$73.38

80501 THERMISTOR, LONG LEAD 1
[80501]

80501 THERMISTOR, LONG LEAD 1
This part is shown as 47 on the exploded diagram.
THERMISTOR LONG LEAD
Reviews
Manufacturers
Live Help

Available 9am-4pm
Search
 
Use keywords to find the product you are looking for.
Advanced Search
1 x Auger Stop Bracket 1
2 x PELLET FDR EXT SPRING
1 x Cabinet Side - Right
2 x Boiler Coil Washer 2/pk
1 x Adv Hopper Asy-sales-cb L
1 x 400 PI 1992
1 x Black Nickel
5 x Handle Asy-sms,tl3,68,xxv
2 x 3/8" X 13" Black Steel Pipe - Gas Inlet
2 x 2500/3500 SHAKER BAR-SALE
1 x Hf60 Comb Section Gasket
1 x 80554 ASSY, CONTROLLER PCB 1
3 x Esp Probe-red/red
3 x Fdr -2cleanout W/gskt-2pk
2 x Room Sensor
1 x 1 BURNER ASSEMBLY
5 x 4" Air Kit with Collar, Hood & 3' Flex
1 x DV42 VENTURI AND GASKET W/O AIR SHUTTER
1 x 4" Flex Adaptor
1 x Heat Activated On/Off Pre-wired Fan Kit 200 CFM 115V/60H/39W
1 x 3 FLAME PILOT HOOD
1 x 1 BURNER ASSEMBLY
1 x Platinum Glowing Embers
1 x ALUMINUM HOSE BARB (ALL PELLET)
1 x GEARMOTOR-1/80HP-4.5RPM
3 x Conversion Kit, Electronic, Propane to Natural
1 x TLC REAR HINGE-SALES
2 x Allen Key 3/16'' X 9'' 00/01/02/03/04
1 x Burn Pot Assembly GF55/GFI55
1 x LP to NG Conversion Kit
1 x Pioneer Bay (Heritage) PI
1 x HB38 30IN SCROLL DOOR
8 x Standard Single Speed
10 x Black 12oz Spray-258h
1 x CENTER GLASS RETAINERS TOP/BOTTOM (2) $
1 x Blower Screen (Each) 99/00/01/02/03/04
3 x Compact Termination Secure Flex
5 x Glass Media, 5LB Bag, Platinum
1 x 3.5 Inch Sprocket-sales
1 x 4-1/2 X 8-1/2 RECT GLASS
3 x Burn Pot Cleanout Cover-2
1 x Log Set
1 x 75CFM BLOWER-7FT CORD
2 x Damper Steel Hndl/scr-bni
2 x Conversion Kit, Millivolt, Propane to Natural
2 x # 37 burner orifice
1 x SMS BODY WELDMENT-SALES
8 x Draft Meter Bolt & Tube
3 x 3-piece Trim Kit, Stainless
2 x Low Profile Dual Blower II
1 x Leaves Toolset - New!
1 x 160/260/360 SHAKER BRACKT
2 x BRICK 9 X 4-1/2 X 2-1/2
1 x Gasket-pipe Stub
1 x Ceramic Stack Black Tie
1 x Tl/win Damper Wldmnt-sale
7 x Glass Media, 5LB Bag, Reflective Black
3 x 50 piece Bulk Outside Air Kit - Collar Only Kit
1 x 42" Surround, Stainless Matte
2 x 2 Position Rocker Switch
4 x 6.0 lb. Bag Smooth Glass Pebbles, Green
2 x SET OF CUT BRICK
3 x 12 X 6 Tile Frame-brsh Ss
1 x Door - P2000, Brushed Nickel 1
2 x Pigtail 3in Dkblue-fem/ma
3 x Air Intake Gasket-set Of6
2 x Tl/dvc/win Paw Bolt-modif
1 x Door Handle, Complete Replacement Kit 1
1 x Chain-60 Pin
1 x 16IN STNDRD FRAME-SALES
1 x Pane Design - Black
2 x Power Cord Kit, 3-Prong 110V - Standard
1 x ASH PAN-SALES
1 x Conversion Kit, Millivolt, Propane to Natural
3 x 3 POSITION ROCKER SWITCH
1 x CHALET ACCESS DOOR KNOBS (2) - AC
5 x Glass Media, 5LB Bag, Copper
1 x Acc52i 20in Hopper-sales
2 x 18" Timber Oak Log Set, Ceramic Fiber
2 x 300i Linkage Kit-sales
1 x Ivory Full Stacked
2 x Steel Sleeve Bushing
1 x SIDE COVER-RIGHT-SALE
1 x Nake Panel Kit, Black Satin Paint
1 x Pellet Stove Brush Rod
3 x Remote, Wireless Wall Mount, On/Off, Hi/Low, Electronic
3 x Distribution Blower-fasco
1 x Ash Cleanout Door 1
2 x Mission Style
1 x PUSHER ARM-SALES
4 x Tl Handle Asy-sales
1 x Lakeview Legs, Black
1 x 4000w Tadpole Gskt-10 Ft
1 x DV42 CAPE COD ACCESS DOOR
1 x ZC SUPPORT - MONTLAKE 300
3 x 42" Standard Bi-Fold Glass Door, Platinum finish
4 x 1/8 Silicone Tubing-5 Ft
8 x Burn Pot/tailpipe Gaskets
1 x 8-1/2X14-15/16 RECT GLASS
1 x Hopper Switch Retrofit Kit
3 x 3-Way Gold Contact Switch 99/00/01/02/03/04
2 x 3 Sided Flange, 34x46
2 x Hinge - Female Right 2
1 x Auger Motor
1 x Hf60 Comb Side Insulation
8 x Draft Meter Assembly-sale
1 x Acc Ul Fdr Asy-sales
1 x Panel for Clean Face Option (must use gravity kit)
1 x SHAKER HANDLE-SALES
1 x 80575 PCB, Circuit Board 1
8 x Wall Mount On/Off Switch Kit
2 x Ivory Split Stacked
1 x Ash Drawer Pedestal
1 x TOP WING ASY-BLACK
1 x 1-1/2IN SHAKER BAR-SALES
1 x 15-1/2IN FLAPPER-SALES
1 x 29-1/2 x 42 1/2 Black
2 x Boiler Coil Plate-sales
2 x DIN RAIL END CLAMP
2 x Adjustment Gear Assembly 99/00/01/02/03/04
12 x Decorative Volcanic Stone
1 x SCREW-HWH TCS 10-24 X 3/4
1 x TLC GRATE LINK-SALES
2 x 24" Timber Oak Log Set, Ceramic Fiber
1 x 40344 Front Liner 1
1 x Acc Lid Ballsprng Mnt-sal
2 x Compact Termination SV4.5
1 x Pc45 Feeder Auger
1 x 42" Standard Bi-Fold Glass Door, Black finish
1 x Auger GF55/GFI55
2 x 9mm X 13mm Tubing-5ft/kit
1 x Bulk50-hcs 5mm X 8mm Z
1 x Bezel, Black Nickel
1 x Arch, Nickel
1 x Micro Switch
1 x STUB KIT 4IN PL/FLX
1 x Traditional Brushed Nickel
1 x LEFT FIREBOX BAFFLE-SALES
1 x DUAL BULB DOOR GASKET (10FT)
2 x Gold Knob W/screw
1 x .125 Orifice, Style C
3 x BOILER BRICK ANGLES-4 SET
1 x Hf60 Draft Section-sales
2 x Variable Seed Blower with Manual Control
1 x Acc52i 22in Hopper-sales
2 x 300i Wing Supports & Hdwr
1 x 1/2 Pipe Thread Drain Bin
4 x GLUE-32 OZ GASKET-BIN
2 x Motor Mnt W/grommet-2 Pk
1 x Auger Brass Bushing & Plate GF55/GFI55
1 x Ceramic Log (A-M-LOG) 1
7 x Receiver and Touch Screen Remote Control Kit
4 x Wall Switch Kit, On/Off, White
1 x Brick Liner Kit, Buff
1 x 400 PS 1992
2 x Decal Control Panel - Rear 99/00/01/02/03/04
1 x Allen Key 3/16'' 99
1 x Conversion Kit, Millivolt, Propane to Natural
2 x CONTROL PANEL STICKER
2 x Flue Collar Heat Shield Vertical - Large
2 x Inv Handle Asy
1 x 100/105 Hprlid Catch-sale
5 x Variable Speed with Wall Switch
3 x Gasket-1/2 Rd Ld-20 Ft
3 x 16.5in Br Ss Ashlip Trim
1 x DV42 MANOR FACE MOUNTING BRACKETS
