$355.50

BYPS ASSY/CAT HLDR 36"A 92-94'   EXPECT LONG LEAD TIME
[91001615]

BYPS ASSY/CAT HLDR 36\"A 92-94\'   EXPECT LONG LEAD TIME
BYPS ASSY/CAT HLDR 36"A 92-94'   EXPECT LONG LEAD TIME

Please allow upto 2 weeks for delivery.

Reviews
Manufacturers
Live Help

Available 9am-4pm
Search
 
Use keywords to find the product you are looking for.
Advanced Search
1 x ASH PAN-SALES
1 x CAST DOOR-SALES
1 x Damper Clamp (Required in vented applications.)
3 x Glass Media, 5LB Bag, Reflective Blue
1 x Log Scraps, Floor Media Kit
1 x Arch, Nickel
2 x 3 POSITION ROCKER SWITCH
2 x Hopper Throat Gasket
1 x 440T 1983
2 x 38 X 4 Ul Fdr Pusharm-sal
1 x Quick Disconnect Pipe Connector 4"
1 x ANSWER PREMIER 1986-1987
1 x Decorative Log Set, Pellet Md.
1 x Heat Shield
4 x Decorative Volcanic Stone
2 x Flue Collar Heat Shield Vertical - Large
1 x BLOWER
1 x 100/105 Flame Guide Insul
2 x Bulk50-hcs 5mm X 8mm Z
1 x 100/105 Hprlid Catch-sale
1 x Thermostatic Fan DV and VF units only
1 x FRONT LOG
1 x 440 1984
8 x Touch up paint powder coat exterior
1 x MISSION
2 x Hf60 Long Bottom Gasket
1 x Large Shell Fireback / Cast Iron - Black
2 x Telescopic Length, 8" I.D. (15" to 26")
1 x Black - 21" L
1 x Small Shell Fireback / Cast Iron - Black
1 x TI 2201
1 x Hearth Cricket - Polished
3 x Air Pump Filter & Fitting
2 x Length 2ft.
1 x 105 ASH CHMBR INSUL-BACK
2 x ELEV BOLT3/8-16X1-1/2-BIN
1 x 26734 Surround, Top 1
1 x 9mm X 13mm Tubing-5ft/kit
1 x Pellet Stove Brush
1 x 26731 MAIN WRAP 1
1 x HB38 DUAL BURNER REMOTE
1 x 440/M440 1982
1 x Fox Fireback / Cast Iron - Black
1 x Small Pineapple Fireback / Cast Iron - Black
1 x 105 ASH CHMBR INSUL-RIGHT
1 x BRASS MALE COMP FITTING
1 x Bulk15-hcs 5/16-18 X 3 G8
6 x Variable Speed with Wall Switch
1 x Gin/dvgin Xl Cord Harness
1 x HB38 BACK LOG
1 x Arch, Brushed Nickel
1 x 40312 Grate Retainer 2
2 x Hf60 Comb Section Gasket
1 x 26735 Surround, Left 1
1 x 380-96
1 x 3/8x1/2 Silicone Psa-20ft
1 x Conversion Kit, Electronic Ignition, Propane to Natural
1 x 105 Ash Chmbr Insul-left
4 x Damper Steel Hndl/scr-bni
1 x GIN RGT WING BRKT-SALES
1 x Gas Lp Pilot Complete-pse
1 x 35” Façade Panel – Stainless
1 x CAST DOOR-SALES
1 x Bouquet Fireback / Cast Iron - Black
1 x CHANGEOVER/PROPANE
1 x SCREW-HCS1/4-20X1-1/4 GR5
1 x 40292A 6" FLUE COLLAR 1
2 x Outside Air Kit Collar, Hood & 3' Flex for Floor Venting
2 x Gas Ng Pilot Complete-pse
1 x Tl/dvc/win Paw Bolt-modif
1 x Montecito Estate CAT Door Hammered Steel
1 x NG to LP Gas Conversion Kit
2 x EXT RETAINING RING-BIN
2 x 3/4IN SQUARE PLUG BIN
1 x Brass Plated & Black - 21\" L
2 x Hf60 Ul Fdr Asy-sales
1 x Hopewell Fireback / Cast Iron - Black
2 x Flex 5" I.D. X 15' long
2 x 1/8 Silicone Tubing-5 Ft
1 x Montecito Estate CAT Door Black
1 x HB38 30IN SCROLL DOOR
1 x Dual Arch Screen Kit
1 x 105 MNTNG PLATE ASY-SALES
1 x 6 Rpm Motor Cw
1 x 40314 Shaker Grate Section 5
1 x Bulk100-fhn 1/4-20 Z 5
2 x Hf60 Water Jacket-sales
1 x 380/M380 - 1982
2 x Elbow 90-Degree, 8" I.D.
