$355.50

BYPS ASSY/CAT HLDR 36"A 92-94'   EXPECT LONG LEAD TIME
[91001615-1]

BYPS ASSY/CAT HLDR 36\"A 92-94\'   EXPECT LONG LEAD TIME

Add to Cart

There are currently no product reviews.

Write Review Back
Manufacturers
Live Help

Available 9am-4pm
Search
 
Use keywords to find the product you are looking for.
Advanced Search
1 x 6L : LOG 6 SPLIT TIMBER REFRACTORY 30
1 x Fan Thermodisc (60T12) 110 Degree
1 x 1/4" X 3/16" Shaft Collar
1 x 9B : PILOT LP
1 x 12" FasNSeal Appliance Adapter
1 x Bulk50-hcs 1/4-20x3/4 G8
1 x Log #2, Bo18-f
1 x GRATE INSERT
1 x 8" DIAMETER 12" LENGTH CHIMNEY PIPE
1 x 10" FasNSealW2 Appliance Adapter
1 x Rheostat Knob
3 x Brkt-brick Support
1 x 24" Chimney Pipe SS
1 x 4x6 DIA Co-Axial/Co-Lin 3X4 Adapter
1 x Side Glass (2 per unit)
2 x 7 : VALVE REGULATOR NG MANUAL
1 x AIRTUBE SLEEVE, 1 x 1.250od#   1 PER PACK
1 x Dexen Service Kit
1 x 14 : PRIMARY AIR COVER TUBE BRACKET
1 x 8" DCA FLASHING 0/12-6/12
1 x 4" Reline Hanger Support
1 x 14" FasNSeal Universal Appliance Adapter
1 x PULL RING, METALLIC BLACK #   PAINTED
1 x 36" Chimney Pipe GA
1 x 3" FasNSeal Universal Appliance Adapter
1 x 8" DCA FIRESTOP SPACER
1 x Fan Access Door 99/00/01/02
1 x 15deg Double Wall Elbow
1 x Hopper Handle Pull
1 x Supplementary Support
1 x 9" x 8" Termination Cone
1 x AIRTUBE SLEEVE, 1 x 1.250od#   1 PER PACK
1 x Chimney Cap
1 x 12"x11" Termination Cone
1 x SET OF CUT BRICK
2 x FasNSeal 250mm Male to 10" Female Appliance Adapter
1 x Cast Left Side - Gray
1 x 4" Flex Adaptor
1 x 2 : PULL SCREENS
1 x 1 : GRIDDLE QUAD
2 x 36" Adjustable Vent Length
3 x # 42 burner orifice
1 x PANEL, INSULATION - 3" x 10' #   Wood Burning Inserts
1 x 14 : HANDLE, CERAMIC
1 x AIRTUBE, ROLL PINS, PK OF 6#   1/4" dia. x 5/8"PLAIN STEEL
1 x BLOWER ASS'Y, RIGHT - FW#   FW/FWP/LFW INSERTS
1 x 24" Chimney Pipe - GA
1 x 8" Universal Bvent - Flex Adapter
1 x GSKT, GLASS 3/4" WIDE x 70"#   LOPI WOOD, PELLET & GAS
1 x Door Handle Bolt 1/4-20 X 4 1/2" Hex
1 x BAFFLE INSLTN, FIREBOX SFW   20 x 5-3/4x1/2 SUPER WOOL
1 x Slicer/poker Ass Y
1 x 13 : SPRING DOOR CLOSURE
2 x 7 : INJECTOR - NO.36 - NG
1 x 15deg Double Wall Elbow
1 x 32" Perimeter Trim - Platinum
1 x N/S : EXTERNAL TOOTH LOCK WASHERS 1/4
1 x Ring, Jump (sm Plated)
1 x BRICK-FORMED STEEL, IGNITER - SFW   9 x 4-1/2" - formed steel
1 x GLASS GASKET KIT
1 x Pin Door 3/16x1 1/8-ni
1 x 6 X 15' LENGTH
1 x 7 : FORMED TOP REAR BRKT
1 x 8" Dia Test Port W2
1 x  Tee Cap Drain
1 x Swell Latch And Spacer
1 x 6L : RIGHT TOP LOG