3 x Cast Cam Block
1 x 5-11/16 X 13-3/4 RECTGLAS
1 x Ember/Lava/Vermiculite Package Complete
6 x Variable Speed with Thermo Snap Switch
2 x Pigtail 3in Skyblu-fem/ma
1 x SET OF CUT BRICK
2 x Stacked Rust
3 x GASKET-5/8 CHANNEL-5 FT
5 x SHAKER BLOCK-SALES
2 x (83529) Auger Pin 1
3 x 3/8x1/2 Silicone Psa-20ft
6 x Glass Media, 5LB Bag, Reflective Blue
3 x 6 Amp Fuse-set Of 5
2 x AUTO DRAFT CONTROL-SALES
1 x PUSH BLOCK FEED IND HDWR
3 x ASH DOOR ASY-SALES
2 x Quick Disconnect Pipe Connector 4"
2 x Starter Kit: for Wall or floor installations. Includes blower (B
1 x Bezel, Brushed Nickel
1 x GASKET-3/16X5/8 FLAT-10FT
1 x Ash Door Hinge With Bolts
2 x Airwash Glass Spacer Set
2 x Ul Pellet Feeder Auger
1 x Conversion Kit, Electronic, Propane to Natural
1 x Foxfire (400) PI 1993-1996
6 x 1/2 Pillow Block-4 Pack
1 x Flame Guide-advance
5 x 38 X 4 Ul Fdr Pusharm-sal
1 x Cast Faceplate Mounting Bracket Left
1 x Bulk50-flng 1/4-20 X 1/2
1 x Brick Panel Set GF55/GFI55
2 x # 47 burner orifice
1 x AIR INTAKE-SALES
1 x Bulk100-close End Pop Rvt
1 x BRICK BRACKET-SALES
1 x HB38 REMOTE BLOWER ASY-SA
2 x Drain Pan
1 x DV42 CEMENT BOARD PACKAGE
1 x 160 Degree Thermodisc - Convection GF55/GFI55
1 x 5/8" I.D. Auger Collar With Screw
1 x Acc52i Ashlip-maj Brown
2 x Conversion Kit, Electronic Ignition, Propane to Natural
1 x ASH PAN-SALES
2 x Herringbone Rust
2 x 40314 Shaker Grate Section 5
1 x Decorative Face Trim, Aged Silver
8 x BEARING 3/8 ID X 1-1/8 OD
1 x 80530 Room Blower - 800 CFM 2
2 x 26735 Surround, Left 1
1 x Adjuster Kit
1 x DV42DX CONTROL PANEL
2 x Gas Ng Pilot Complete-pse
1 x 1450 Cfm Single-speed Blower
1 x Minuteman International S-Series Shaker Series Hearth Twin Door
1 x Combustion Package Cap
2 x 8IN DIN RAIL
1 x Clean-Out Door 12"x12" / Cast Iron
1 x Burner Tube - NG/LP
2 x 42" Perimeter Trim - Platinum
1 x 3 Sided Surround, 41"x26"
1 x Color Control Label
2 x 2 GRATE HOLDER-CAST
2 x BRASS MALE COMP FITTING
2 x Elbow 90-Degree, 8" I.D.
1 x Louvers, Black
1 x Conversion Kit, Electronic, Natural to Propane
1 x Classic Screen Kit
2 x Boiler Coil Assembly
7 x 4" Air Kit, Collar & Hood Only
2 x Arch, Brushed Nickel
1 x 3-Piece Trim Kit, Black
1 x Hf60 Feeder Insulation
1 x 3/4 Feeder Tensioner Uhmw
1 x Hf60 Fdr Top Insulation
2 x AQUA TERM BLOCK BOX-SALES
1 x 1in Single Ply-10 Ft/kit
4 x LONG SHAKER HANDLE-SALES
3 x Caution&danger Label-10ea
2 x Ivory Split Stacked
1 x 300i Power Cord W/vsc
1 x GRATE INSERT
1 x 80549 PRESSURE SWITCH 1
1 x FEEDER DUST TRAY-SALE
1 x Burn Pot Liner Ss High Ash GF55/GFI55
1 x HB38 32IN ARCH SCROLL GRI
1 x 38/45/61/68 Retr Asy-sale
1 x Door Latch-painted-sales
1 x Acc Screen Frame-pntd-sal
1 x 83005 10-24X1/2 MS TR PH FL BLK 4
1 x 1/2-13 Red Nylon Knob
2 x ROPED MAG LOAD DOOR-SALES
1 x Ceramic Stack Old Town Red
1 x 83244 Kep Nut, 10-24 3
1 x BRICK PANEL-LEFT
4 x Caution Label-15 X 3 Blk
1 x SMS EXTENSION SHAFT
1 x Hf60 Fdr Cover Right-sale
1 x Embers - Bag
2 x Hopper Throat Gasket
1 x Fdr Slide Plate Asy-sales
4 x Unit- mountable Rocker Switch
1 x COMBUSTION / EXHAUST BLOWER ASSEM. 115V(FORMED)(POST 10-03)
2 x 26" Perimeter Trim Kit, Black
1 x Bezel, Black Satin
2 x GASKET-1/2 RD HD-20 FT
6 x D-shape Knob/shaft-25 Set
1 x Burn Pot Liner Standard SS GF55/GFI55
2 x Boiler Gasket-3/16 In Pt
4 x Tl/dvc/win Glass Clip-4
3 x Diagnostic Display Module
2 x FLAPPER HOOK W/HOLE-SALES
5 x Outside Air Kit Collar, Hood & 3' Flex for Floor Venting
4 x Bearing Retainer W/hdwr
1 x 42" Fixed Door, Brushed Brass
1 x 105 ASH CHMBR INSUL-BACK
2 x Stacked Rust
1 x Heat Shield
1 x MAG GRATE-CAST
2 x SHAKER HANDLE-PAINT-SALES
1 x SIDE WING ASY-BLACK
1 x BRICK ANGLE-SALES
1 x Hf60 Draft Sect Refr Side
1 x 820 NOVA VALVE-PROPANE
2 x 26731 MAIN WRAP 1
2 x ASH PAN-SALES
3 x Glass Media, 5LB Bag, Goldfinger
3 x Full Skid Of Brick-sales
1 x AUGER BRASS BUSHING 5/8" ID & PLATE (POSTJAN01/ 08)
2 x 36" Bi-Fold Door, Black
3 x Gasket-ceramic Insert Plt
2 x 33 x 48 Black Trimmable
1 x Acc Epdm Dist Blwr Gasket
1 x Wrought Iron Damper Pull / PC - Graphite
1 x 18IN VALVE HARNESS
2 x Bulk100-fhn 5/16-18 Z 5
1 x 3 Sided Surround, 46"x 26"
6 x Set Of 7 Standard Bricks
1 x Cabinet Side - Right
1 x BLOWER CVR-SALES
1 x NG to LP Gas Conversion Kit
1 x HB38 BACK LOG
1 x Hf60 Ash Pan Asy-sales
2 x 40312 Grate Retainer 2
2 x 3/16 Rubber Spacer-10pack
2 x ADC COVER-PAINTED-SALES
6 x Log Scraps, Floor Media Kit
12 x Touch up paint powder coat exterior
1 x Acc52i 24in Hopper-sales
4 x Fem Disc-fully Ins-25/pk
1 x ROPED DOOR-PNTD-SALES
1 x Conversion Kit, Millivolt, Propane to Natural
1 x Liner Kit Porcelain, Black Enamel
1 x SMS DOOR ASY-SALES
1 x 36" Perimeter Trim Kit - Platinum
1 x Pf100 Filter Cover-sales
1 x Electronic, Propane to Natural (SIT)
1 x Compact Termination SV4.5 20" w shield
1 x Heat Exchange Tube Cleaning Rod - P23F 1
1 x Oak/tl3 Damper Adj Kit
1 x Piezo (ignitor) With Nut
1 x Tl2.6 Ash Pan-(legs)
1 x Rear Burner Tube
1 x 5/8" I.D. AUGER BRASS BUSHINGS (SET OF 2) (POST JULY01/08)
1 x Vintage Red Brick Liner Kit 40
1 x 68859 Conduit Assembly (1ft) 1
1 x Diamond Curved Screen
1 x Chimney Support (For Use With Chimney Heights In Excess of 30')
1 x 36" Vent-Free Firebox Vintage Fiber Liners
2 x Herringbone Rust
1 x TI 2201
1 x AUGER WITH PADDLES
1 x 80472 Distribution Blower 1
2 x Conversion Kit, Electronic Ignition, Natural to Propane
1 x Contemporary - II Rect.