1 x Large Pineapple Fireback / Cast Iron - Black
1 x 26736 Surround, Right 1
1 x 520 1986
1 x 42" Perimeter Trim - Platinum
1 x ANSWER 1984-1987
3 x Glass Media, 5LB Bag, Platinum
2 x Hf60 Short Bottom Gasket
1 x 3 Position Terminal Block
1 x Receiver and Touch Screen Remote Control Kit
1 x 380/440 1985
1 x Front Burner Tube W/ext
1 x GASKET-HBF SILICA EXPLSN
1 x EPI 1101
2 x Low Profile Dual Blower II
1 x Decorative Ash Bed / Control Cover Kit
1 x Stainless on Bronze Tinted Glass
1 x 26413 Surround, Right 1
1 x 26732 CENTER SUPPORT 1
1 x Gas Appliance Installation Kit
1 x Manual Fan, Variable Speed
1 x Cape Cod Flush Wood Plus
1 x 100/105 Air Pump Bkt-sale
1 x Antique Brass Plated - 21" L
1 x 380/440 1986
1 x ANSWER (NT)
1 x 26733 BASE PLATE 1
1 x SET OF CUT BRICK
3 x Glass Media, 5LB Bag, Goldfinger
1 x Answer stove
1 x 40569 Door, Rectangular-Large 1
1 x 40515 Handle 1
1 x Comb Motor Cvr-sales
2 x Glass Media, 5LB Bag, Copper
1 x 4" Air Kit with Collar, Hood & 3' Flex
1 x 36" Outdoor Bi-Fold Glass Door, Platinum Finish
1 x Flex Compact Term w 36" compressed vent
2 x ROPED DOOR-PNTD-SALES
1 x Ul Pellet Air Intake-sale
1 x 7" Sunburst - Cast Iron Trivet / Enamel Black
1 x Hf60 Outer Skin Rght-sale
1 x Hf60 Hpr Brkt Left-sales
2 x Conversion Kit, Electronic Ignition, Propane to Natural
1 x 3 GRATE HOLDER-CAST
2 x Hpr Switch Fdr Fitting-2
1 x AUTO DRAFT CONTROL-SALES
1 x Firebox Canopy, Powder Coat
1 x Hf60 Foam Insulation Frnt
3 x HANDLE ASY
5 x Standard Single Speed
1 x Gas Conversion Kit Electronic Ignition - NG to LP
3 x SHKR HANDLE-PNTD-SALES
2 x Flex Compact Term w 48" compressed vent
2 x SET OF CUT BRICK
1 x SINGLE GLASS FRAME-SALES
2 x SHAKER BLOCK-SALES
1 x COIL HOLE-SALES
2 x High Alt Intake Reduction
1 x Traditional Andiron Kit
2 x Draft Meter Assembly-sale
2 x Bearing Retainer W/hdwr
1 x 4 Output Circ Brd-sales
3 x SHAKER BAR-SALES
1 x Hf60 Feeder Shield-sales
2 x Auger Motor (use part #80642) 1
1 x 3/16 Rubber Spacer-10pack
1 x Tea Pot Trivet - Blue
1 x Herringbone Rust
1 x Hf60 Fb Refractory Btm
2 x Ash Cleanout Door 1
3 x SHAKER SHAFT
1 x Rooster Trivet - Blue
1 x 42" Mosaic Masonry™ Bi-Fold Door, Pewter Finish
2 x Flex Compact Term w 18" compressed vent
1 x Safety Relief Valve
1 x Hf6 Firebx Cvr Retnr-sale
1 x Fatwood Caddy - Pointsetta - New! / Black w/ Various
1 x Novasit Pilot Orifice - LP
2 x Conversion Kit, Electronic Ignition, Natural to Propane
1 x 1-1/2IN SHAKER BAR-SALES
1 x Hf60 Ash Door Hinge-sales
1 x 12 X 6 Tile Frame-gold
1 x Length 1ft.