1 x Outside Air Kit (4’’ I.D. x 10 ft. long insulated flex)
1 x 1I : LOG 9
1 x 24" Vent Length
2 x Piezo Igniter
1 x Tee Cap
1 x Starter Collar Assy
1 x 8" Diameter Roof Flashing
2 x 24 : ? 16 ACORN NUT
1 x Oval Cap
1 x GLASS CLIP SCREWS (10), AVA #   10-24 x 1/2", BRASS/CAST DOORS
1 x DuraFlex AL Length - 5.5" x 35'
1 x Fan Speed Control (Rheostat) 99/00/01/02/03/04
1 x HNDLE KIT FL-WD w/ DR KNOBS   EXT ROD, w/ KNOB AND SCREW
1 x Ashpan Cover W/handle-(dr
1 x 1 : DOOR HANDLE
1 x Tee Cap
1 x ROLL-PIN TOOL#   SERVICE PARTS
1 x 18" Double Wall Vent Length
1 x BRKT SET, L/R - SFW   SMALL FLUSH WOOD
1 x 9" Dia Termination Tee
1 x POWER CORD
1 x Oval Firestop Spacer (6" x 2") (requires 2)
1 x AIRTUBE KIT, A-1 700/901#   SR.#4063 TO #15205
2 x N/S : SMOKE SHIELD
1 x BRUSH, BENT HANDLE #   COMBUSTOR/FIREBOX BROOM
1 x CONV PARTS, LP - PSE   DVL GSR2
2 x GSKT, GLS 15/16"x50ft. 302-B#   VARIOUS WOOD, PELLET & GAS
1 x GLASS, LPI LARGE, DOUBLE#   5mm NEOCERAM - 8.625x9.718
1 x Glass, Ssw20
1 x Novasit Pilot Assembly - NG
1 x Leg Bolt Pkg D/r/i-wr
1 x 52 : HEX NUTS 1/4-20
1 x AIR DEFLECTR, BRNR(FRT-33/CYP)   SERVICE PART
1 x 13 : ANDIRON
1 x 24" Double Wall Vent Length
1 x 44 : DOOR CAST
1 x 26 : MAGNET
1 x 4 : PAN HD, PH 10-24 X 3/8IN Z
2 x BRICK - #4, LEFT NOTCHED
1 x Hearth Refractory Assy
1 x Knob Therm Hndl-maple-blk
1 x 12" Length Round Rigid Pipe
2 x Fan Speed Control Knob 99/00/01/02/03/04
1 x N/S : TOP BRICK RETAINER
1 x 21 : AIR DIVIDER, RIGHT
1 x HANDLE (SPRING), A/C - BLACK#   3/8" id x 2.500" LONG
1 x GSKT, ROPE [50ft] 3/8" dia. BLACK   BULK - 50'
1 x FASTENER - SCW BLACK 6 PK   PHPSMS, #8 x 3/8"
2 x N/S : 3/16IN COMP NUT/INSERTS 006B10065
1 x 12" Double Wall Vent Length
1 x 36" Drain Pan w/ 1" Stainless Decorative Face Ext.
1 x 6" Diameter Wall Strap Metal
1 x 3/8" X 19" X 9 3/8" (2 Notches)
1 x AIR GRILL TRIM 27.82
1 x Form Canopy 36 Service
1 x N/S : RHEOSTAT
1 x Standard Appliance Connector
1 x 10B : ON/OFF KNOB EXT
1 x Oak Top Load Door-sales
1 x 380-96
1 x 36" Pipe Length
1 x Damper Knob
1 x Glass Retainer
1 x 52 : CONTROL SHIM
1 x Standard Tee
1 x 40515 Handle 1
1 x Storm Collar
1 x DuraFlex AL Kit
1 x Graph. Spy Pnt 3 Oz.+
1 x High-Wind Cap
1 x Pilot Ods Rp Op# 8413
1 x 33 : ASHLIP- BISCUIT
1 x 18 : MANTEL (CLASSIC)
1 x 1 1/4" O.D. X 19" L. (Snap In)
1 x FINISH SUPPORT WITH COUPLER
1 x N/S : 1/4-20 X 1IN1/2 HEX HD SCREW (8)
1 x 20a : BLOWER ONLY
2 x GLASS, AVALON LARGE#   5mm NEOCERAM - 10.125 x 19.000
2 x Neoclassic Flat Screen Large - New!
