 x Burn Pot Cleanout Cover-2
1 x 100/105 Air Pump Bkt-sale
1 x Vintage Red Brick Liner Kit 35
1 x Fitting Elbow 90 Degree (Located At Orifice End)
1 x Accin Cast Top-asy-sales
1 x 14ft Power Cord
1 x FILTER BOX-FURNACE
1 x 400 PI 1992
1 x 12" Section Hi-Temp Double Wall Pipe Snap Lock
1 x 50" Bi-Fold Door, Black
1 x Southern Comfort 30", VF Logs, Concrete 1/2
1 x Elan PS 1991
$30,919.96
Shipping Charges