1 x # 42 burner orifice
1 x Ul Motor Mount W/grommet
1 x 42" Mosaic Masonry™ Bi-Fold Door, Ebony Finish
1 x Circuit Brd-sales
6 x Novasit Pilot orifice
1 x Hf60 Outer Skin Left-sale
1 x 30" Timber Oak Log Set, Ceramic Fiber
1 x BRICK ANGLE-SALES
1 x Bulk-1/4-20x5/8 Wingscrw
1 x Warm Red Full Herringbone
1 x Mag Door Latch-set Of 4
1 x Blue 2.2 qt Enamel Steamer - Lattice Top
1 x 7" Sunburst - Cast Iron Trivet / Enamel Blue
1 x Twisted Rope Fatwood Caddy / PC - Graphite
1 x 3-Piece Trim Kit, Black
1 x 50 piece Bulk Outside Air Kit - Collar Only Kit
1 x 4000w Tadpole Gskt-10 Ft
8 x 5/32" Allen key
1 x 12 X 6 Tile Frame-brsh Ss
1 x -2 FDR ASY-SALES
2 x Scraper, Hf60
1 x Hf60 Fdr Top Insulation
3 x HANDLE ASY/LOAD DOOR
2 x D-shape Knob/shaft-25 Set
1 x Hf60 Comb Side Insulation
1 x Hf60 Rear Foam Insulation
2 x LATCH PLATE-SALES
2 x Caution&danger Label-10ea
2 x Wall mounted LCD manual and Thermostat Modes
1 x Ul Fdr Snout Gasket-10 Pk
1 x Tea Pot Trivet - Black
1 x Fatwood Caddy Refill - 15 Lb Box / Wood
1 x Gasket-ceramic Insert Plt
2 x Ddm Replacement Cable Kit
1 x 7" Sunburst - Cast Iron Trivet / Enamel Green
1 x 3500 JACKET TOP-SALES
1 x Pf/pb/hf Comb Blw Mnt-sal
1 x Black 2.2 qt Enamel Steamer - Lattice Top
6 x Wall Switch Kit, On/Off, White
3 x GASKET-1/2 RD HD-20 FT
1 x Box-4x4 Steel Bin
1 x Round 7" Trivet - Blue
1 x Conversion Kit, Electronic Ignition, Propane to Natural
1 x Ul Short Fd Cvr&gskt-2set
1 x MAG LEG-PAINTED-SALES
2 x Self Adh Grommet-10ft/kit
1 x Split Herringbone Warm Red Masonry Firebrick Walls
3 x Tl2/win Brick Insulation
1 x Split Stacked Warm Red Masonry Firebrick Walls
1 x 2 GRATE HOLDER-CAST
1 x Pre-paint Aerosol Touch-u
1 x BLACK CLASSIC DOORKIT
1 x Hf60 Fdr Cover Right-sale
1 x AIRTUBE PINS & SCREWS - 4 PK#   VARIOUS AIRTUBE KITS
1 x Ul Pellet Feeder Auger
1 x Hf6 Outer Skin Front-sale
1 x Fatwood Caddy - Colonial / PC - Black
1 x Stacked Rust
1 x Black Reflective Porcelain Liner
1 x CONDUIT SUPPORT-SALE
1 x Hf60 Burn Pot Asy-sales
2 x Fem Disc-fully Ins-25/pk
2 x Outside Air Kit With Duct
1 x 3-20-60906 Blade-3 Pack
1 x Press Ign Ul Fdr Body-sal
2 x SHAKER HANDLE MOUNT-SALES
1 x Hf60 Feeder Insulation
1 x Spring Latch
1 x Hf60 Hpr Bkt Right-sales
