1 x | Tl3 Door Asy-sales |
1 x | 44M HOPPER AND LID ASY-SA |
5 x | 1/8 Silicone Tubing-5 Ft |
1 x | Brick - Back Right |
3 x | GLUE-32 OZ GASKET-BIN |
1 x | Conversion Kit, Electronic Ignition, Natural to Propane |
1 x | 6 Inch Outside Air Termination Vent |
4 x | Bulk100-fhn 5/16-18 Z 5 |
2 x | # 33 burner orifice |
2 x | 3.5 Inch Sprocket-sales |
1 x | Screens |
2 x | Compact Termination SV4.5 20" w shield |
2 x | Fan Speed Controller |
1 x | Cathedral Andirons / PC - Black |
2 x | 7" Sunburst - Cast Iron Trivet / Enamel Blue Black |
1 x | Hopper Lid Switch |
4 x | 6.0 lb. Bag Smooth Glass Pebbles, Green |
1 x | Ball Plunger Hose Clamp - Bottom Louver (Each) |
4 x | Spring Clip-20 Pack |
1 x | Air Intake Pipe - 6 Inch x 48 Inch Long |
1 x | FLAPPER HOOK W/HOLE-SALES |
2 x | 50" Mosaic Masonry™ Bi-Fold Door, Ebony Finish |
1 x | Andiron Kit, Classic |
2 x | Flue Collar Heat Shield Vertical - Large |
1 x | 83202 10-24 x 3/8" PH PN HD MS 4 |
1 x | 83415 NUT, 1/4-20 JAM 6 |
2 x | Conversion Kit, Millivolt, Natural to Propane |
1 x | Ash Pan – P2000F 1 |
5 x | Fan Thermodisc (60T12) 110 Degree |
2 x | 4 Output Circ Brd-sales |
2 x | 38/61/45 Door Trim-bright |
2 x | Blue 2.5 Quart Cast Iron Humidifying Kettle |
1 x | Iron Rail, Decorative Accent Trim, Aged Silver |
1 x | Outdoor Window Kit (Light-Tinted Tempered Glass) With Outdoor Ba |
1 x | Auger GF55/GFI55 |
1 x | D/bvg/gin/flx Snapdisc |
1 x | Ash Drawer GF55 |
1 x | 5/8" I.D. Auger Collar With Screw |
1 x | Rear Air Deflector |
5 x | 1/2 Pillow Block-4 Pack |
2 x | Decorative Face Trim, Black |
5 x | Wall Switch Kit, On/Off, White |
1 x | Liner Kit Ceramic, Trad. Red |
3 x | # 31 burner orifice |
1 x | Fan Speed Controller Knob 99/00/01/02/03/04 |
5 x | 3/16 Rubber Spacer-10pack |
1 x | 38/45/61/68 Retr Asy-sale |
2 x | 2 GRATE HOLDER-CAST |
1 x | Tl3 Dmpr Link Arm W/knob- |
3 x | 7/8" Door Gasket Repair Kit |
1 x | Switch Kit For Hopper Ext |
1 x | Nake Panel Kit, Black Porcelain |
1 x | -2 FDR ASY-SALES |
1 x | Exhaust Adapter Plate Weldment |
2 x | 42" Mosaic Masonry™ Bi-Fold Door, Pewter Finish |
2 x | GASKET-5/8 RD HD-10 FT |
1 x | Fatwood Caddy - Pointsetta - New! / Black w/ Various |
1 x | 5/8" Grommet--Cut |
1 x | Auger gasket |
2 x | Auto/Manual Fan Switch |
8 x | Standard Single Speed |
2 x | Duplex Receptacle Box |
1 x | FLAME GUIDE |
2 x | Thermocouple-use W/pse |
3 x | Flex Compact Term w 36" compressed vent |
2 x | BRASS MALE COMP FITTING |
1 x | 36" Perimeter Trim Kit - Platinum |
6 x | Fitting Elbow 90 Degree Forged (Valve Outlet End) |
4 x | Variable Speed with Thermo Snap Switch |
1 x | Nake Panel Kit, Black Satin Paint |
3 x | Flex Compact Term w 18" compressed vent |
1 x | 36" Fixed Door, Brushed Brass |
