$0.00

Novasit Thermocouple 33.5 Inch Long Lead
[910-588]

Novasit Thermocouple 33.5 Inch Long Lead
Novasit Thermocouple 33.5 Inch Long Lead
Call Us on 860-774-6100 if you require this part. Reviews
Manufacturers
Live Help

Available 9am-4pm
Search
 
Use keywords to find the product you are looking for.
Advanced Search
1 x STRAIGHT HOT WATER COIL
1 x Rp199 Replacement Damper
1 x Glass Media, 5LB Bag, Platinum
1 x Wall Mount On/Off Switch Kit
1 x Proof of Fire Switch
1 x Replacement Glass (9 1/8" X 15 5/8")
1 x Glass Fuse for Digital Board (5 Amp) (5 pack)
1 x Hinge Block (PWA/PCA & PCNA) 2
1 x Connector 3/8" Compression X 3/8" Male (Valve
1 x Double Door Catch
1 x Black 2.2 qt Enamel Steamer - Lattice Top
1 x Dexen Service Kit
2 x 7/8" Door Gasket Repair Kit
1 x Combustion fan (must order gasket)
1 x Door Latch (Each)
2 x Touch up paint powder coat exterior
1 x Auger Motor
1 x Mbc36a Bk Brick
1 x TOP BRNR LP VALVE
1 x Power Cord
1 x Wall mounted LCD manual and Thermostat Modes
2 x Touch up paint firebox interior
1 x Firebox Baffle/Restrictor Assembly
1 x Control Board Overlay for 80P30523-R
1 x Door Left Cast - Timberline Brown
1 x 6 VENTURI HOUSING
2 x Novasit Pilot Assembly - LP
1 x 38 X 4 Ul Fdr Pusharm-sal
1 x BRICK RETAINER (2) w/SCW#   UNIVERSAL PART
1 x BURNER ASSY, REAR#   VARIOUS MODELS
1 x 45/61/68 Snout-sales
1 x Auger Bushing Washer
2 x # 42 burner orifice
1 x Log Tray - Rear
1 x 17 WIRE SWITCH
2 x Novasit Electrode - Short
2 x Transflo Blower - Motor Only
1 x AIR DEFLECTR, BRNR(FRT-33/CYP)   SERVICE PART
1 x Novasit Pilot Hood 3 Way 00/01/02/03/04
1 x Derated Burner Orifice #52 - LP 99/00/01/02/03/04
1 x 8 PILOT HOOD
1 x Motor Mount Bracket Assembly
1 x Fan Speed Control (Rheostat) 99/00/01/02/03/04
1 x AUGER FLIGHT SPACER, 5PK#   CHECK SR#
1 x Electronic Natural to Propane (Honeywell)
1 x Explosion Door Handle
1 x Bottom Black Louver Hinge (Each)
1 x BURNER ASS'Y, DF - REAR#   GSR-GSR2
1 x 4 VENTURI COVER ASSEMBLY
1 x Air Pump Rebuild Kit
1 x BLOWER, CYPRESS/GRNFLD#   BLOWER ONLY, NO HARDWARE
2 x Variable Speed with Wall Switch
1 x DIFFUSER UNIVERSAL   18 GA ALZ - 3.639 x 3.232
1 x Touch Up Paint - Timberline Brown
1 x Decorative Volcanic Stone
6 x 5/32" Allen key
1 x 11 THERMOPILE
1 x Cast Faceplate Hardware Package
1 x 5 PIEZO IGNITOR
1 x Novasit Pilot Orifice - LP
1 x Log Set - Complete ( No Embers, Lava Or Vermiculite) See Line
1 x Coal Rake Rod Weldment
1 x Cast Faceplate Mounting Bracket Right
1 x Pc45 Wiring Harness
2 x Novasit Regulator - LP
1 x AUGER BUSHING/PUSH#   INCLUDES BRACKET - VARIOUS MODELS
1 x LATCH PLATE-SALES
1 x CERAMIC BRICK RETAINERS   w/SCREWS - SET OF 2
1 x BLOWER, RT, GAS INS - 2005+ #   EF-II/DVS/DVL/31/33
1 x AUGER BEARING, SML SET-SCREW #   1990-92 PS & PI
1 x Smoke Pipe Damper 3" *Net / Net
5 x Novasit Pilot orifice