1 x SHAKER BAR-SALES
3 x Bulk25-rphms 1/4-20x2-1/2
1 x 30" Timber Oak Log Set, Ceramic Fiber
1 x 4 - Tool Fireset Pewter & Black
1 x Well Wel11a-601r
1 x POWER CORD
1 x CONVERSION KIT BV TO DV
1 x Nickel Plated Slide Spring Handle for Damper
1 x Conversion Kit, Millivolt, Natural to Propane
1 x Cypher Fatwood Caddy w/ Fatwood
1 x Gasket Set/3-40-358110pkg
1 x Rectangular Rug Mesa Tan / Khaki/Taupe
1 x Handle Replacement Kit - P23, P24, P1000PWA/PWC 1
1 x 5/8 ID AUGER COLLAR W SCREW
1 x Xxv Door Only-sales
2 x HOT WATER COIL HDWR
1 x Conversion Kit Propane to Natural
1 x 5 Pc Ball Handle - Square Base
1 x 40587 TOP 1
1 x 69867 Access Doors 1
1 x EcoFlow Conversion Kit, Electronic, Propane to Natural
1 x CABINET SIDE (LEFT)
1 x Ceramic Stack Heritage Brown
1 x Spark Guard Screen - 39 1/2"W x 29 1/2"H
3 x Flame Guide-38p/p61/100
5 x Mag Door Latch-set Of 4
1 x 26732 CENTER SUPPORT 1
1 x 80501 THERMISTOR, LONG LEAD 1
1 x 40246 Flue Collar 1
1 x 3/8" NTP MALE 3/8 COMP. 90 DEG. ELBOW
3 x Bolt On Ash Dr Hinge-sale
1 x 105 WATER JACKET INSULATN
1 x AUGER PLATE AND BUSHING (ASSEMBLY)
1 x Adjustable Length, 8" I.D. (2" - 5")
1 x Damper Kit
1 x 4-3/4 Double Paddle Blade
1 x BOILER ELECTRIC BACK UP
5 x Bulk100-fhn 1/4-20 Z 5
1 x Millivolt - NG to LP
1 x 36" Perimeter Trim Kit - Brushed Brass
1 x ASH PAN-SALES
1 x Coal Hod / Pellet Bucket w/ Scoop / PC - Black
1 x Tl300 Outside Air Plate-s
1 x Spring Clip-20 Pack
1 x CAPE COD CONTROL PANEL DOOR
1 x 69679 Feed Door Assy. (w/Rope Gasket) 1
1 x GIN RGT WING BRKT-SALES
1 x Sprig Candelabra - New! / PC - Black
1 x Flex Compact Term w 48" compressed vent
1 x FILTER BOX-FURNACE
1 x Iron Rail, Decorative Accent Trim, Aged Silver
1 x 33 ELITE FLUSH PLUS RECTANGULAR
1 x English Country Tool Set
1 x Liner Kit Ceramic, Trad. Buff
6 x Touch up paint firebox interior
1 x Buff Rustic
1 x 80145 Honeywell Limit Control 1
2 x Clarity Burner Tube Set
3 x Bulk50-hcs 1/4-20 X 1/2
1 x 69848 WELDMENT, FRESH AIR 1
1 x 68/tl3 Ball Sprng Brkt-sa
1 x AGITATOR MOUNTING BRACKET ASSEMBLY
1 x PUSHER ARM-SALES
1 x Bulk50-hcs1/4-20 X 1/2 G8
1 x 35” Façade Panel – Black
1 x CAST DOOR-SALES
1 x Pellet Comb Blower
1 x ANTIQUE BRASS PLATED & BLACK 4PC TOOL FIRESET
1 x LATCH ADJ-RGHT-SALE
1 x Tl300 Airslide-sales
1 x SHKR HANDLE-PNTD-SALES
1 x 69516 Feed Door Assembly 1
2 x 30 Degree Firestop Spacer (1ea.)