4 x | Full Skid Of Brick-sales |
1 x | 18" Section Hi-Temp Double Wall Pipe Snap Lock |
1 x | 3-piece Trim Kit, Brass |
1 x | Adapter-pipe Oakl Sales |
1 x | 1700 CERAMIC BAFFLE - L/R SET |
1 x | Hopewell Fireback / Cast Iron - Black |
1 x | ONE HOLE FEED COVER |
2 x | Piezo (ignitor) With Nut |
1 x | Deer Andirons / PC - Graphite |
1 x | Oak/tl3 Ss Brick Clip Set |
1 x | Wire Bristles |
1 x | 75CFM BLOWER-7FT CORD |
1 x | Ember Screen for 24" Grate / PC - Black |
1 x | 4rpm Cw Outbrd Motor-120v |
1 x | Spring Latch |
2 x | Motor Mnt W/grommet-2 Pk |
3 x | Black 12oz Aerosol Spray |
1 x | Short Shank Andiron Adapter 3" / Black Paint |
1 x | Handle Replacement Kit - P22 1 |
1 x | Conversion Kit, Electronic Ignition, Natural to Propane |
1 x | Brick - Bottom Left |
1 x | SET OF CUT BRICK |
3 x | Door Frame Only - Flush |
3 x | "B" Vent Transition Collar - 8" Chimney |
2 x | 3 POSITION ROCKER SWITCH |
1 x | Diamante Louver Kit |
1 x | 100 CFM BLOWER OPTION |
2 x | 1/2 Spring Handle-3 Pack |
3 x | Door Frame Assembly - C/W Glass |
1 x | HB35 28IN ARCH SCROLL GRI |
1 x | DOOR KIT-BLACK CLASSIC |
2 x | 38/44/61 Handle Asy-sales |
1 x | Ivory Enamel Touch-up Paint |
2 x | Glass Media, 5LB Bag, Copper |
1 x | 2" Clearance Firestop Spacer (1ea) |
1 x | EMBER STRIP-ONE PIECE |
2 x | Ceramic Log (A-M-LOG) 1 |
1 x | Embers - Bag |
1 x | HB35 BURNER SCREEN-SALES |
1 x | SF3500 BLOWER BRACKET-SAL |
1 x | HB35 27IN SCROLL DOOR |
1 x | Tube Scraper Rod Access Cover Gasket |
1 x | 48" Section Hi-Temp Double Wall Pipe Snap Lock |
4 x | Handle Replacement Kit - P23, P24, P1000PWA/PWC 1 |
1 x | Cypher Fatwood Caddy w/ Fatwood |
1 x | 3/8 Rd Black Ld-5 Ft |
5 x | Unit- mountable Rocker Switch |
2 x | Oak Rear Brick Retnr Set |
8 x | 4" Air Kit with Collar, Hood & 3' Flex |
1 x | 83045 WASHER, 5/16"ID X 3/4" OD X 1/16 THK 3 |
1 x | Heat Exchange Tube Cleaning Rod - P23F 1 |
1 x | 83261 Lock Nut, 1/4-20 2 |
1 x | Bouquet Fireback / Cast Iron - Black |
2 x | STRAIGHT HOT WATER COIL |
1 x | HOPPER EXT KIT-22.6 INCH |
1 x | Screens |
6 x | # 37 burner orifice |
1 x | Fatwood Caddy Refill - 4 Lb Bag / Wood |
1 x | Black Faceplate Trim - Complete |
1 x | Manual reset high limit thermodisc |
1 x | Auger Motor |
1 x | Control Panel, Digital 1 |
1 x | 24" Masonry Grate 20mm / PC - Black |
1 x | BOSTON FPI CAST SURROUND SIDE |
2 x | Glass Clips & Hdwr-sales |
1 x | 3-piece Trim Kit, Stainless |
2 x | SCREW-BHSCS 10-24 X 3/8 |
2 x | Hopper Throat Gasket |
1 x | Combustion Blower Transition – Aluminum 1 |
7 x | Glowing Embers |
3 x | SHAKER BLOCK-SALES |
3 x | Compact Termination Secure Flex |
1 x | Conversion Kit Natural to Propane |
3 x | 38 X 4 Ul Fdr Pusharm-sal |
2 x | KNOB/SHAFTS-SET OF 10 |
8 x | Novasit Pilot orifice |