1 x MANUAL, CAMANO 2010   AVALON WOODSTOVE
1 x Bracket Mounting-wsi
1 x STOVE GASKET CEMENT Black 2.7 oz. Tube
1 x N/S : 20 DEGREE OFFSET FLUE CONNECTOR
1 x HANDLE ASSY, AVA w/BRASS CAM #   & WOOD HANDLE - COMPLETE
2 x Control Board Knob Pkg-10
2 x 4 - Tool Fireset
2 x INSULATED TEE
1 x INSULATED TEE
1 x CHIMNEY ADAPTER
1 x Handle Asy-sms,tl3,68,xxv
1 x Oak/tl3 Dmpr Frame-sales
1 x INSULATED WALL THIMBLE
1 x ADJUSTABLE ROOF FLASHING 1/12 -7/12
1 x Weston Leaf Screen - Small / PC - Roman Bronze
1 x EXTERIOR INSTALLATION KIT
1 x 4" x 3" Tapered Reducer
1 x INSULATED TEE
1 x RADIATION SHIELD
1 x INSULATED WALL THIMBLE
1 x REPLACEMENT TEE CAP FOR DTP-T
1 x 43" Board / Single Cut
1 x 37" Board / Single Cut
1 x 7 : REAR INJECTOR LP 50
2 x KNOB, PHENLIC#   BLACK - 1" dia
1 x ROLL-PIN TOOL#   SERVICE PARTS
1 x 1/2" X 18" Flex Line - Gas Inlet
1 x # 37 burner orifice
1 x 45deg Double Wall Elbow
1 x Screens
1 x Screens
1 x Screens
1 x Decorative Carriage Bolt For Handle/Hood - Brushed Copper (Each)
1 x Box 1,fountain Asm-rebuil
1 x ASH PAN-SALES
1 x 6" Vent Length
1 x 6" Vent Length
1 x Louver Bracket Left Form
1 x Spring Handle - Small
1 x 6"DF316-25KT
1 x FasNSeal Flex 50' Length
1 x Pilot Ods Rn Mv Op#841182
1 x SNAPDISC BRACKET - 1750   WOOD STOVE
1 x ASH LIP
1 x HANDLE ASSY, AVA COT/MISSION   w/CAM, SPRNG HANDLE
1 x N/S : FIREBRICK RETAINER BRACKET SCREWS
1 x BRICK-CUT, 9 x 2-1/4 #
1 x GLASS CLIP SCREWS (10), AVA #   10-24 x 1/2", BRASS/CAST DOORS
1 x 36" Adjustable Vent Length
1 x Tee Cap
1 x Rear Panel
1 x PAINT, METALLIC BLACK 3oz#   SPRAY CAN
1 x Burner Orifice # 54 - LP - Rear
1 x Feeder Crossover Tube Kit
1 x 6" Vent Length
1 x 7"DFPRO 20 Kit
1 x 3" Prairie Termination Cap Black
1 x 31 : HEX HEAD CAP SCRE, 1/4-20X5/8IN BLACK
1 x CNTRL MODULE, BRNR - GS1#   ALL GS1 MODELS
1 x FASTENER - SCW, 5 PK NAME TAG   #10 x 3/8 RHW BLK ZINC
1 x 19 : TWIG (2 PER LOG SET)
1 x Outdoor Bi-Fold Door with Frame and Hoods, Brushed Stainless
1 x Refractory, Rear Servi
1 x VENT, WOOD ZC LINER KIT 35*   810007152
1 x 68/35 Door Trim-gold
1 x 24" Chimney Pipe - SS (CF)
1 x Snap Disc Control (blower
1 x N/S : BLACK LOUVER
1 x BRICK-CUT, 8-1/4 x 2-7/8   ASH PAN PED - OLY/RAINIER
1 x Hanger Rod 42 For Servic
1 x Draft Hood Connector
1 x 12" Dia Termination Tee
1 x 25488 SIDE,RIGHT CABINET (891193) 1