1 x EG31 BV DRAFT HOOD CONNECTOR
1 x Suede (Dark Brown) Log Carrier
1 x Oval Tub / Iron w/ Black
2 x Oak/tl3 Ss Brick Clip Set
1 x Tool Set - 5 pc - Shepherd's Hook III
1 x Stove Panel Bracket Kit
1 x Frontier, Decorative Accent Trim, Aged Silver
1 x Oval Tub w/ Wrought Iron Handles / Copper
1 x Fatwood Caddy - Pointsetta - New! / Black w/ Various
1 x SHAKER SHAFT
1 x 4 Sided Flange Trimmable, 38x46
1 x 105 Water Jacket Insulatn
2 x 12 X 6 Tile Frame-brt Nkl
1 x Control Board Knob Pkg-10
1 x PEWTER & BLACK 4PC TOOL FIRESET
1 x 69953 DOOR ASSEMBLY 1
1 x Door - P23, Brushed Nickel 1
2 x Airwash O Ring-10 Pack
1 x SET OF CUT BRICK
3 x Glass Media, 5LB Bag, Disk, Midnight
1 x Open End Log Carrier - Ochre
1 x Telescopic Length, 8" I.D. (15" to 26")
1 x TL2.6 W/LEGS AD ROLLERS
1 x 69529 Pedestal 1
1 x Fatwood Caddy Refill - 4 Lb Bag / Wood
1 x Fdr Cvr-sales
1 x FILTER BOX-FURNACE
1 x 36" Outdoor Bi-Fold Glass Door, Brushed Brass Finish
1 x Navy w/ Tan Trim Canvas Log Carrier
1 x Birds Summer Screen
1 x Selected Small Parts with Similar Costs
1 x BOSTON 1200 FS CAST SIDE LEFT-PD
2 x 5 Pc Tool Set - Loop
1 x Pellet Grill Bushing for Auger
1 x EcoFlow Conversion Kit, Electronic, Natural to Propane
2 x 5 Pc Ball Handle - Square Base
1 x Suede (Patchwork) Open End Log Carrier
1 x 26736 Surround, Right 1
1 x BRICK-X • Masonry Cleaner
8 x Thermostatic On/Off Remote Control Kit
1 x #10 ID X 5/16OD X 3/8
1 x BACK GRILL (BOTTOM)
1 x Traditional Spark Guard - 38" x 31"
1 x Twisted Rope Fatwood Caddy / PC - Graphite
1 x Sprocket Replacement Kit
2 x Box-4x4 Steel Bin
1 x 40561 ASH PLUG 1
1 x Tool Set - 5 pc - Shepherd's Hook I
1 x Conversion Kit, Electronic, Natural to Propane
1 x GASKET-SS MESH COVERED
1 x (892002) Door Handle, Spring – Gold 1
1 x 160 SHAKER BAR-SALES
1 x # 33 burner orifice
1 x Liner Kit Porcelain, Black Enamel
4 x Log Scraps, Floor Media Kit
1 x BOSTON 1200 FS CAST TOP-DB
1 x Nickel Plated Large Spring Handle
1 x 48 Inch Hopper Lid Switch
2 x 306w/120v Ignitor-10 Pack
1 x 1000 Cfm 3-speed Blower
1 x BACK GRILL (TOP)
1 x Acc Block Gasket Set
2 x GASKET-3/8 RD HD-5 FT
1 x EcoFlow Conversion Kit, Electronic, Natural to Propane
1 x 105 Wiring Harness
1 x Auger Cover Plate 1
1 x 3 Sided Flange, 26x37
1 x 26" Extruded Louvers, Platinum
1 x All Black Ash Bucket / PC - Black
1 x SHAKER HANDLE MOUNT-SALES
2 x EcoFlow Touchscreen Remote, Electronic
1 x Spring Handle for 3/8" Handle
6 x Glowing Embers
3 x Decorative Ash Bed / Control Cover Kit
1 x 5.6" COMBUSTION IMPELLER
1 x Platinum Glowing Embers
2 x Glass Media, 5LB Bag, Disk, Sunset
2 x Flex Compact Term w 18" compressed vent
3 x Acc/38/45/61 Wooden Handl
1 x Win Power Cord W/vsc
1 x Length 2ft.
1 x Snap Disc Control
1 x 24" Scarlet Oak Logs Set, Concrete
3 x Frontier, Decorative Accent Trim, Aged Silver
1 x CONTROL BRD & PLATE
1 x 105 WATER JACKET INSULATN
1 x Tl300 Ash Door Asy-sales
1 x 80485 Wiring Harness, Main 1
2 x Tl3 Side Brick Bkt
2 x P68 Ad Latch Asy-sales
1 x Service Video
1 x Face Plate, Nickel
1 x 26413 Surround, Right 1
1 x 26" Extruded Louvers, Black
2 x 24" Section Hi-Temp Double Wall Pipe Snap Lock
1 x 69506 Cabinet Support, Top/Left 1
1 x 4 pc. Tool Set - Ball Handle - Rectangular Base - Black - 30"H
1 x Arts & Crafts Curved Screen
1 x GIN LEFT WING BRKT-SALES
2 x Remote, On/Off, Hi/Low, Electronic
1 x 69354 Blower Assembly (B36) 1
2 x D/bvg/gin/flx Snapdisc
1 x Acc/xxv 16x8 Hpr Lid Glas
3 x Glass Media, 5LB Bag, Disk, Cloud
2 x 5/16x1/2 Ball Plunger-3pk
1 x EcoFlow Conversion Kit, Electronic, Propane to Natural
1 x Novasit Pilot orifice
1 x Large 3F Screen Child Guard Stove
2 x SINGLE BRN REMOTE CONTROL
1 x Rear Flue Retrofit-tl2.6
1 x 1/4 Silicone Tubing-5 Ft
1 x Accin/xxv Door-pntd-sales
1 x TL2.6 W/LEG AD HINGE KIT
1 x REAR HEAT SHIELD-SALES
1 x Heat Shield
1 x EXT SPRING 3/4 X 4 X .085
1 x Door Latch Roller Hdwr
1 x EMBER STRIP-ONE PIECE
1 x REAR LOG
1 x Pellet - Coal Scuttle
1 x # 30 burner orifice
1 x 69594 Primary Bushing Assembly 1
1 x RAMP ASY-SALES
1 x ORIFICE-LP-MALE-#53
1 x Coal / Pellet Scoop / PC - Black
1 x Conversion Kit, Millivolt, Natural to Propane
1 x Electronic Ignition - NG to LP
1 x Blower Leg Set
2 x 1/2-13 X 12 All Threadbin
1 x Bottom Black Louver Hinge (Each)
3 x Wall Mount T-Stat Control Kit
1 x 30 Degree Hi-Temp Offset and Return
1 x Rev F Of 3-20-00744 Probe
2 x 38/61/45 Door Trim-br Ss
1 x 42" Fixed Door, Platinum
1 x Warm Red Full Herringbone
1 x Arts and Crafts Tool Set
2 x Liner Kit, Black Paint
2 x Standard Electronic On/Off Remote Control Kit
1 x PILLOW BLOCK BEARING
1 x Door Hinge Pin 2
1 x SF260 JCKT SIDE W/HOLE-SA
1 x ASH PAN
2 x Damper Shaft Ret & Hdwr
1 x BLACK CLASSIC DOORKIT
1 x AUGER PLATE AND BUSHING (ASSEMBLY)
1 x 4" EXHAUST - STARTER TUBE GASKET
1 x 1 PC. GLASS W/TAPE (6FT)
1 x Tool Set - 5 pc - Shepherd's Hook IV
1 x Conversion Kit Propane to Natural
1 x Decorative Log Set, Pellet Md.