1 x Ash Dump / Cast Iron
2 x Conversion Kit, Millivolt, Natural to Propane
1 x BRICK 9 X 4-1/2 X 2-1/2
4 x Touch up paint firebox interior
2 x Cleaning Tool 1
3 x Set Of 7 Standard Bricks
1 x 7" Sunburst - Cast Iron Trivet / Enamel Blue Black
1 x PEWTER & BLACK 4PC TOOL FIRESET
1 x 38/61/68 Comb Intake-sale
1 x Hf6 Tube Clnt Cvrplt-sale
1 x Rooster Trivet - Aubergine
1 x Montecito Door Black
1 x 3500 JCKT SIDE W/O HOLE-S
2 x Firetube Lift & Clean Kit
5 x Burner Orifice # 50 - LP 99/00/01/02/03/04
1 x 4" Air Kit, Collar & Hood Only
1 x Convection Blower, with Gasket 1
1 x Pellet Power Cords W/ends
2 x Auger Biscuit, Octagon – Includes A-BUSHTOP & C-F-088 1
2 x SHAKER HANDLE-PAINT-SALES
2 x GLASS FRAME FOR RETROFIT
1 x Round 7" Trivet - Aubergine
1 x 36" Stainless Steel Hood w/4" Brow
1 x Green 2.2 qt Enamel Steamer - Lattice Top
2 x (83529) Auger Pin 1
1 x 48" Masonry Ceramic Glass Bi-Fold Door, Ebony
1 x Hf60 Control Plate-sales
2 x Draft Meter Bolt & Tube
1 x Glass W/gasket
1 x 36" Drain Pan w/ 1" Stainless Decorative Face Ext.
1 x Vintage Red Brick Liner Kit 45
1 x Hf60 Hopper Lid Asy-sales
1 x Amtrol Air Vent
1 x Hf60 Fb Refractory Side
1 x Black Cast Iron Door
1 x Hf60 Draft Sect Refr Side
2 x Conversion Kit, Millivolt, Propane to Natural
1 x 48" Masonry Ceramic Glass Bi-Fold Door, Pewter
3 x Burner Orifice #32 - NG 99/00/01/02/03/04
1 x Hf60 Plumbing Support Kit
1 x Steel Sleeve Bushing
2 x Airwash Glass Spacer Set
1 x Bp Ceramic Insert-10 Pack
1 x 1.25 Hinge-sales
1 x Auger Bushing – Top & Bottom, Brass (No Threads) 2
1 x Air Pump
1 x 2500/2600/3500 SHAKER BKT
1 x 2500/3500 SHAKER BAR-SALE
2 x Burn Pot Cleanout Cover-2
1 x Fatwood Caddy Refill - 8 Lb Bag / Wood
1 x 6 HOLE GRATE LINK-CAST
1 x Orca Steamer 2.2 Quart
1 x Aqua Temp Sensor Cable
5 x Novasit regulator
1 x ADC COVER-PAINTED-SALES
1 x Hf/bh6 Ad Fbx Refractory
1 x 3500 JACKET SIDE W/HOLE-S
1 x Ul Cast Cam Block
1 x ASH PAN-SALES
1 x Pellet Comb Blower
1 x Spiral Baffles (8)-sales
1 x Hf60 Fdr Cover Left-sales
1 x 450w Igniter W/instructs
1 x Black 2.5 Quart Cast Iron Kettle
1 x Blue Black 2.5 Quart Cast Iron Humidifying Kettle
1 x Flame Guide-xxv/accin/p68
4 x Novasit Regulator - LP
1 x Elbow 45-Degree, 8" I.D.