1 x GLASS CLIP (4), AVA #   VARIOUS MODELS WD/GS/PEL
1 x COVER, REAR VENT - BRONZE   CYPRESS
1 x 18 EMBERS, GLOWING
1 x BRKT,CMPLT KIT , DVS BK PLT   BK PLT-DVS/EF/GS/31
1 x DOOR, HINGE PINS, BLACK#   2-PK, FS/INS
1 x CONV PARTS, NG - SIT#   ALL/BERK/CDR/PRA/TOL/DVSZC-INS
1 x Smoke Pipe Damper 6" *Net / Net
1 x Brass Plated - 21" L
1 x VALVE BRACKET (X2)
1 x BURNER ASS'Y, DF - REAR#   GSR-GSR2
1 x Vacuum Switch Bracket
1 x IGNITOR, PIEZO
1 x BURNER RETROFIT - EF, v.1#   BRK T0 857740 / PRA TO 801307
1 x CNTRL MODULE, 36CF/1080CF#   VER.1- non-ALPHA MODULE
1 x 19 CHARCOAL LUMPS
1 x BLOWER ASS'Y, RIGHT - 864HO#   SERVICE PART
1 x Rear Bushing Bracket
1 x CNTRL/ACCESS DR ASS'Y,INSERTS   31/33DVi, DVS/DVL GS-GS2
1 x BATTERY TRAY, GS - "AA"   SERVICE PART
1 x AIR CONTROL SHUTTER, REAR   CYP,GRNFLD,864HO, 33DVi,DVLGSR
1 x GLASS, AVALON SMALL#   5mm NEOCERAM - 10.125 x 17.094
1 x AIR CONTROL S-ASS'Y, SMALL PS
1 x 7 TOP FINISHING TRIM
1 x VENTURI GASKET
1 x AUGER BUSHING PLATE, UPPER #   1997 & UP PS/PI, LRG OR SML
1 x AIR DEFLECTOR, NG - 864 HO EF   EMBERFYRE BURNER - NG
1 x BURNER RETROFIT, EF, CAST,v.2#   BERKSHIRE / PRAIRIE
1 x CONV PARTS, LP - SIT #   ALL/BERK/CDR/PRA/TOL/DVSZC-INS
1 x CNTRL MODULE, BASIC FUNCTION#   GSB2 MODELS
1 x BRKT, FACE CONNECTOR L/R - SET   DVLEF-II/DVLGS/33DVi
1 x BRKT SET, ANDIRON   864HO - FRNT/BACK
1 x Ducks Fireback
1 x CONVECTION DUCT, DVS (GS)   SERVICE PARTS
1 x BLOWER, CONV - 21DV TV#   21DV-EF/HIDEAWAY
1 x AUGER BUSHING PLT, LWR, LRG#   YANK/AST - PS & PI 2000+
1 x BRICK RETAINER (2) w/SCW#   UNIVERSAL PART
1 x AIR DEFLECTOR S-ASS'Y, CYPRESS   USED W/ STANDARD LOGSET - LS44
1 x Antique Brass Plated - 21" L
1 x BURNER ASSY, DANCING FYRE#   33 DVi/CYPRESS/DVL GSR/GSR2
1 x 17 LOG LOCATING PIN (X4)
1 x BURNER ASSY, REAR#   VARIOUS MODELS
1 x Piezo Igniter
1 x DOOR HANDLE ASS'Y, '84 DBL DR#   NON-CAM SIDE
1 x Robertshaw Regulator - LP
1 x Pressure Relief Bolts 3 1/2 Inches Long
1 x Resolute Non-cat
1 x GSKT, GLASS 3/4" WIDE x 70"#   LOPI WOOD, PELLET & GAS
1 x AIR CONTROL ASSY, REVERE/X-NT
1 x Bumper Rubber
1 x BRICK-CUT, 9 x 4-1/2 x 2-11/32   ANGLE CUT BRICK
1 x Duplex Receptacle - White
1 x KNOB (PLASTIC), RHEOSTATS #   BLACK w/WHITE LINE - GAS/WOOD
1 x Log Set - Complete *
1 x Control board harness restraint
1 x BRKT, FACE MNTNG - L/R#   DVS/31
1 x CNTRL MODULE, REMOTE FUNCTN#   GSR2 MODELS
2 x SLAB BASE T-NUT-40 PACK
1 x BURNER ASS'Y, EF - 864HO#   EMBERFYRE - NG - GS MDLS
2 x Robertshaw Regulator - NG
1 x GSKT, DOOR 7/8" x 50' BLACK#   ROPE - MISC. GAS/WOOD/PELLET
1 x Jardin 44" x 22" Half Rnd / Cocoa
1 x Anti-Draft Shield for Round Top Only
1 x AIRTUBE PINS & SCREWS - 4 PK#   VARIOUS AIRTUBE KITS
1 x 26" Perimeter Trim Kit, Black
1 x GLASS, LPI SMALL, DOUBLE#   DOORS 81-86, 6.750" x 8.750"
1 x Radiation Shield, 8" I.D.