1 x N/S : REFRACTORY SPACERS
1 x 45deg Elbow
1 x Spring Handle - Large
1 x Glass Retainer Clips\Glass Screws - 8 Per Package
1 x MOISTURE METER#   FIREWOOD MOISTURE
1 x Adjustable Roof Flashing
1 x 90deg Elbow
1 x Wall Switch Kit, On/Off, White
1 x Top Relief Plate 99/00/01/02/03/04
1 x DOOR, WASHER, .390 x .630 SS#   PK OF 8
1 x 10" W2 Appliance Adapter
1 x AIRSLIDE-SALES
1 x Clip Glass-def 02
1 x GSKT, GLASS, 75" - FWP/LFW#   GSKT ROPE, 1/4" dia, BLACK
1 x 5"DF316 35 Kit
1 x FC 5/8 Spark Arrestor Mesh Cap 13x21
1 x 9A : VALVE UV SIT 820.637 RN
1 x GSKT, AIR CNTRL - END/1750/REV   SERVICE PART
1 x FC 3/4 Mesh Slip-In Round Cap 9"
1 x Blo Service Kit
1 x 1 : PIEZO IGNITOR
1 x Refractory Brick Bracket
1 x Pressure Relief Door Back 99/00/01/02/03/04
2 x Novasit Pilot Orifice - LP
1 x EMBERS, ROCK-WOOL 5 gram#
1 x Forever Guard Liner 3/4 Top Cap Mesh 9"
1 x ADJUSTABLE LENGTH
1 x # 30 burner orifice
1 x GSKT, IGNITER   GREENSTART IGN, INSERT
1 x 25863 REGULATOR, MANUAL FEED RATE 1
1 x Glass Media, 5LB Bag, Platinum
1 x GSKT, ROPE, DR 7/8" x 64" BLACK#   VARIOUS WOOD/PEL/GAS
1 x Front Vents - Timberline Brown
1 x Sensor Mounting Bracket
1 x Louver Bracket Right Form
1 x DOOR CAM, BRASS #   VARIOUS MODELS
1 x CONVECTION AIR DEFLECTOR   DVL-EFII /33DVi / DVL-GS
1 x MANUAL, FLUSH WOOD HYBRID-FYRE   INSTALL/OPERATION
1 x HANDLE (WOOD), DOOR - AVALON#   1/2" id x 4.169" LONG
1 x MOISTURE METER#   FIREWOOD MOISTURE
1 x GRMT/SPACER (4) - BLOWER#   1997+ PEL/1995+ GAS
1 x CNTRL MODULE, BRNR - GS1#   ALL GS1 MODELS
1 x CNTRL MODULE, BASIC FUNCTION#   GSB2 MODELS
1 x 10" FasNSeal Appliance Adapter
1 x Flush Glass Screws 10-24 X 1/2" (Each)
1 x Touch up paint powder coat exterior
1 x KNOB (WOOD) w/ SCREW#   A/C - ASH/ALDER
1 x Decal Control Panel - Rear 99/00/01/02/03/04
1 x DAMPER, YOKE ASS'Y #   LIBERTY/OLYMPIC
1 x BRICK RETAINER (2) w/SCW#   UNIVERSAL PART
1 x 24" Vent Length
1 x Hampton Logo Plate (Each)
1 x 30deg Elbow
1 x PAINT, METALLIC BLACK 3oz#   SPRAY CAN
1 x 891296 TRANSITION DUCT, 10" ROUND 1
1 x Spark Generator Battery Holder
1 x Tl3 Load Door Latch Hdwr
1 x P35i Lid Asy-sales
1 x PANEL, INSULATION - 3" x 10' #   Wood Burning Inserts
1 x PAINT, METALLIC BLACK - 12oz.#   SPRAY CAN
1 x TOOL HOLDER   (w/MNTG SCW), SERVICE PART
1 x 69710 WELDMENT, BURNPOT 1