1 x | Ul Pellet Air Intake-sale |
1 x | Base Standoffs (Set Of 2) |
4 x | Control Panel Faceplate for A-E-401 1 |
2 x | FURNACE FILTER BOX CLIP-S |
1 x | Bulk100-fhscs1/4-20 X 1/2 |
1 x | Screens |
1 x | 83250 1/4-20 KEP NUT (BLACK) 6 |
2 x | AIR FILTERS-14X20X1-12PK |
2 x | 2500/2600/3500 SHAKER BKT |
6 x | Novasit regulator |
1 x | Connector 3/8" Compression X 3/8" Male (Valve |
1 x | Lions Fireback |
1 x | Screens |
2 x | Tl2/3 Hinge Spacer-sales |
1 x | Quick Disconnect Pipe Weldment |
1 x | HB35 ARCH OPENFACE |
1 x | RESTRICTOR PLATE-SALES |
3 x | Hinge - Female Right 2 |
1 x | 36" Standard Bi-Fold Glass Door, Black |
1 x | Burner Orifice #51 - LP |
1 x | Chimney Support above 30' |
1 x | Electronic Ignition - NG to LP |
2 x | Ash Plug Tool Handle |
1 x | 3/4 Feeder Tensioner Uhmw |
3 x | 6.0 lb. Bag Smooth Glass Pebbles, Blue |
13 x | Touch up paint powder coat exterior |
1 x | Decal - Converted To Natural Gas |
1 x | Storm Collar (1 ea.) |
1 x | 16.5in Br Ss Ashlip Trim |
3 x | 306w/120v Ignitor-10 Pack |
1 x | Ram's Head Andirons PC - Black |
2 x | Duplex Receptacle Box Cover |
1 x | Front Burner Tube W/ext |
1 x | Black Enamel Touch-up Paint |
4 x | Draft Meter Bolt & Tube |
1 x | HB35 HIGH VOLT HARNESS |
1 x | 48 Inch Hopper Lid Switch |
1 x | Door – P22, P1000PW – Painted (PW) 1 |
2 x | FLEX HOSE |
1 x | Tl200 Gasket Plate Asy-sa |
2 x | 7" Sunburst - Cast Iron Trivet / Enamel Blue |
2 x | Cam Latch – P23, P1000PWA, P24 1 |
1 x | Blue Black 2.2 qt Enamel Steamer - Lattice Top |
5 x | Set Of 7 Standard Bricks |
14 x | 5/32" Allen key |
1 x | Brick - Left Side |
1 x | Frontier, Decorative Accent Trim, Aged Silver |
1 x | Quick disconnect gasket (exhaust) |
2 x | Oak/tl3 Brick Air Gskt-4 |
1 x | Glass Media, 5LB Bag, Platinum |
3 x | Derated Burner Orifice #52 - LP 99/00/01/02/03/04 |
1 x | SET OF CUT BRICK FOR 2500 |
2 x | Heating/Cooling thermostat - 120 volt |
1 x | Screens |
2 x | Thermostat - Low Voltage |
2 x | Rooster Trivet - Aubergine |
1 x | Screens |
2 x | Door Handle, Complete Replacement Kit 1 |
1 x | Illusion Panel Backlight Kit |
1 x | Electronic, Natural to Propane (SIT) |
2 x | Male Disc-fully Ins-25/pk |
1 x | HOT WATER COIL HDWR |
3 x | Self Adh Grommet-10ft/kit |
1 x | 12.2X17.1 MIRROR GLASS |
1 x | Glass for Firebox Door |
1 x | Tl3 Damper Arm Gear-sales |
7 x | Touch up paint firebox interior |
1 x | 83338 5/16-18 LOCK NUT 1 |
1 x | Small Shell Fireback / Cast Iron - Black |
1 x | Millivolt - NG to LP |
2 x | Length 1ft. |
1 x | COIL HOLE-SALES |
1 x | 200 High Limit Sensor - Manual Reset |
3 x | (892002) Door Handle, Spring – Gold 1 |
1 x | Fatwood Caddy Refill - 8 Lb Bag / Wood |
1 x | Glass Cleaner |
1 x | 83005 10-24X1/2 MS TR PH FL BLK 4 |