1 x RIGHT SIDE
1 x 69768 WELDMENT, ASH PAN HOUSING 1
1 x FUSE HOLDER-TIMERBOX
1 x 5 Pc Tool Set - Shepherd's Hook
1 x Black Candelabra
2 x GASKET-5/8 RD HD-10 FT
2 x Bulk25-5/16-18 Wing Nut
1 x 1" KNOB
2 x Feeder Crossover Tube Kit
1 x Highliner, Decorative Accent Trim, Aged Silver
1 x Tl2/3 Hinge Spacer-sales
1 x Pf120 Outer Ash Door Asy
1 x PAINTED DOOR ASY-SALES
1 x Old Town Red Brk Lnr Kit 35-Herringbone
1 x REPLACEMENT FOR WHITE-ROD
1 x 48" Section Double Wall Pipe Snap Lock
1 x 38/45/61 Ld Door-sales
1 x RIGHT WING CVR-PNTD-SALES
2 x LP to NG Conversion Kit - TCC
2 x Flex Conduit 3/8-7 Ft/kit
6 x Gas Appliance Installation Kit
1 x Half Round Rug Amber/Green / Amber/Brown
1 x PUSHER BLOCK ADJ ROD-2PER
1 x 36" Fixed Door, Black
1 x RELAY-LOW VOLTAGE-FURNACE
1 x ZC-SUPPRT-ML230
1 x 40313 Back Liner 1
1 x Color Control Label
1 x 2500 JCKT SIDE W/O HOLE-S
1 x Coal Hod / Pellet Bucket - Small / PC - Black
1 x 1200 CERAMIC BAFFLE - L/R SET
1 x ADC HINGE BIN
6 x Black Fireplace Hood
2 x 48" Section Hi-Temp Double Wall Pipe Snap Lock
1 x Gas Fireplace Glass Cleaner
1 x 40566 LEG, CAST IRON 4
3 x Adv/xxv Latch-set Of 2
1 x Bp Ceramic Insert-10 Pack
1 x Conversion Kit, Electronic Ignition, Propane to Natural
1 x CAM ASY-SALES
1 x Glass Cleaner & Conditioner
1 x Stainless Steel Outdoor Weather Cover
1 x Gas Conversion Kit Electronic Ignition - LP to NG
1 x FILTER BOX-FURNACE
1 x Queen Anne Leg W/hdwr
2 x Flex Compact Term w 36" compressed vent
1 x Oak/tl3 Ash Door Latch
1 x SMALL FLUSH INSERT RECTANGULAR
1 x 69839 Door Assembly 1
1 x BOILER WATER PLATE WELDMT
1 x 80456 Drive Motor (Agitator) 1
1 x 42" x 60" Braided Wool Rug - Regal
1 x Front Burner Tube W/ext
1 x Millivolt, Natural to Propane
1 x Pellet Service Video (Pre-2004, on DVD)
1 x 105c 8ft Power Cord
1 x 42" Outdoor Bi-Fold Glass Door, Platinum Finish
1 x Buff Brick Liner Kit 45
1 x Ball Plunger Hose Clamp - Bottom Louver (Each)
1 x FEEDER CAM BLOCK
1 x Decorative Carriage Bolt For Handles/Hood - Black (Each)
1 x BOSTON 1200 FS CAST SIDE RIGHT-DB
2 x Ivory Split Stacked
3 x 4 Output Circ Brd-sales
2 x Flex Compact Term w 24" compressed vent
1 x Adv/acc/xxv Fdr Ccw Motor
2 x 29 x 41 Black Trim (Includes black trim) No Switch
1 x Fireplace Insert Insulation (KK0111)
1 x 18-3/8IN FLAPPER-SALES
1 x 6.0 lb. Bag Smooth Glass Pebbles, Amber
1 x Defiant 1910/1945
1 x ASH PAN
1 x Rear Heat Shield-tl2.6
1 x Fatwood Caddy - Colonial / PC - Black
1 x Black Screen
3 x Floor Media Kit (Includes Lava Rock/Embers/Cinders)
2 x Electronic, Natural to Propane
1 x Blower Assembly
1 x Tlc/oak/tl3 Wood Knob-3pk
1 x Bulk-pnd In Stud 8-32x3/4
1 x THERMOCOUPLE PROBE W/NUT
1 x Bulk50-hcs 1/4-20x3/4 G8
1 x Stacked Rust
1 x 38/45/61/68 Fdr Cover-sal
2 x Adv/61a/acc/68/xxv Harnes
2 x Anti-Draft Shield for Round Top Only
3 x SCREW-BHSCS 10-24 X 3/8
1 x Black Candelabra
2 x BRUSH CHROME KNOB W/SCREW
1 x Door Left Cast - Charcoal Grey
2 x 38/61/45 Door Trim-gold P
1 x Fan Limit Switch
1 x AUGER STOPS (CLEAR RUBBER)
1 x Glass W/gasket
1 x 61/a/facc/fxxv Push Arm-s
1 x Façade, Sante Fe, Black
1 x European Copper Term. Adaptor Kit - 8"
1 x Ash Pan – P23F on Legs 1
1 x 5 pc. Ball Handle - Round Base - Polished Brass & Black
2 x FURNACE FILTER BOX CLIP-S
1 x Thermostat Extension
1 x Spark Guard Screen - 50"W x 36"H
1 x 4 pc. Tool Set - Contemporary - Round Base - Black
3 x PILLOW BLOCK-3/4IN FLANGE
1 x 36" Fixed Door, Platinum
2 x 5 Pc Tool Set - Rope
1 x Rectangular Rug True Blue / Navy/Biscotti
1 x LONG GRATE 15 IN-CAST
1 x ASH PAN-SALES
1 x Gas Lp Pilot Complete-pse
1 x Coal Hod / Pellet Bucket - Large / Antique Copper Finish
1 x Pf100 Chain Shaker-sales
1 x 3/4IN SQUARE PLUG BIN
1 x 29 x 41 Black Trim (One-piece) No Switch
1 x 36" Mosaic Masonry™ Bi-Fold Door, Ebony Finish
1 x 68/35 Door Trim-gold
3 x 38/45/61/68 Brt Nickel Li
1 x BOSTON 1200 FS CAST TOP-PD
1 x Façade, Contemporary
1 x Oakl Damper Plate
1 x Acc52i Fdr Asy-sales
1 x 32-1/2 X 44 WINGS-BLACK
2 x Loop Toolset
1 x LARGE FLUSH INSERT RECTANGULAR
1 x Venetian Tile
2 x 38/44/61 Handle Asy-sales
1 x Glass & Fireplace Cleaner Extra Strength
1 x 2500 JACKET SIDE W/HOLE-S
1 x FUSE HOLDER
1 x Video for Auto-Start Pellet Stoves
1 x 42" Standard Bi-Fold Glass Door, Brushed Brass finish
3 x Glass Media, 5LB Bag, Disk, Sky
1 x MAG LEG-PAINTED-SALES
1 x 69874 Pedestal Base 1
3 x Arrow Bp Scraper-10 Set
1 x Tl3 Door Asy-sales
3 x Decorative Ash Bed / Control Cover Kit (Six Pack)
1 x 26-1/2 x 41 Black
1 x Control Panel, Digital 1
1 x Black Plated Knob W/screw
1 x SET OF CUT BRICK FORSF160
1 x Electronic, Natural to Propane (SIT)
1 x Oakl Top Load Handle Kit
1 x Façade, Deco, Black
1 x Pf100 Blower Bracket-sale
1 x Inlet Brick W/air Plates
2 x "B" Vent Transition Collar - 8" Chimney
1 x 26415 Access Panel 1
1 x Outdoor Window Kit (Dark-Tinted Glass) w/Outdoor Barrier
1 x Façade, Deco, Black
1 x 69674B Front Filler 1
3 x 4 Sided Surround, Trimmable, 46" x 38" (for use with F3408 Full
1 x #73 BLANK ORIFICE 3/8" x 27
1 x Conversion Kit Natural to Propane
1 x NON-ELEC DRAFT CNTRL-SALE
1 x 26-1/2 x 48 Black
1 x Firebox Canopy, Powder Coat
2 x 5in Double Paddle Blade
1 x 31 x 48 Black
1 x Tl3/sms Leaf Trim-br Ss
2 x 29 x 48 Black Trim (Includes black trim) No Switch
1 x EG31 DV DRAFT HOOD CONNECTOR
1 x Oakleaf Base Plate-sales
1 x Liner Kit Ceramic, Trad. Red
1 x 4" EXHAUST - 5" LONG STARTER TUBE
1 x FEEDER CLEANOUT-SALES
1 x BLUE ANGEL OIL BURNER
2 x Tl3 Load Door Latch Hdwr
1 x 33 ELITE FLUSH PLUS ARCHED
1 x Pellet Grill Door Hinge
1 x Conversion Kit, Electronic Ignition, Natural to Propane
1 x Hour Meter
1 x MAG ASH DOOR-SALES
1 x Conversion Kit, Electronic Ignition, Propane to Natural
1 x Junc Box Harness Bio-120
1 x SHAKER REPLACEMENT-TLC
2 x Male Disc-fully Ins-25/pk
1 x Candelabra - Contours / PC - Black
1 x Conversion Kit Natural to Propane
1 x Plastic Switch Receptacle - Gang Box
1 x Ul Motor Mount W/grommet
1 x 45 Ceramic Ins Plate-sale
2 x 12 X 6 Tile Frame-gold
2 x Cast Door Hinge With Pin
2 x BEARING 3/8 ID X 1-1/8 OD
1 x 12" Conversion pipe from 8DM to FTF8
1 x Tl2.6 Ash Door Asy-(legs)
1 x Conversion Kit, Electronic Ignition, Propane to Natural
4 x Bulk-1/4-20x5/8 Wingscrw
1 x Log Carrier Stand
1 x ELEMENT COVER WLDMNT-SALE
1 x Video for Multi-Fuel Stove | Product Number
1 x LP VALVE ASY-SALE
1 x Tl300 Comb Pkg Cvr-sales
1 x Contemporary - II Rect.