1 x European Copper Term. Adaptor Kit - 8"
2 x Rev F Of 3-20-00744 Probe
1 x Elbow 45-Degree, 8" I.D.
1 x Glass U Clip - Flush Window (Each)
1 x BLOWER ACCESS PANEL   DVS GSR2/31 DVI GSB2
1 x AIRTUBE, ROLL PINS, PK OF 6#   1/4" dia. x 5/8"PLAIN STEEL
1 x Burner Orifice #32 - NG 99/00/01/02/03/04
1 x 10 BURNER ORIFICE NG #45
1 x CERAMIC FIBER BLANKET   ANSWER II 2020
1 x COVER PLATE, EVERGREEN   AIR CONTROL
1 x GSKT, GLASS 3/4"x50ft. 301-B#   ASHESIVE BACK, GLS GSKT
1 x ACCESS DOOR, 31/33 DVI   GSB/GSR
1 x Wall Switch Kit, On/Off, White
1 x FAN, FRONT MOUNT INS WOOD II*   ANSWER/REVERE/1250/1750
1 x DOOR, HINGE PINS, BLACK#   2-PK, FS/INS
1 x Andiron Kit, Mission
1 x BLOWER BRKT ASS'Y, LEFT   BERK/PRA/CDR/ALEG/TOL
1 x Paw Bolt 3/8 X 1-9/16mod-
1 x DOOR, HINGE PINS, BLACK#   2-PK, FS/INS
2 x Ul Fdr Snout Gasket-10 Pk
1 x Barb fitting
1 x 3-n-1 DOOR SHL HW SM/LG   HARDWARE ONLY
1 x BLOWER ASS'Y, RIGHT - 864HO#   SERVICE PART
1 x BRICK-CUT, 8-1/4 x 4-1/2 #
1 x AUGER TUBE, REPLACEABLE   DEERFIELD/FOXFIRE
1 x BRICK-CUT, 5-1/2 x 4
1 x CONV PARTS, NG - RS   93-95 BV/DVSZC-INSRT 96-00
1 x ASHPAN, EVERGREEN   PEDESTAL MODEL
1 x Elbow 90-Degree, 8" I.D.
1 x 17 BATTERY, AAA 1.5V
1 x Quick Connect Pipe Adapter
1 x 10 DOUBLE BULKHEAD GASKET
1 x FACE GRILL, CAPE COD INS   NO HW / FLUSH WD
1 x BRICK-CUT, 6-3/8 x 4-1/2#
1 x # 33 burner orifice
1 x BATTERY TRAY, GS - "AA"   SERVICE PART
1 x Tool Assembly
1 x LEFT SIDE ASY-SALES
1 x Bracket, Brick Front Ser
1 x Decorative Rivet - Polished Gold (Each)
1 x Dvg/bvg Lp Conv Kit-sales
1 x 50 piece Bulk Outside Air Kit - Collar Only Kit
1 x DOOR, COMPLETE - LRG BLK LOPI - 3n1#   GLASS, RETAINER & BLK HAN
2 x Form Louver Door Bdv600
1 x 2 : SCREEN PANEL
1 x 3/8x1/2 Silicone Psa-20ft
1 x Relay
1 x Feeder Kit -2
1 x BLOWER ASS'Y, LEFT - FW#   FW/FWP/LFW INSERTS
1 x N/S : TOP BRICK RETAINER
1 x On/Off Switch Assembly Complete
1 x Ash Door Knob, Full Pedestal Ash Pan Models (except Pepin)
1 x 4DT-TL38 TELESCOPIC LENGTH
2 x Power Cord - 120 Volt