1 x Heating/Cooling thermostat - 120 volt
1 x 38/45/61/68 Fdr Cover-sal
1 x Conversion Kit, Millivolt, Natural to Propane
1 x Ivory Full Stacked
1 x Bulk25-ssscp 3/8-16 X 1/4
1 x Radiation Shield, 8" I.D.
2 x Unit- mountable Rocker Switch
1 x Cypher Fatwood Caddy w/ Fatwood
1 x (891121) Air Switch Tube (Per Foot) 1
1 x Hf60 Fdr Btm Insulation
1 x Blue Black 2.2 qt Enamel Steamer - Lattice Top
1 x Flex Conduit 3/8-7 Ft/kit
1 x ADC HINGE BIN
1 x Hf60 Wrap Around Insul
2 x ROPE/PNTD ASHDOOR-SAL
1 x 40/45 Driftwood Log Set
1 x Hf60 Ash Pan Asy-sales
1 x 38/45/61/68 Gold Ash Lip
1 x Green 2.5 Quart Cast Iron Humidifying Kettle
1 x Compact Termination Secure Flex
1 x COMB MOTOR CVR-SALES
1 x 45/61/68 Mtr Shld-pnt-sal
1 x 400 PI 1992
1 x Blue 2.5 Quart Cast Iron Humidifying Kettle
1 x 48" Masonry Ceramic Glass Bi-Fold Door, Bronze
1 x Hf60 Tube Cleanout-sales
2 x Conversion Kit, Electronic Ignition, Natural to Propane
1 x Hf60 Ash Door Asy-sales
1 x 12 X 6 Tile Frame-brt Nkl
1 x Gas Conversion Kit Electronic Ignition - LP to NG
1 x Bulk-pnd In Stud 8-32x3/4
1 x Ivory Split Stacked
1 x 36" Outdoor Bi-Fold Glass Door, Brushed Brass Finish
1 x 1/2 Pillow Block-4 Pack
1 x Hf60 Wiring Harness
1 x Diagnostic Display Module
1 x 306w/120v Ignitor 15 Fin
1 x Caution Label-15 X 3 Blk
1 x Press/temp Gauge-rear Mnt
1 x 16.5in Br Ss Ashlip Trim
1 x Black 2.5 Quart Cast Iron Humidifying Kettle
1 x Old Town Red Lnr Kit 45-Herringbone
1 x Fatwood Caddy Refill - 4 Lb Bag / Wood
2 x Swell Latch And Spacer
1 x Flex 5" I.D. X 25' long
1 x Starter Kit: for Wall or floor installations. Includes blower (B
1 x 38/45/61/68 Brt Nickel Li
1 x Esp Probe-red/red
1 x BEARING 3/8 ID X 1-1/8 OD
1 x 38/45/61/68 Retr Asy-sale
1 x 18-3/8IN FLAPPER-SALES
1 x Fatwood Caddy - European / PC - Graphite
1 x Flex Compact Term w 24" compressed vent
1 x Air Switch (use part # 80621) 1
1 x Montecito Door Hammered Steel
3 x Glowing Embers
1 x Junction Box Kit (Required with Blower)
1 x Feeder Crossover Tube Kit
1 x "B" Vent Transition Collar - 8" Chimney
1 x Hf60 Fb Refractory Rear
1 x BRICK, SET OF 8, FULL SIZE*
1 x AIR DEFLECTOR 36E BASE ASSY   SERVICE PART
2 x TLC-2000 AIR GRILL-PAINTD
1 x Stove Panel Bracket Kit
1 x Room to Room Doorway Fan / Aluminum
1 x ASHLIP TRIM, SET SCREWS - 10pk#
1 x Hinge - Female Left 2
1 x TLC WOOD KNOB & CAP-2SETS
1 x ASHDOOR GUIDE SET - LG PELLET   SERVICE PARTS
1 x BRICK PANEL-REAR