1 x Cold Air Collar Kit - 8" Chimney
1 x Touch Up-maj Brown Enamel
1 x Rectangular Rug Sangria / Red/Brown
1 x Glass Cleaner
2 x COIL HOLE-SALES
1 x Vintage Red Brick Liner Kit 45
1 x Burner Orifice #51 - LP
1 x 1200 MID SECONDARY AIR TUBE D
1 x 4 - Tool Fireset Black
1 x Classic Screen Kit
1 x SHAKER REPLACEMENT-TLC
1 x Warm Red Full Herringbone
1 x 69942 Heatshield Weldment 1
1 x Gas Conversion Kit Electronic Ignition - NG to LP
1 x Silicone Gasket-swing Plt
1 x BLACK 4PC TOOL FIRESET
1 x Cleaning Tool 1
1 x Tl300 Ash Pan-sales
1 x Façade, Deco, Black
1 x Pf120 Filter Bx Kit
1 x LATCH ADJ-LEFT-SALE
2 x Bulk50-hcs 3/8-16 X 1 Z
1 x Acc52i Top-maj Brown
1 x 450w Igniter W/instructs
1 x Creosote Cleaner Liquid
1 x 18.5 X 28.9 RECT GLASS
1 x Tan/Navy Canvas Log Carrier
1 x HOPPER SPOT-SALES
1 x Fatwood Caddy Refill - 8 Lb Bag / Wood
1 x Brass Protect
1 x CHROME PLATED 4PC TOOL FIRESET
1 x 80390 170°F Snap Disc (High Limit) 1
1 x Dvg/bvg Lp Conv Kit-sales
1 x Ash Door Asy
1 x 40588 SIDE 2
1 x Liner Kit Porcelain, Black Enamel
1 x 40515 Handle 1
1 x Burner Tube Assembly - NG/LP
1 x 4 Piece Fireset Tools Black
1 x 80461 Power Supply Cord 1
1 x ASH PAN DOOR
1 x 42" Mosaic Masonry™ Bi-Fold Door, Ebony Finish
1 x Hpr Muffler/fitting-1 Set
1 x Ivory Full Stacked
1 x LOAD DOOR TOP-SALES
1 x 40% TURN DOWN VALVE-LP
1 x Control Panel Faceplate for A-E-401 1
1 x AGITATOR DRIVE SHAFT W/SPROCKET
1 x Thermopile-for Both Pilot
1 x 42" Bi-Fold Door, Black
1 x 36" Stainless Steel Hood w/4" Brow
1 x Pre-paint Aerosol Touch-u
1 x Hearth Hooks Tool Set
1 x Flame Guide-xxv/accin/p68
1 x CLEAR FLAME Glass Door Cleaner
1 x 3F Screen Child Guard Stove
1 x Air Pump Rubber Feet-4
1 x 68/35 Mod Trim-brush Ss
1 x Town & Country Screen Lrg.
2 x Pellet Fdr Cw Motor-4rpm
1 x 36" Standard Bi-Fold Glass Door, Platinum
1 x Manor House Tool Set *Net / Net
1 x Herringbone Rust
1 x Cam Latch – P23, P1000PWA, P24 1
1 x 1/4" X 1" Glass Nutsert (Each)
3 x Iron Rail, Decorative Accent Trim, Aged Silver
1 x Brick Panel/Ember Base - Set Of 3
2 x 5 Pc Tool Set - Puffin
1 x SF260 JCKT SIDE W/O HOLE-
1 x 69872 Ash Plug 1
1 x Rectangular Rug Amber/Green / Amber/Brown
1 x ASH PAN DOOR
1 x Half Round Rug Sangria / Red/Brown
1 x Adv/dvc Retainer Asy-sale
1 x SCREW-SSS CP 10-24 X 3/8
1 x 3 Sided Flange, 31x46
1 x 69528 Damper (891226) 1
1 x BOILER KIT ASY-SALES
2 x 38/61/45 Door Trim-bright
1 x Oakl Ash Pan-sales
1 x Helix Tool Set
1 x 4" EXHAUST - 5" LONG STARTER TUBE
1 x Hammer-Tone Iron - Curved Folding
1 x Connector 3/8" Compression X 3/8" Male (Valve
1 x Log Bracket Kit (required With Ceramic Log)
1 x 69595 Secondary Bushing Assembly 1
1 x SINGLE MAGGLASSFRAME-SALE
1 x 36" Fixed Door, Brushed Brass
1 x 36" Vent-Free Firebox Black Porcelain Liners
2 x 5/32" Allen key
1 x GASKET-3 X 1/8 FLAT-5 FT
1 x 300i Airslide Cvr Kit-sal
1 x 3 Sided Surround, 41"x 33"
1 x Tree of Life Fireplace Screen w/ Mesh
1 x 3 GRATE HOLDER-CAST
1 x $ BOSTON 1200 FS CAST ASH DRAWER COVER-PD
1 x Millivolt - LP to NG
1 x TL/DVC BRASS ASHLIP TRIM
1 x Dmpr Shaft Bushing Plates
2 x 33 x 48 Black Trim (Includes black trim) No Switch
1 x # 49 burner orifice
1 x Porcelain Panels, Black
1 x Ceramic Liner Kit, Buff Herringbone
1 x 5 Pc Ball Handle - Round Base /Antique Brass/Black / Antique Bra
1 x EG31 EXTENSION KNOB (HI-LO)
1 x LOWER BAFFLE-SALE
1 x Tl300 Air Grill Face-brsh
2 x Conversion Kit Propane to Natural
1 x 1/2 Spring Handle-3 Pack
1 x 10-24 X 3/4 Inch Phillips Head Surround Retaining Screw (Each)
1 x Heating/Cooling thermostat - 120 volt
4 x Damper Clamp (Required in vented applications.)