2 x Spark Generator Battery Holder
1 x Conversion Kit, Millivolt, Propane to Natural
1 x Accin Airjacket Insulator
1 x KNOB PHNLIC, ASHPAN W/SCRW   PELLET & WD AIR CONTROL
1 x 4VP-TS TEE W/TEE CAP
2 x D-shape Knob/shaft-25 Set
1 x Hanger Rod 42 For Servic
1 x # 34 burner orifice
2 x Self Adh Grommet-10ft/kit
1 x ASHLIP TRIM, SET SCREWS - 10pk#
1 x Glass Media, 5LB Bag, Reflective Blue
1 x BRICK-CUT, 9 x 2-7/8" #
1 x Novasit regulator
1 x Ul Short Slide Plate-sale
1 x 1 : BRICK FILLER (4 PER F/P)
1 x DOOR, HINGE PINS, BLACK#   2-PK, FS/INS
1 x Compact Termination SV4.5 20" w shield
1 x 8a : REGULATOR LP - MANUAL
1 x Auger Motor
1 x Auger Bushing Washer
1 x 8 : CABLE CLIPS (TWO PER FIREPLACE)
1 x 13 : TAVERN BROWN FIRE BRICK LEFT
1 x Snap Disk Bracket Form
2 x BRICK, SET OF 8, FULL SIZE*
1 x Pressure Relief Plate Bottom Gasket
1 x Handle Mount Plate
1 x Door Mounting Bracket Antique Gold Right - Double Door
1 x Elan PS 1990
1 x GLASS RETAINER ASSY, 3n1 LRG#   w/ GLASS, GASKET & CLIPS
1 x SNAP-DISC - 120deg NO#   WOODSTOVE & INSERT
1 x BRICK-CUT w/ HOLE 9x4-1/2x6   GRNST IGN BRICK, INSERT
1 x 19 : KNOB EXTENSION HI/LO
2 x N/S : PIEZO WIRE
1 x BUSHING (DOOR/HANDLE)   7/8" LONG x 1/2" dia
1 x Black Candelabra
1 x AIRTUBE PINS & SCREWS - 4 PK#   VARIOUS AIRTUBE KITS
1 x 4DT-VPSS VP TERM SPARK SCREEN
1 x DOOR, HINGE PINS, BLACK#   2-PK, FS/INS
1 x 3" / 4" VP PELLET INSERT 35' FLEX KIT
1 x BRICK, SET OF 8, FULL SIZE*
1 x BRICK-WHOLE,9 x 4-1/2 x 1-1/4#   STANDARD FIREBRICK
1 x BAFFLE INSULATION, HYBRID#   LFW INSERT
1 x Pressure Relief Plate Bottom Firebox
1 x Burn Pot/tailpipe Gaskets
1 x Thermocouple-use W/s.i.t.
1 x 4X3 TEE W/TEE CAP
1 x BAF SUPRT, REAR "Y" #   RAI/945/990/ COTTAGE/ MISSION
1 x Millivolt - LP to NG
1 x AIR CNTRL, EXTN ROD - UNIV#   4" X 3/8" FWI & FWP
1 x 47" Poker - Aerator / Solid Brass
1 x Top Relief Plate 99/00/01/02/03/04
1 x Standard Single Speed
1 x (891121) Air Switch Tube (Per Foot) 1
1 x 36" Drain Pan w/ 1" Stainless Decorative Face Ext.