4 x | Hinge - Female Left 2 |
2 x | Bulk50-hcs 5mm X 8mm Z |
1 x | Brick Panel Base - Set |
2 x | 7" Sunburst - Cast Iron Trivet / Enamel Green |
1 x | Standard Tee |
1 x | SF2600 HEAT EXCH ASY-SALE |
1 x | Complete Door w/Glass |
1 x | Screens |
1 x | Bezel, Black Nickel |
2 x | Heat Activated On/Off Pre-wired Fan Kit 200 CFM 115V/60H/39W |
1 x | 83409 1/4-20 X 1/2 HEX BOLT 4 |
3 x | 5in Single Paddle Blade |
2 x | Glass Media, 5LB Bag, Goldfinger |
2 x | 3-Blade Fan WB & VF only |
3 x | Ceramic Magnet - Side Doors (Each) |
1 x | 90 DEG ELBOW-BRASS |
2 x | Starter Kit: for Wall or floor installations. Includes blower (B |
5 x | 4000w Tadpole Gskt-10 Ft |
2 x | Gasket-ceramic Insert Plt |
1 x | Conversion Kit, Millivolt, Natural to Propane |
1 x | Black Rustic |
3 x | ADC HINGE BIN |
1 x | Seal Plate-center Oakl |
1 x | Liner Kit, Black Paint |
1 x | Glass gasket |
8 x | Outside Air Kit Collar, Hood & 3' Flex for Floor Venting |
1 x | Ducks Fireback |
3 x | Brick 12 X 6 X 1-1/4 |
1 x | Porcelain Liner Kit, Black |
1 x | Green 2.5 Quart Cast Iron Humidifying Kettle |
6 x | Mag Door Latch-set Of 4 |
1 x | 10.031X12.313 MIRRORGLASS |
2 x | Pc45 Neutral Harness |
6 x | SHAKER HANDLE MOUNT-SALES |
5 x | Air Intake Gasket-set Of6 |
2 x | Ul Motor Mount W/grommet |
1 x | Door gasket |
5 x | Control Panel, Digital 1 |
1 x | Standard Electronic On/Off Remote Control Kit |
2 x | 7" Sunburst - Cast Iron Trivet / Enamel Black |
1 x | 32-1/2 X 44 WINGS-BLACK |
1 x | Chimney Brush Pull Ring |
1 x | 69837 DAMPER WELDMENT 1 |
2 x | 42" Mosaic Masonry™ Bi-Fold Door, Ebony Finish |
2 x | Strada Louver Kit |
1 x | Air Pump Filter & Fitting |
2 x | Gas Ng Pilot Complete-pse |
1 x | Pc45 Fdr Asy-sales |
1 x | Glass Cleaner & Conditioner |
1 x | Tea Pot Trivet - Blue |
1 x | Clean Out Covers |
1 x | BOSTON FPI CAST TOP |
1 x | 28" Non-Tapered Grate PC - Black |
2 x | Ul Cast Cam Block |
1 x | Tea Pot Trivet - Black |
1 x | 36" Standard Bi-Fold Glass Door, Platinum |
4 x | Door Hinge Pin 2 |
1 x | Proof of Fire Switch |
1 x | Oak Flue Collar Cover-sal |
1 x | Conversion Kit, Millivolt, Propane to Natural |
2 x | Novasit Regulator - LP |
2 x | 38/61/45 Door Trim-br Ss |
1 x | 3F Screen Deluxe |
1 x | Conversion Kit, Electronic Ignition, Propane to Natural |
2 x | Conversion Kit, Electronic Ignition, Natural to Propane |
2 x | Radiation Shield, 8" I.D. |
2 x | Fan Speed Controller Knob - White |
2 x | Burner Tube - NG/LP |
8 x | 4" Air Kit, Collar & Hood Only |
1 x | HB35 KNOTHOLE LOG |
1 x | Door - P22, P1000PW -Gold 1 |
1 x | 36" Standard Grate 20mm / PC - Black |
1 x | Blower-oakleaf Sales |
1 x | Ball Plunger - Bottom Louver (Each) |
1 x | Conversion Kit, Millivolt, Natural to Propane |