1 x FasNSeal Flexible Vent Female Adapter
1 x MOISTURE METER#   FIREWOOD MOISTURE
1 x 30-DEGREE INSULATED WALL THIMBLE
1 x 48" Chimney Pipe - GA (CF)
1 x Acc/xxv Distribution Blwr
1 x BURNER COVER - 1080 CF   SERVICE PART
1 x CNTRL BRD PLUG, FOR OLD HRNS#   97' and UP PS/PI, EXCEPT AGP
1 x 11" - 17" Adjustable Pipe/w welded seam
1 x FACE SCREW, BLACK #   BLACK, 1"-1/4-20 PHPMS - 6 PK
1 x ASHPAN PAWL - NO KNOB   ELAN/400/900 PS-PI 1991-1996
1 x BRUSH, BOTTLE STYLE#   UNIVERSAL PS/PI
1 x HANDLE (WOOD), DOOR - AVALON#   1/2" id x 4.169" LONG
1 x BRICK-WHOLE,9 x 4-1/2 x 1-1/4#   STANDARD FIREBRICK
1 x 42" Surround, Stainless Matte
1 x Side Right Cast Charcoal Grey
1 x MANUAL, RAINIER (OMNI) 2002
1 x 12" Straight Length Pipe (black)
1 x CERAMIC BRICK RETAINERS   w/SCREWS - SET OF 2
1 x FASTENER - SCW #8 x 3/8" 6 PK   HWSHSMS, #8 x 3/8" CRIMPTITE
1 x 18" Adjustable Vent Length
1 x SNAP-DISC, 5/8" w/BRACKET#   WOOD - AVA FRONT, UNIVRSL REAR
1 x GLASS, AVALON SMALL#   5mm NEOCERAM - 10.125 x 17.094
1 x BRKT,CMPLT KIT , DVS BK PLT   BK PLT-DVS/EF/GS/31
1 x 68/35 Door Trim-brt Nickl
1 x Tee Cap
1 x FACE, FL WD LG UNIV RECT*
1 x Oak Top-sales
2 x Front Control Cover Plate 99/00/01/02/03/04
1 x GLASS CLIP SET#   1250/1750, AGP
1 x 30deg Elbow
1 x BATTERY TRAY, GS - "AA"   SERVICE PART
1 x BACK HEAT SHIELD-TOP
1 x FASTENER - SCW BLACK 6 PK   PHPSMS, #8 x 3/8"
1 x 12" Chimney Pipe - GA
1 x Robertshaw Thermopile
1 x ROLL-PIN TOOL#   SERVICE PARTS
1 x Ul Motor Mount W/grommet
1 x BLOWER
1 x GSKT ROPE, BLK - GLASS 3/8"x66"#   AVALON WOOD, PELLET & GAS
1 x FC 3/4 Mesh Single Flue Pro 10x10
1 x GLASS w/GASKET - COTTGE/MISSN#   COTTAGE/MISSION
1 x GLASS w/GASKET - CAMANO   CAMANO - WOOD/AGP PELLET
1 x PAINT, METALLIC BLACK 3oz#   SPRAY CAN
1 x Double Wall IPS Draing Fitting
1 x HW PACK, BLWR - REAR   WOOD STOVE-2
1 x HANDLE ASSY, AVA COT/MISSION   w/CAM, SPRNG HANDLE
1 x ASH HOUSING ASSEMBLY
1 x FLAT ROOF FLASHING
1 x 40571 HINGE BLOCK (C-F-291) 2
1 x ASHPAN PAWL - NO KNOB   ELAN/400/900 PS-PI 1991-1996
1 x HINGE LEAF FACE - (ver. 1)#   ARBOR/LEYDEN WOOD/PS
1 x GSKT, GLASS 3/4"x50ft. 301-B#   ASHESIVE BACK, GLS GSKT
1 x Restrictor
1 x GSKT ROPE, 5/16" dia, BLK 50"#   Arbor/Leyden
1 x GSKT, DOOR 7/8" x 50' BLACK#   ROPE - MISC. GAS/WOOD/PELLET
1 x GSKT,COMB BLWR MOTOR, LARGE#   7" DIA.