1 x MAGNETIC LATCH-SET OF 4
5 x # 37 burner orifice
1 x BLOWER, CONV, FPX, NO HOUSING#   ALL WOOD FIREPLACES
1 x DOOR LATCH KIT, 44 "A"/ELITE#   RIGHT SIDE DOOR
1 x Resolute Acclaim
1 x BLOWER, COMB, AGP #   AGP PELLET
1 x AUGER DRIVE COLLAR, 1997 & UP   VARIOUS MODELS
1 x Declaration flush plus arched
1 x BACK DRAFT DAMPER WEIGHTED   36/44 ELITE
1 x BRICK, CUT-SET, FPX 36 ELITE
1 x CAMANO STOVE
1 x 3 Sided Flange, 26x37
1 x TOP-REAR TLC SALES
1 x 33 x 48 Black Trimmable
1 x DRAFT (FLOW) SWITCH#   ALL PS/PI/EXTREME
1 x BRUSH, BENT HANDLE #   COMBUSTOR/FIREBOX BROOM
1 x BAF PLATE, 44 "A" BACK ONLY #
1 x AUGER GEAR MOTOR STOP -LYD/ARB   w/RUBBER BUMPERS
1 x CATALYTIC COMBUSTOR, w/GSKT# � FPX WOOD/APEX 3.6 x 18 x 3
1 x Ceramic Stack Heritage Brown
1 x BRICK-CUT w/ HOLE 9x4-1/2x6   GRNST IGN BRICK, INSERT
1 x BLOWER, CONV, FPX - w/HOUSING#   ALL FPX WOOD MODELS
1 x 6.0 lb. Bag Smooth Glass Pebbles, Green
1 x BRKT SET, GRILL - L/R   AGP PELLET
1 x BLOWER FILTER, COVER GRILL #   BLOWER BOX OUTER COVER ONLY
1 x BRUSH, BOTTLE STYLE#   UNIVERSAL PS/PI
1 x BACK DRAFT DAMPER WEIGHTED   36/44 ELITE
1 x Trim, P2000 Door 1
1 x GLASS CLIP (4), AVA #   VARIOUS MODELS WD/GS/PEL
1 x BAFFLE REAR (LFW)#   12 GA SS304 - 26.500 X 11.288
1 x BOTTOM DOOR-SALES
1 x Panel, Right Side - P2000F 1
1 x 5-11/16 X 13-3/4 RECTGLAS
1 x TLC-2000 AIR GRILL TRIM
1 x CATALYTIC COMBUSTOR, HYBRID#   LFW - 20-3/4 X 3-1/8"
1 x BLOWER FILTER, COVER GRILL #   BLOWER BOX OUTER COVER ONLY
1 x 3/8 TRIM BAR-SALES
1 x NG CONV KIT-SALES
1 x TOP-PAINTED-SALES
1 x AUGER DRIVE COLLAR, 1997 & UP   VARIOUS MODELS
1 x BAF PLATE, REAR, FIREBOX #   36 ELITE
1 x BRICK-WHOLE,9 x 4-1/2 x 1-1/4#   STANDARD FIREBRICK
1 x Brown Open End Log Carrier
1 x AIRTUBE KIT, L-26 LFW HYBRID#   LARGE FLUSH WOOD INSERT
1 x Ceramic Stack Black Tie
1 x DOOR FRAME, RT, BLK 44 ELITE   w/ DR GSKT
1 x DOOR LATCH KIT, 36 "A"/ ELITE   RIGHT SIDE DOOR
1 x BRICK-CUT, 9 x 7 x 2-5/16
1 x Endeavor stove
1 x CATALYTIC HOLDER, FPX 44A #   1992-97
1 x Liner Kit, Black Paint
1 x DAMPER EXT ROD/PULL RING#   13-1/8 - LIB/FRDM/FLBY/LFW
1 x BLOWER, CONVECTION#   93-95BV,91-96PS/PI, 00 LRG PS
1 x 3 Sided Flange, 30x37
1 x BRUSH, BENT HANDLE #   COMBUSTOR/FIREBOX BROOM
1 x AIRTUBE KIT, L-26 LFW HYBRID#   LARGE FLUSH WOOD INSERT
1 x CHIMNEY BRACKET (3)   w/ SCREWS
1 x BLOWER, COMB, PELLET - LARGE#   2000 & UP, YANK/AST
1 x Lakeview Legs, Black