1 x | Royal Sun Fireback |
2 x | BRICK PANEL-LEFT |
8 x | Decorative Volcanic Stone |
1 x | Highliner, Decorative Accent Trim, Aged Silver |
1 x | Façade, Deco, Black |
1 x | Door Handle, Oak 1 |
1 x | 36" Perimeter Trim Kit - Black |
2 x | Fan Limit Switch |
1 x | False Top Assembly |
1 x | Ember Screen for 36" Grate / PC - Black |
2 x | Ash Pan – P23F on Pedestal 1 |
2 x | Flex 5" I.D. X 25' long |
4 x | Flex Compact Term w 48" compressed vent |
4 x | Flex Compact Term w 24" compressed vent |
1 x | Decorative Grill--Left Side |
1 x | 5/8" Dooor Gasket 7 Feet |
2 x | 306w/120v Ignitor 15 Fin |
1 x | Cabinet Side - Left |
1 x | 69707 Right Side Hopper Extension Assy. 1 |
3 x | 5/16x1/2 Ball Plunger-3pk |
1 x | Dual Arch Screen Kit |
2 x | Flex 5" I.D. X 15' long |
1 x | 1/4" X 1" Glass Screw (Each) |
1 x | Ignitor |
2 x | Front burner tube |
3 x | Flame Guide-38p/p61/100 |
1 x | Burn Pot Liner Ss High Ash GF55/GFI55 |
1 x | Vacuum Switch |
2 x | SHORT GRATE 13 IN-CAST |
1 x | 69872 Ash Plug 1 |
1 x | Cabinet Front Door Assembly |
4 x | GASKET-1/2 RD HD-20 FT |
1 x | 3/8 Od X 1/4 Oal-5 Pack |
1 x | Ash Cleanout Rod |
2 x | SHAKER HANDLE-PAINT-SALES |
2 x | Bulk50-sae Fw 5/16x11/16 |
2 x | Dielectric Grease (Packet) |
1 x | MAG LEG-PAINTED-SALES |
1 x | Glass Media, 5LB Bag, Reflective Blue |
2 x | Length 2ft. |
1 x | Glass Media, 5LB Bag, Disk, Sky |
2 x | Ash Pan – P23F on Legs 1 |
1 x | 4-1/2 X 8-1/2 RECT GLASS |
1 x | Door Handle |
1 x | 3.5 Sprocket W/hub-sales |
1 x | TL2/3 BLOWER-SALES |
4 x | Thermostatic Fan DV and VF units only |
1 x | Screens |
1 x | 1700 REAR SECONDARY AIR TUBE C |
1 x | 3F Screen |
1 x | Tl3 Damper Pivot Gear-2pk |
1 x | Venetian Tile |
1 x | Blue Black 2.5 Quart Cast Iron Humidifying Kettle |
1 x | Round 7" Trivet - Aubergine |
1 x | Andirons Solid Brass and Iron Swirl / Clear Lacquer |
1 x | Airwash Glass Spacer Set |
1 x | 83913 SPRING 2 |
1 x | 3-piece Trim Kit, Black |
4 x | Burner Orifice # 56 - LP - Front |
4 x | Manual Fan, Variable Speed |
1 x | Minuteman International W-Series Windsor Bifold Hearth Door |
1 x | # 34 burner orifice |
3 x | Gold Plated Knob |
2 x | SMALL FLUSH HYBRID-FYRE INSERT |
1 x | Ash pan weldment |
3 x | Wall Mount On/Off Switch Kit |
1 x | Outdoor Bi-Fold Door with Frame and Hoods, Brushed Stainless |
1 x | Proof of fire switch |
3 x | Damper Clamp (Required in vented applications.) |
1 x | Brick Clip (Each) |
1 x | Bottom Slide Rod |
2 x | PENDLETON STOVE 1994-2012 |
1 x | Handle Asy-oak |
5 x | 50 piece Bulk Outside Air Kit - Collar Only Kit |
1 x | Adv Latch Setup |
3 x | 5in Double Paddle Blade |
2 x | PENDLETON INSERT 1994-2012 |
1 x | Face Plate, Brushed Nickel |
2 x | FLUSH PLUS RECTANGULAR PERFECT FIT |