1 x SWITCH, START, PELLET 1990-96#   ROCKER SWITCH
1 x SMS SCRAPER KIT
1 x Adjustable Roof Flashing
1 x Paint Enamel Touch Up Seaside Sand
1 x Novasit Regulator - LP
1 x Flame Guide-38p/p61/100
1 x 30deg Elbow
1 x 40578 Feed Door 1
1 x GLASS - SPOKANE#   (1250/1750) 15.397 x 9.215
1 x SNAP-DISC - 120deg NO#   NORMALLY OPEN
1 x Robertshaw Regulator - LP
1 x 9 : WASHER
1 x Bracket Ashpan Asm-enc
1 x Oakwood Ash Pan-sales
1 x 8"DFPRO-35KT
1 x Novasit Pilot Assembly - LP
1 x FC 3/4 Mesh Slip-In Round Cap 6.5"
1 x 5" - 3" Branch Tee
1 x BURNER ASS'Y, 1080CF#   PAN
1 x 18" Chimney Pipe - GA
1 x P35i Lid Asy-(pre)-sales
1 x 12" Chimney Pipe (black)
1 x BATTERY HOLDER, GSR-2#   PRO-FLAME-2
1 x GLASS, AVALON SMALL#   5mm NEOCERAM - 10.125 x 17.094
1 x ANDIRON, WROUGHT IRON*   864 & CLEAN FACE
1 x FasNSeal Flex 20' Length
1 x 12" Dia Aerco MLX EXT 2295-3060
1 x 891455 WLDMT, BURNPOT 1
1 x 36" Adjustable Vent Length
1 x 5.5 X 20' LENGTH
1 x DOOR SHELL,BRS, SML HINGE AVA#   SHELL ONLY, NO GLS, GSKT, HNDL
1 x 3" Dia. 2 3/16" Starter Collar Harman
1 x GSKT, ASHPAN DROP HOLE   5.541" x 5.541" - ASHPAN PED.
1 x 3/8 ALUM J TUBE-SALES
1 x BRICK-CUT, 6 x 2-1/8   ASH PAN PED - OLY/RAINIER
1 x TOOL (PULL), AVA w/WOOD HNDL   SERVICE PART
1 x GLASS, AVALON SMALL#   5mm NEOCERAM - 10.125 x 17.094
1 x BURNPOT, SS - LARGE #   ALL LG PS/PI STEEL & CAST
1 x COVER PLATE, HEAT PORT   w/FASTENERS
1 x HW PACK, FACE, ARC GLD, 44/36#   w/ (12) SCREWS
1 x BRKT, TOP, ARCH FACE-864#   TOP LF & RT FACE BRACKETS
1 x AIRTUBE SLEEVE, 1 x 1.250od#   1 PER PACK
1 x 6"DF316-30KT
1 x 18" Double Wall Vent Length
2 x 5/32" Allen key
1 x 891341 Shaker Bar 1
1 x Touch Up Paint - Timberline Brown
1 x Valve Assembly Gasket
1 x CONTROL PANEL LABEL
1 x 5.5 X 15' LENGTH
1 x WOOD DOWEL, PEDESTAL, AVA SML   23-1/8" LONG, 2-PK
1 x 7" FasNSeal Flex Raincap
1 x High-Wind Cap
1 x P35i 23.5 In Hopper-sales
1 x Rear Control Panel 99/00/01/02/03/04
1 x FASTENER - SCWS 8-PK GLS CLIP#   8-32 x 3/8" PH TORX TYPE F
1 x Valve Assembly - NG
1 x PANEL, FL WD LG 1PC 32.5 x 42*
1 x 18" Adjustable Vent Length
1 x CNTRL MODULE, FAN w/MOLEX#   DVS/DVL/616 GSR INSERTS
1 x 15deg Elbow
1 x Stainless Steel Outdoor Weather Cover
1 x BLOWER, LT, GAS INS - 2005+ #   EF-II/DVS/DVL/31/33
1 x GSKT, ROPE [50ft] 3/8" dia. BLACK   BULK - 50'
1 x GRMT/SPACER (4) - BLOWER#   1997+ PEL/1995+ GAS
1 x 12" Dia Test Port W2
1 x GLASS CLIP SET, RECT(FWP)#   SET OF 4 GLS CLIPS
1 x 18" Adjustable Vent Length
1 x BURNER ASS'Y, REAR - XTR   XTREME
1 x GLASS w/GASKET - COTTGE/MISSN#   COTTAGE/MISSION
1 x 36" Vent Length
1 x AIR DEFLECTOR, NG - 864 HO EF   EMBERFYRE BURNER - NG