1 x (891148) Handle – Pocket Pull For Hopper Lid 1
1 x 42" Mosaic Masonry™ Bi-Fold Door, Pewter Finish
2 x 5 Pc Tool Set - Large Leaf
1 x Tl2/2.6 Damper Frame Asy
1 x Black Candelabra
1 x Flue Opening Cover
1 x 69593 Igniter Tube Weldment 1
2 x Black 12oz Aerosol Spray
1 x Heat Shld Mntg Plate-2.0
1 x CAULK FOR GRATES
1 x 69190 Draft Blower Assembly 1
1 x Resolute Acclaim
1 x 3/4 Pipe Thread Maledrain
1 x 69837 DAMPER WELDMENT 1
1 x 1/8 Inch Fiberglas 2 X 4
1 x 12-7/16 X 17-5/8 GLASS
1 x Millivolt - NG to LP
1 x Side Shield-left-tl2.6
1 x Half Round Rug Mesa Tan / Khaki/Taupe
1 x BLOWER
1 x LEFT WING CVR-PNTD-SALES
1 x 5 pc Tool Set - Maple Leaf
1 x 3-20-09302 Blade-pk Of 3
1 x Ball Plunger - Bottom Louver (Each)
1 x 4 pc. Tool Set - Ball Handle - Rectangular Base - Antique Brass
1 x Conversion Kit, Electronic Ignition, Natural to Propane
1 x 33 x 41 Black Trim (Includes black trim) No Switch
1 x BRASS COMPRESS FITTNG
1 x 3 Sided Surround, 46"x 33"
1 x BRASS PLATED & BLACK 4 PC TOOL FIRESET
1 x Pellet - Coal Scuttle / PC - Black
1 x Hi-Temp Chimney Support (Use W/Chimney Hts In Excess of 30')
1 x 42" Mosaic Masonry™ Bi-Fold Door, Oiled Bronze Finish
1 x 1200 REAR SECONDARY AIR TUBE E
1 x 80381 110°F Snap Disc (Low Limit) 1
1 x Shldr Screw 3/8x3/8
1 x CABINET SIDE (RIGHT)
1 x 14ft Power Cord
1 x Tl Door Trim-brsh Ss
1 x Liner Kit Ceramic, Trad. Buff
1 x 1/4" X 1" Glass Screw (Each)
1 x Vigilant Non-cat
1 x Ul Fdr Snout Gasket-10 Pk
1 x 69680 Hopper Extension Box Assy. 1
1 x Cast Iron Skillet with Folding Handle / Matte Black
1 x STRAIGHT HOT WATER COIL
1 x Tl300 Shoe Brick Gasket
1 x Resolute Non-cat
1 x RIHT SIDE ASY-SALES
1 x 80232 SUPPLY CORD 1
1 x LARGE FLUSH INSERT ARCHED
1 x Tl300 Air Jacket-sales
1 x Conversion Kit, Electronic Ignition, Propane to Natural
1 x Hi-Temp Anchor Plate/Collar Assembly (for masonry fireplaces)
1 x Acc/adv/xxv Hprlid Hng-sa
1 x Intrepid Non-cat
1 x 80351 Receptacle, Snap-In 1
1 x Pf100 Inner Ash Door-sale
1 x 1/4-20x1-1/2wingscrw-10pk
1 x 69945 Weldment, Ash Pan 1
1 x PRESS SENSOR KIT-SALE
1 x BOSTON 1200 FS CAST FRONT-DB
1 x 5/8" I.D. AUGER BRASS BUSHINGS (SET OF 2) (POST JULY01/08)
2 x 30 Degree Offset and Return
1 x Diamond Curved Screen
1 x Façade, Sante Fe, Black
1 x 69505 Cabinet Support, Top/Right 1
1 x ANTIQUE BRASS PLATED 4PC TOOL FIRESET
1 x Tl2.0 Blower Blockoff Plt
1 x Green/Navy Canvas Log Carrier
2 x 12" Section Hi-Temp Double Wall Pipe Snap Lock
1 x BACK GRILL (TOP)
1 x 80462 Receptacle, 3 Prong 1
1 x Coal Hod / Pellet Bucket - Large / PC - Black
1 x Harness-press Ignition
1 x Ignition Control Bracket
1 x Conversion Kit, Electronic Ignition, Natural to Propane
1 x Façade, Contemporary, Black
1 x Video for Imperial Pellet Stove
1 x Gasket-1-1/2x7-16 Bulbpsa
1 x Frontier, Decorative Accent Trim, Aged Silver
1 x 24" Rich Oak Log Set, Concrete
1 x DUAL BULB DOOR GASKET (10FT)
1 x 3 Sided Flange, 30x37
1 x 69478MB Ash Pan 1
1 x FLEX HOSE
1 x 3 Sided Flange, 30x41
1 x Self Adh Grommet-10ft/kit
1 x ASH PAN-SALES
1 x Outdoor Window Kit (Light-Tinted Tempered Glass) With Outdoor Ba
1 x 3 Speed Toggle Switch
1 x Fatwood Caddy - European / PC - Graphite
1 x Hpr Switch Fdr Fitting-2
1 x NG to LP Conversion Kit- RDV-CD
1 x 36" Standard Bi-Fold Glass Door, Black
2 x 3-20-60906 Blade-3 Pack
2 x Highliner, Decorative Accent Trim, Aged Silver
1 x 36" Outdoor Bi-Fold Glass Door, Black Finish
1 x CORD-ELECTRIC 22 IN
1 x 3-Piece Trim Kit, Brass
1 x Heat Shield
1 x Traditional Spark Guard - 44" x 33"
1 x Architectural Stone
2 x Accin/xxv Hinge Plate
1 x NG CONVERSION PK
1 x SCREW-HWH TEKS 8 X 3/4
1 x Buff Brick Liner Kit 35
1 x 80442 80 CFM BLOWER 1
1 x Conversion Kit Propane to Natural
1 x 6mm Spring Washer-25 Pk
1 x Tl2.6 Cut Brick Set
1 x Half Round Rug True Blue / Navy/Biscotti
1 x 5.6" COMBUSTION IMPELLER
1 x Ceramic Stack Old Town Red
1 x 5 Pc Ball Handle - Square Base / Antique Brass/Black / Antique B
1 x Firestop Thimble (Use when penetrating a joist)
1 x Door Latch (Each)
1 x LID CATCH-SALES
1 x Coal Hod / Pellet Bucket - Small / Antique Copper Finish
1 x 6X4-1/2X1-1/4 BRICK-SALES
1 x 80488 DRIVE MOTOR (1.5 RPM CCW) 1
1 x DIFFERENTIAL SWITCH
1 x LATCH-LEFT-SALES
1 x 1200/1700 FPI INSERT FLUE COLLAR ASSEMBLY
1 x Encore
1 x Shield-upr Top Heat-sale
1 x Tl2.6 Flue Collar Weldmnt
1 x Tl3/win Andiron-1 Sets
1 x Tl300 Ashlip Trim-brush S
1 x 69660 ASSY., DOOR_ LARGE RECT. 1
1 x 3 Sided Flange, 34x41
1 x BURN POT SCRAPER TOOL
1 x SENSOR/A350 CONTROL
1 x 5in Single Paddle Blade
1 x Gold Plated Knob
1 x Brushed Steel Basket
1 x Nut-10-24 Acorn Nut
2 x 38/45/61/68 Gold Ash Lip
1 x Tl300 Grate-sales
1 x BLANK EXTENSION KNOB
1 x Firedome2 Gasket Set
1 x Video for "Evolution Pellet" Models
1 x Safety Relief Valve
1 x Candelabra - Spandrels / PC - Graphite
1 x EG31 CAST SURROUND MOUNTING BRACKETS AND HDW
1 x 26733 BASE PLATE 1
2 x 40585 Large Viewing Glass Door 1
1 x ORIFICE-NG-MALE-#39
1 x 4 pc. Tool Set - Ball Handle - Round Base - Black
1 x Round Magnet-set Of 4
1 x 36" Section Hi-Temp Double Wall Pipe Snap Lock
1 x 60 Degree Offset and Return (for Rapture only)
1 x BLOWER
1 x Ul Pellet Air Intake-sale
1 x AUGER STOPS (CLEAR RUBBER)
1 x Pellet Scuttle / PC - Black
1 x red propane label
1 x 69767 ASH PAN WELDMENT 1
1 x Air Pump Rebuild Kit
1 x TERM TRIM COLLAR-SALES
1 x Spark Guard Screen - 44"W x 33"H
1 x Screwposts/washers-set 20
1 x HPR HINGE SEAL-SALES
1 x Oak/tl3 Shoe-ramp Brick
1 x Creosote Conditioner
1 x 68880 Ash Door Assy. (w/Rope Gasket) 1
1 x Leg Leveling Kit
1 x Pf100 Circuit Board-sales
1 x Warm Red Full Herringbone
1 x BOSTON 1200 FS CAST SIDE RIGHT-PD
1 x 4" EXHAUST - STARTER TUBE GASKET
1 x CAST DOOR-SALES
1 x STANDARD WING-BLK 41WX28H
1 x Summer Screen for Votives
1 x 105 Relief Damper Gasket
1 x 6.0 lb. Bag Smooth Glass Pebbles, Blue
1 x TOP WING CVR-PNTD-SALES
1 x Burn Pot Cleanout-sales
1 x Brick Clip (Each)
1 x BOSTON 1200 FS ASH PAN
1 x Junction Box Kit (Required with Blower)
1 x AIR PUMP
1 x GASKET PLATE ASY-TLC
1 x BURNER CONTROL ASSEMBLY NG
1 x SILICONE SPONGE W/PSA-BIN
1 x 1/16 SILICONE FOAM W/PSA
1 x 1200/1700 LEFT SHIELD ASSEMBLY
1 x 370 VAC MOTOR RUN CAPACTR
1 x PENDLETON STOVE 1994-2012
1 x FRONT LOG
1 x Length 1ft.