1 x Panel, Rear - P2000F 1
1 x AUGER MOTOR, METERING - AGP#   AGP PS/PI ONLY
1 x TLC-2000 BLOWER-SALES
2 x Vigilant Non-cat
1 x STNRD BLACK DOOR ASY
1 x Hinge - Female Right 2
1 x TL2.0 AIR GRILL OPTION
1 x 4" Flex Adaptor
1 x DECLARATION FLUSH INSERT
1 x BLOWER, COOLING - AGP INSERT   SERVICE PART
1 x BRUSH, BENT HANDLE #   COMBUSTOR/FIREBOX BROOM
1 x Resolute Non-cat
1 x Tlc/oak/tl3 Wood Knob-3pk
1 x 18IN VALVE HARNESS
1 x Conversion Kit, Millivolt, Propane to Natural
2 x Face Plate, Brushed Nickel
1 x Large flush insert arched
1 x BUSHING (DOOR/HANDLE)   7/8" LONG x 1/2" dia
1 x AIR CNTRL, EXTN ROD - UNIV#   4" X 3/8" FWI & FWP
1 x BLOWER CVR-SALES
1 x BRICK-CUT, ANGLE   4-7/8 x 4-1/2 x 59 deg @2-1/4
1 x LEFT SIDE ASY-SALES
1 x Derated Burner Orifice #52 - LP 99/00/01/02/03/04
1 x AUGER MOTOR, ALL PS/PI#   EXCEPT 93-96 PI/AGP PS/PI
1 x BLOWER BOX - FPX WOOD   36/44 ELITE/A
1 x BLOWER, CONV, FPX - w/HOUSING#   ALL FPX WOOD MODELS
2 x Intrepid Non-cat
1 x Conversion Kit, Electronic, Natural to Propane
1 x ASHBOX, PELLET INSERT - LARGE#   2002 & UP
1 x DOOR PAWL, SINGLE - 36 A/E   SINGLE DOOR ONLY
2 x Halogen Bulb, 60w
1 x CHIMNEY BRACKET (3)   w/ SCREWS
2 x Encore
1 x BLOWER, CONV, FPX, NO HOUSING#   ALL WOOD FIREPLACES
1 x AUGER FLIGHT, 2000+ LRG PEL#   2" PITCH
1 x BRICK PANEL-LEFT
1 x Log Carrier Stand
1 x ASHLIP, AVALON AGP   PS/PI
1 x SINGLE BRN REMOTE CONTROL
1 x Highliner, Decorative Accent Trim, Aged Silver
1 x Face Plate, Nickel
1 x 3/8 ALUM S TUBE-SALES
1 x BRICK-CUT, 9 x 4
1 x BLOWER ASS'Y, RIGHT - FW#   FW/FWP/LFW INSERTS
1 x 33 x 42-1/2 Black
1 x Gasket-1/2 Rd Ld-20 Ft
1 x ASHPAN LATCH/KNOB, 1990   PART #90-1393
1 x FLEX 1988
1 x AUGER MOTOR, ALL PS/PI#   EXCEPT 93-96 PI/AGP PS/PI
1 x Liberty stove
1 x 31 x 41 Black
1 x Defiant 1910/1945
1 x AUGER MOTOR, ALL PS/PI#   EXCEPT 93-96 PI/AGP PS/PI
1 x Dvg/bvg Lp Conv Kit-sales
1 x ASH PAN HOLDER   LYDN/ARB WD/PELL
1 x COLD AIR DMPR - FPX ELITE   BI-METALLIC DAMPER ASSY
1 x BLOWER FILTER, REPLACEMENT#   FPX WOOD
1 x Wood Knob & Bolt-2sets
1 x DOOR SWITCH, FPX WOOD#   BLWR CUT-OFF
1 x Glass, Connectors (Specify Model When Ordering) 1
1 x AUGER BUSHING PLT-UPR, LYD/ARB   SERVICE PART
1 x TLC ASH DOOR LATCH HDWR
1 x FL 1984-1986
1 x 16IN STNDRD FRAME-SALES
1 x BLOWER, COMB, PELLET - LARGE#   2000 & UP, YANK/AST
1 x Tan/Navy Canvas Log Carrier
1 x BACK COVER, RIGHT (LEY/ARB PS)   RIGHT CVR ONLY - NO SER LBL.