1 x BRICK-CUT, ANGLE   4-7/8 x 4-1/2 x 59 deg @2-1/4
1 x CATHEDRAL SUPPORT BOX
1 x 3-Way Gold Contact Switch 99/00/01/02/03/04
1 x LONG GRATE 15 IN-CAST
1 x TRIM, ONE PC PANEL, 30.5 X 42*   FL WD M, DVL, 616, RAD LG, ANS
1 x PAINT, METALLIC BLACK - 12oz.#   SPRAY CAN
1 x 88100 Exhaust Blower Gasket 1
1 x GSKT, INTAKE AIR (LEYD/ARBR)   AIR CONTROL INLET-8.200 x 4.25
1 x BRKT, BTM, ARCH FACE-864   BTM LF & RT, ATTACH TO FP
1 x HINGE DOOR LEAF, 4-PK vr1#   LEYDEN/ARBOR WOOD/PS
1 x ACCESS PLTE, BLOWER DVL EG   w/ FASTENERS
1 x Combustion Fan
1 x Ul Fdr Snout Gasket-10 Pk
1 x BRKT, FACE CONNECTORS L/R#   DVS /EF II/GS/31
1 x FACE SCREW, BLK, 1-1/2" (12)#   XTRA-LONG LGT - 1/4-20 PHPMS
1 x DOOR HANDLE LEFT - ARBOR   w/ACORN NUT
1 x 3-n-1 DOOR SHL HW SM/LG   HARDWARE ONLY
1 x FACE SCREW, ART NKL, 1.5" 6-PK   ARTISAN, XL LGT, 1/4-20 SQHMS
1 x Ash Lip Sr42 Service
1 x BRKT, FACE CONNECTOR L/R - SET   DVLEF-II/DVLGS/33DVi
1 x 3/4" I.D. x 2" O.D. Flat Washer
1 x Fan Speed Controller
1 x SIENNA OWNERS MANUAL
1 x VISUAL DFLCTR - SUPPORT, L/R   564SS/864TRV
1 x Adjustment Gear Assembly 99/00/01/02/03/04
1 x EF2/3/MER SLIDER DAMPER PLATE (POST 11/93)
1 x AIR CONTROL SHUTTER, REAR   CYP,GRNFLD,864HO, 33DVi,DVLGSR
1 x GSKT, IGNITER   GREENSTART IGN, INSERT
1 x 306w/120v Ignitor 15 Fin
1 x DOOR LATCH STRAP, G5/G11/G13/#   G16/G22 - OLD STYLE 1998' UNIT
1 x SNAP DISC ASSY, 42 APEX   w/ SPACER
1 x Gold Plated Knob
1 x Bulk50-hcs 3/8-16 X 1 Z
1 x CHISEL, PELLET - vr.2#   AGP/FXFR/DRFLD - CHK SR#
1 x Garland Collection - Tool Set
1 x Airslide Shaft-oakl Sales
1 x BRKT HOOK, L/R, PROFILE FACE   616 INS - ATTACH TO FACE
1 x Transflo Blower - Motor Only
1 x Black 12oz Aerosol Spray
1 x AIRTUBE KIT, L-36 NX LFW   NEXGEN LFW
1 x Bottom Louver Hinge Bracket (Each)
1 x KNOB (PHENOLIC), 3/4" dia   1/4-20 THREAD - BALL SHAPED
1 x Control Brd Label 61/sms
1 x 1/2 Pillow Block-4 Pack
1 x ADJ FLASH for Roof Pitch = 0/12-6/12
1 x Flex Conduit 3/8-7 Ft/kit
1 x ANDIRON KIT, NX FWL   NX GEN FWL
1 x BLOWER ASS'Y, RT LINEAR PB#   42/54/72 PRO BUILDER LINEAR
1 x Replacement Glass (9 1/8" X 15 5/8")
1 x EMBERS, ROCK-WOOL 50 grams#   8X10 BAG
1 x Thermodisc 160 Degree High Limit (60T12)
1 x KNOB (WOOD) w/ SCREW, BLK FWI#   3/8 i.d. w/HOLE - PAINTED BLK
1 x GSKT, EXH. CLEAN-OUT, LEY/ARB#   5-7/8" DIA
1 x DAMPER BLOCK OFF COVER (1)   w/ FASTENERS
1 x BRICK-CUT, 6-3/4 x 4-1/2 #
1 x Leaves Flat Screen - New!
1 x MAGNET w/OUT SHEATH   w/ MOUNTING HW
$60,149.36
Shipping Charges
Share Product
Share via E-Mail Share on Facebook Share on Twitter Share on Google Buzz Share on Digg