1 x | Standard Rope Design Poker - 28" L |
4 x | Floor Media Kit (Includes Lava Rock/Embers/Cinders) |
1 x | DVGIN XL NG CONV KIT-SALE |
1 x | Acc52i Side Pnl-maj Brown |
1 x | 160/260/360 SHAKER BRACKT |
2 x | CAMANO STOVE |
1 x | VF3K OIL BURNER OPTION |
1 x | 9mm X 13mm Tubing-5ft/kit |
2 x | Distribution Blower-fasco |
1 x | Auger motor |
5 x | Burn Pot/tailpipe Gaskets |
2 x | Shady Hollow, 36" VF Log, Concrete, 2/2 |
2 x | Control Board Knob Pkg-10 |
1 x | HB38 VALVE ASY-RV-NG-SALE |
1 x | 901 1987 |
4 x | Receiver and Touch Screen Remote Control Kit |
1 x | 1/4-20x1-1/2wingscrw-10pk |
1 x | 1/8 Inch Fiberglas 2 X 4 |
1 x | Shovel |
1 x | Encore |
1 x | Clean Face Panel Kit (Requires Gravity Kit) |
2 x | Southern Comfort 36", VF Logs, Concrete 2/2 |
1 x | Accin Side Pnl-paint-sale |
2 x | Boiler Coil Washer 2/pk |
2 x | 1in Single Ply-10 Ft/kit |
1 x | 100/105 Air Pump Bkt-sale |
1 x | Stacked Rust |
1 x | 32" Perimeter Trim - Platinum |
1 x | Coal Rake Weldment |
3 x | Thermostat Extension |
1 x | Ceramic Stack Black Tie |
1 x | 4 Sided Surround, Trimmable, 46" x 38" (for use with F3133 Full |
5 x | Black 12oz Spray-258h |
1 x | Halogen Bulb, 60w |
1 x | GASKET-3 X 1/8 FLAT-5 FT |
1 x | Pedestal with Ashpan - P23 1 |
1 x | Warm Red Full Herringbone |
1 x | HB38 TWIG |
1 x | Control Brd Label 61/sms |
2 x | 3/8in Str Flex Connectbin |
1 x | BOILER KIT ASY-SALES |
1 x | ORIFICE-LP-FEMALE-#60 |
2 x | Remote, Wireless Wall Mount, On/Off, Hi/Low, Electronic |
1 x | Variable Speed Cntrl W/of |
1 x | Sensor-smart scan |
1 x | HBF PILOT OPENING CVR-SAL |
2 x | 3-20-60906 Blade-3 Pack |
1 x | Telescopic Length, 8" I.D. (15" to 26") |
3 x | # 42 burner orifice |
1 x | Ivory Split Stacked |
4 x | Fitting Elbow 90 Degree (Located At Orifice End) |
1 x | (83529) Auger Pin 1 |
1 x | Glass, Side 1 |
1 x | Conversion Kit, Electronic, Natural to Propane |
2 x | Accessory Log Kit for Giant Timbers |
3 x | Decorative Ash Bed / Control Cover Kit |
1 x | TYPE C-20 DRAFT REGULATOR |
1 x | Conversion Kit Natural to Propane |
1 x | Hopper Lid - P24I 1 |
1 x | 30" Bison Mountain Log Set, Concrete |
2 x | Auger Cover Plate 1 |
1 x | Extra Long Rope Design Poker - 36" L |
2 x | Fem Disc-fully Ins-25/pk |
1 x | ORIFICE-NG-LP-FEMALE-#71 |
1 x | Window Trim, Side - P24I - Painted 1 |
1 x | Dvgin Xl Label Plate-sale |
1 x | Ash Cleanout Door 1 |
3 x | Outside Air Kit With Duct |
2 x | Ember/Lava/Vermiculite Package Complete |
1 x | Fan Access/Cover Plate |
3 x | Decorative Ash Bed / Control Cover Kit (Six Pack) |
1 x | Bulk100-close End Pop Rvt |
1 x | DVGIN XL LP CONVERSIN KIT |
1 x | Conversion Kit, Millivolt, Propane to Natural |
1 x | Adjustable Length, 8" I.D. (2" - 5") |
1 x | 6 Rpm Motor Cw |