1 x Façade, Contemporary, Black
1 x Glass Media, 5LB Bag, Disk, Cloud
1 x Variable Speed with Thermo Snap Switch
1 x BURNPOT ASSY, 1990 PS#   ONE-PIECE FIREPOT
1 x BACK DRAFT DAMPER WEIGHTED   36/44 ELITE
1 x Burner Orifice # 56 - LP - Front
1 x BYPS ASSY/CAT HLDR 36"A 92-94'   EXPECT LONG LEAD TIME
1 x AUGER DRIVE COLLAR, 1997 & UP   VARIOUS MODELS
1 x 29-1/2 x 42 1/2 Black
1 x FLUSH BAY 1992-1993
1 x BAFFLE INSULATION, HYBRID#   LFW INSERT
1 x BLOWER FILTER, REPLACEMENT#   FPX WOOD
1 x Suede (Patchwork) Open End Log Carrier
1 x BLOWER ASS'Y, RIGHT - FW#   FW/FWP/LFW INSERTS
1 x Glass Media, 5LB Bag, Disk, Sunset
1 x BRUSH, BOTTLE STYLE#   UNIVERSAL PS/PI
1 x 3/4 X 2-7/16 Ext Spring
1 x DOOR, HINGE PINS, BLACK#   2-PK, FS/INS
1 x BRICK-CUT, 4-1/2 x 2
1 x EcoFlow Conversion Kit, Electronic, Natural to Propane
1 x Remote, On/Off, Hi/Low, Electronic
1 x Face Plate, Nickel
1 x GASKET 1-1/2X9-32 BULBPSA
1 x BRICK-WHOLE,9 x 4-1/2 x 1-1/4#   STANDARD FIREBRICK
1 x Conversion Kit, Millivolt, Natural to Propane
1 x EcoFlow Conversion Kit, Electronic, Propane to Natural
1 x DAMPER EXT ROD/PULL RING#   13-1/8 - LIB/FRDM/FLBY/LFW
1 x Freedom Insert
1 x Louver, Brushed Nickel (For Cast Iron Top Only
1 x LATCH ADJ-LEFT-SALE
1 x BLOWER ASS'Y, LEFT - FW#   FW/FWP/LFW INSERTS
1 x BRUSH, BENT HANDLE #   COMBUSTOR/FIREBOX BROOM
1 x BLOWER, CONV, PEL - 1990 ONLY   CHECK FLANGE DIMENSIONS
1 x 33 x 49-1/2 Black
1 x BEARING, STEEL, ASH DRAWER#   ARBOR/LEYDEN WOOD & PS
1 x Coastal Legs, Brushed Nickel
$101,519.27
Shipping Charges
Share Product
Share via E-Mail Share on Facebook Share on Twitter Share on Google Buzz Share on Digg