1 x 22 : WIRE HARNESS FEMALE-MILLIVOLT CONTROL
1 x BAFFLE, CENTER PLATE, COTTAGE   2000
1 x FILTER BOX-FURNACE
1 x GSKT, ROPE, DR 7/8" x 64" BLACK#   VARIOUS WOOD/PEL/GAS
1 x BRICK-CUT w/ HOLE 9x4-1/2x6   GRNST IGN BRICK, INSERT
1 x Firestop Thimble Kit
1 x BLOWER ASSY LT - 864/564#   FAN KITS 99000156/99000162
1 x Junction Box Kit (Required with Blower)
1 x BAFFLE REAR FLUSH WOOD#   24.825 x 12.846 -12 GA SS 304
1 x ASH GUARD, LFW INSERT#   LARGE FLUSH WOOD
1 x BRICK-CUT, 9 x 1-3/8#
1 x 7 : REAR INJECTOR LP 50
1 x 17 : KNOB EXT HI/LO
1 x AIRTUBE, ROLL PINS, PK OF 6#   1/4" dia. x 5/8"PLAIN STEEL
1 x Ul Short Fd Cvr&gskt-2set
1 x 1 : PIEZO IGNITOR
1 x RESTRICTOR PLATE-SALES
1 x REAR LOG
1 x GLASS, LPI LARGE, DOUBLE#   5mm NEOCERAM - 8.625x9.718
1 x BAF SUPRT, REAR "T" BAR#   w/DEFLECTOR LIB/OLY/FREEBY
1 x 12B : R/S (ON/OFF SWITCH)
1 x PANEL, FL WD LG 1PC 35 x 47*
1 x SET OF CUT BRICK FOR 3500
1 x 5L : LEFT TOP LOG
1 x HW PACK, FACE, ARC GLD, 44/36#   w/ (12) SCREWS
1 x SF3500 BLOWER BRACKET-SAL
1 x 10 : SCREW NO.6X3/4 PPH YELLOW ZINC
1 x Camarque Fireback
1 x FASTENER - SCW BLK 6 PK#   WD DR HNDL, 1-1/4"x1/4-20
1 x FEEDER GEARMOTOR-2RPM
1 x Flush Door Frame Only
1 x 42" Standard Bi-Fold Glass Door, Brushed Brass finish
1 x HEAT EXCHANGER ROD
1 x Piezo (ignitor) With Nut
1 x 4000w Tadpole Gskt-10 Ft
1 x Arch Style - Black
1 x GSKT, GLASS, 75" - FWP/LFW#   GSKT ROPE, 1/4" dia, BLACK
1 x OLYMPIC STOVE
1 x STARTER TUBE 3" X 2.5" X 15 DEGREE (POST JUNE 05)
1 x CONV PARTS, NG 864 HO EF   GSR2 SCREEN MODEL
1 x Bulk-1/4-20x5/8 Wingscrw
1 x DAMPER BLOCK OFF COVER (1)   w/ FASTENERS
1 x DOOR GASKET 3/4" FIRM ROUND X 80"(7FT)
1 x BRICK-CUT, 8 x 4
1 x 1" KNOB
1 x HOPPER AND LID-SALE
1 x CONV KIT FROM NG TO LP SIENNA FOCUS / DV36 CAPE COD DOOR HINGE
1 x GLASS CLIP SET, RECT(FWP)#   SET OF 4 GLS CLIPS
1 x 1200/1700 LEFT SHIELD ASSEMBLY
1 x BRICK-CUT, 9 x 2-7/8" #
1 x BRICK-CUT, ANGLE CUT   6-7/8x2-13/16x27.37 deg1@3-3/8
1 x BRICK-CUT, 9 x 4
1 x Distribution Blower-fasco
1 x SCREW-HCS5/16-18 X 1-1/4
1 x Flue Adaptor Insulation
1 x 700 1987
1 x Flush Door Bottom Mounting Bracket
1 x Embers - Bag
1 x GLASS C/W GASKET (28.5" x 18")
1 x CONTROL PANEL, DVS/DVL INSERT,   DVL ZC ('03)
1 x FASTENER - SCW 6 PK   THREAD CUTTING - 10-24 x 1/2"
1 x SILICONE HOSE (ALL PELLET)(RED)
1 x 42" Perimeter Trim - Platinum
1 x Compact Termination SV4.5
1 x Bulk100-#10 Ext Lock Wshr
1 x E33 - LOG BURNER CONVERSION KIT - LP TO NG
1 x FLUSH HANDLE FOR HOPPER LID AND BBQ CART DOOR(S)
1 x Flame Guide-38p/p61/100
1 x 1196 1990-1993
1 x BRASS MALE COMP FITTING
1 x Bio-120 Bp Asy-sales
1 x EXHAUST STARTER TUBE GASKET
1 x Fan Thermodisc Cover Plate
1 x Arrow Bp Scraper-10 Set
1 x PANEL TRIM HW, "L" BRKTS #   FLUSH WD/FWP & ALL GAS INSERTS
1 x SPARK ELECTRODE W/IGNITOR CABLE (POST 10/00)
1 x Flush Door Frame Assembly - C\W Glass
1 x Fan Access Cover
1 x AIR CONTROL ASSY, LIB/FRE/FRB#
$30,398.13
Shipping Charges
Share Product
Share via E-Mail Share on Facebook Share on Twitter Share on Google Buzz Share on Digg