3 x | Gas Appliance Installation Kit |
2 x | 3 Position Terminal Block |
3 x | Log Scraps, Floor Media Kit |
1 x | Ddm Replacement Cable Kit |
2 x | Damper Steel Hndl/scr-bni |
1 x | Dvgin Xl Snapdisc Control |
3 x | #12 Jack Chain - 2 Feet Required (Each) |
1 x | 50" Bi-Fold Door, Platinum |
2 x | Hinge - Male Left 2 |
3 x | D-shape Knob/shaft-25 Set |
1 x | VF3K HOPPER ASY |
1 x | Herringbone Rust |
2 x | Fan Speed Control Knob 99/00/01/02/03/04 |
1 x | Thermopile-for Both Pilot |
1 x | Ash door handle |
1 x | Acc52i Hopper Lid W/label |
2 x | Southern Comfort 30", VF Logs, Concrete 1/2 |
3 x | Log Scraps, Floor Media Kit |
1 x | 996 1990-1993 |
1 x | Auger Bushing Washer |
1 x | Paw Bolt 3/8 X 1-9/16 Mod |
2 x | Diagnostic Display Module |
1 x | Bottom Louver Bracket Restraint |
1 x | Herringbone Rust |
1 x | Door - P23, Gold 1 |
1 x | Acc52i Center Wing W/hdwr |
2 x | Handle Asy-sms,tl3,68,xxv |
1 x | Log Bracket Kit (required With Ceramic Log) |
1 x | 3/8 Od X 5/16 Oal-5 Pack |
1 x | Acc52i Left Wing W/hdwr |
1 x | Deluxe Brushed Stainless Hood Kit |
1 x | 29-1/2 x 42 1/2 Black |
1 x | wiring duct |
1 x | Adv/xxv Latch-set Of 2 |
2 x | Leg Kit with Ashpan- Gold - P23F 1 |
2 x | Cast Louver Hardware Package |
1 x | 8IN DIN RAIL |
1 x | ARBOR |
1 x | Buff Brick Liner Kit 35 |
1 x | Large Winterwarm |
2 x | Shady Hollow, 36" VF Log, Concrete, 1/2 |
1 x | Auger Weldment |
1 x | Mini Rope Design Poker - 18" L |
4 x | GASKET-5/8 CHANNEL-5 FT |
1 x | AUTO DRAFT CONTROL-SALES |
2 x | Southern Comfort 24", VF Logs, Concrete 1/2 |
1 x | 10 Rpm Motor |
2 x | NON-ELEC DRAFT CNTRL-SALE |
2 x | Embers - Bag |
3 x | Auger Stop Bracket 1 |
1 x | Manual reset high limit thermodisc |
1 x | PELLET FDR EXT SPRING |
1 x | Dvginxl Sealer Plate-sale |
1 x | Shepherd's Hook Hoe |
1 x | Shepherd's Hook Shovel |
1 x | Shepherd's Hook Brush |
1 x | CAM ASY-SALES |
3 x | Wall Mount T-Stat Control Kit |
1 x | ORIFICE-LP-FEMALE-#52 |
1 x | SF160 JCKT SIDE W/HOLE-SA |
1 x | Fan Assembly |
1 x | Acc52i Center Wing W/hdwr |
1 x | Proof of fire bracket |
1 x | Auger bushing washer |
1 x | Side Ash Pan |
4 x | Bulk-pnd In Stud 8-32x3/4 |
1 x | Log Set-Complete |
3 x | Junction Box Kit (Required with Blower) |
1 x | Face Plate, Nickel |
1 x | HB38 TV LP CONV PK-SALES |
3 x | Black Fireplace Hood |
1 x | Front Burner Tube-NG |
3 x | ELEMENT COVER WLDMNT-SALE |
1 x | 50" Mosaic Masonry™ Bi-Fold Door, Oiled Bronze Finish |
1 x | Firebox Canopy, Powder Coat |
1 x | Burn Pot Cleanout-sales |
1 x | Motor retainer bracket |
4 x | REPLACEMENT FOR WHITE-ROD |
1 x | Shepherd's Hook Tong |
2 x | 1450 Cfm Single-speed Blower |
1 x | Resolute Non-cat |
2 x | Warm Red Full Herringbone |
2 x | Stove Panel Bracket Kit |
1 x | Door - P23, Painted w/Trim 1 |