1 x 9-1/2 X 13-5/16 Glass
1 x ORIFICE-NG-LP-MALE-#56
1 x Ring Terminal-25/pk
1 x Elbow 45-Degree, 8" I.D.
1 x DAMPER ARM-SALES
1 x Black Candelabra
1 x Traditional Andiron Kit
1 x Differential Switch
1 x SWITCH SHIELD-SALES
1 x TL2.6 TOP VENT COVER
1 x Warm Red Split Herringbone
1 x Auger Bushing – Top & Bottom, Brass (No Threads) 2
1 x ASH DOOR LATCH HDWR
1 x 26734 Surround, Top 1
1 x CERAMIC LOGSET FOR PELLET
1 x Tl300 Airslide Rod Brkt-s
1 x Maple Leaf Tool Set
1 x Adv-04/xxv Push Arm-sales
1 x GAS STOVE START CLLR GSKT
1 x AIR FILTERS-14X20X1-12PK
1 x DOUBLE PILOT ORIFICE NG
1 x Spring Latches W/hdwr (2)
1 x Conversion Kit, Electronic Ignition, Natural to Propane
1 x Door - P23, Gold 1
1 x (891121) Air Switch Tube (Per Foot) 1
1 x Oak Damper Handle-sales
1 x Ash Bucket / PC - Black
1 x Bulk25-ssscp 3/8-16 X 1/4
1 x BLACK CLASSIC DOORKIT
1 x Screw 1/4-20x1-1/2 Pkg-25
2 x Tl3/sms Load Door-sales
1 x 2" Clearance Firestop Spacer (24 ea.)
1 x Hitemp Wire 18awg-12 Ft
1 x Door - P23, P1000PWA, Painted (PWA) 1
1 x 69870 Window Cover 2
1 x 36" Mosaic Masonry™ Bi-Fold Door, Oiled Bronze Finish
1 x 4-3/4 Single Paddle Blade
1 x Combustion Blower Transition – Aluminum 1
1 x 4 pc. Tool Set - Ball Handle - Square Base - Black - 29.5"H
1 x 33 ELITE FLUSH INSERT
1 x Fatwood Caddy Refill - 15 Lb Box / Wood
1 x Air Duct Insulation Sleeve 6" X 24"
1 x Ceramic Stack Black Tie
1 x 42" Bi-Fold Door, Platinum
1 x SCREW-HCS1/4-20X1-1/4 GR5
1 x Outside Air Kit With Duct
1 x 80495 120 CFM BLOWER ASSEMBLY 1
1 x Tl3 Top Load-pntd-sales
1 x AUGER MOTOR 115V (1 RPM)
1 x Tl300 Grill Face-sales
1 x Double Pilot Orif Lp
1 x P61/p61a Burn Pot-sales
1 x 1/4" NTP FEMALE 3/8 COMP. 90 DEG. ELBOW
1 x FDR SNOUT-SALES
1 x 68/35 Door Trim-brush Ss
1 x Conversion Kit, Millivolt, Propane to Natural
1 x Grommet 7/16 Id X 3/4 Od
1 x Door Handle, Spring – Chrome 1
1 x 42" Perimeter Trim - Black
1 x VALVE DOOR ASY-SALES
2 x Ddm Replacement Cable Kit
1 x Country Classic Tool Set
1 x 80090 Rheostat W/Knob 1
1 x Screw 1/4-20 X 3/8 Pkg-50
1 x 69497 Louver Assembly 1
1 x 36" Drain Pan w/ 1" Stainless Decorative Face Ext.
1 x Seal Plate-center Oakl
1 x Outdoor Bi-Fold Door with Frame and Hoods, Brushed Stainless
1 x Tl3 Rght Side-paint-sales
1 x 42" Outdoor Bi-Fold Glass Door, Brushed Brass Finish
1 x TL2.0 AIR GRILL OPTION
1 x 69668 WELDMENT, SHROUD (892068) 1
1 x 1/4" SPRING PIN
1 x 18" Section Hi-Temp Double Wall Pipe Snap Lock
1 x ASH PAN-SALES
1 x Ivory Full Stacked
1 x Conversion Kit, Millivolt, Natural to Propane
1 x 80491 Micro Switch 1
1 x Ceramic Magnet - Side Doors (Each)
1 x 40292A 6" FLUE COLLAR 1
1 x Gold Cleaner
1 x 1200/1700 RIGHT SHIELD ASSEMBLY
1 x Acc/xxv Distribution Blwr
1 x Motor-furnace Blower
1 x Millivolt, Propane to Natural
1 x WASHER-1/4 CONTACT-10 PK
1 x SWITCH MOUNT-SALES
1 x Black Reflective Porcelain Liner
1 x 26" Perimeter Trim Kit, Platinum
1 x Manual Fan, Variable Speed
1 x Air Deflector
1 x 42" Fixed Door, Black
1 x Sage w/ Ivory Trim Canvas Log Carrier
1 x HARNESS W/VSC/KNB
1 x 69706 Left Side Hopper Extension Assy. 1
1 x NG CONV KIT-SALES
1 x 30" Rich Oak Log Set, Concrete
1 x Louver, Brushed Nickel (For Cast Iron Top Only
1 x 306w/120v Ignitor 15 Fin
1 x 4 pc. Tool Set - Ball & Loop Design
1 x 1" Clearance Firestop Spacer ( 24ea.)
1 x Auger Motor (use part #80642) 1
1 x Black Candelabra
1 x Roof Support (Use with flashing)
$263,738.35
Shipping Charges
Share Product
Share via E-Mail Share on Facebook Share on Twitter Share on Google Buzz Share on Digg