1 x | 450w Igniter W/instructs |
1 x | 42" Bi-Fold Door, Platinum |
1 x | Boiler Coil Plate-sales |
1 x | Louver, Brushed Nickel (For Cast Iron Top Only |
3 x | Cast Cam Block |
1 x | Conversion Kit, Electronic Ignition, Propane to Natural |
1 x | Bolt On Ash Dr Hinge-sale |
2 x | 260/360 SHAKER BAR-SALES |
1 x | LARGE FLUSH HYBRID-FYRE |
1 x | Tl300 Shoe Brick Gasket |
1 x | Door - P23, P1000PWA, Painted (PWA) 1 |
3 x | Safety Relief Valve |
1 x | Digital control board |
1 x | Glass fuse for digital board (5 amp) (5 pack) |
1 x | P61/p61a Burn Pot-sales |
2 x | NON-ELECTRIC BOILER KIT |
1 x | 42" Mosaic Masonry™ Bi-Fold Door, Oiled Bronze Finish |
1 x | 1638 Cfm 4-speed Blower |
1 x | Warm Red Full Herringbone |
1 x | FLUSH INSERT PERFECT FIT |
1 x | 33 x 42-1/2 Black |
1 x | Dvgin Xl Right Brickpanel |
1 x | SNAP DISC CONTROL-CERAMIC |
4 x | Thermostatic On/Off Remote Control Kit |
2 x | Southern Comfort 24", VF Logs, Concrete 2/2 |
1 x | 34 x 50 Black Trimmable |
1 x | Variable Speed Control for UZY5 |
1 x | 3 Speed Toggle Switch |
1 x | SET OF CUT BRICK FOR VF3K |
2 x | Pellet Fdr Cw Motor-4rpm |
2 x | Burner Orifice # 53 - LP |
1 x | Magnetic Catch - Pedestal Door |
1 x | Boiler Coil Assembly |
1 x | Hinge - Male Right 2 |
1 x | BOILER WATER PLATE WELDMT |
1 x | VF3K ASHCHMBR BAFFLE-SALE |
1 x | Center Ash Pan |
2 x | Warm Red Split Herringbone |
1 x | P38/p43 Ul Fdr Asy-sales |
2 x | LONG SHAKER HANDLE-SALES |
2 x | Pc45 Feeder Auger |
2 x | DIN RAIL END CLAMP |
1 x | FEED ADJUST TUBE-SALES |
1 x | Heat Exchange Tube Cleaning Rod 1 |
2 x | Flue Tube Cleaning Brush |
1 x | Ash Pan – P24F 1 |
1 x | OBO DOOR ASY-SALES |
1 x | Dvgin Xl Left Brick Panel |
2 x | Conversion Kit Propane to Natural |
1 x | 700 1987 |
1 x | Bottom Louver Stopper |
1 x | CONTROL PANEL STICKER |
2 x | Conversion Kit, Electronic Ignition, Propane to Natural |
1 x | RAINIER INSERT |
1 x | 4" Flex Adaptor |
1 x | HBF 8IN-6-5/8IN DECREASER |
1 x | Herringbone Rust |
4 x | Caution&danger Label-10ea |
1 x | Window Trim, Side - P24I - Brushed Nickel 1 |
1 x | Itt Replacement Pilot Assembly - NG/LP |
1 x | OLYMPIC INSERT |
1 x | Platinum Glowing Embers |
2 x | Convection Blower, with Gasket 1 |
1 x | Wiring harness |
1 x | 32" Vent-Free Firebox Black Porcelain Liners |
1 x | Fan Speed Control (Rheostat) 99/00/01/02/03/04 |
1 x | Acc52i Hpr Lid Latch Kit |
1 x | Iron Rail, Decorative Accent Trim, Aged Silver |
1 x | Acc52i Fdr Asy-sales |
1 x | Stacked Rust |
1 x | HBF 8IN OUTER STOVE ADAPT |
3 x | Bulk-1/4-20x5/8 Wingscrw |
1 x | Dvgin Xl Glass Frame-sale |
1 x | Vacuum switch |
2 x | Southern Comfort 36", VF Logs, Concrete 1/2 |
1 x | Acc52i Control Shld-sales |
2 x | Door Handle, Spring – Chrome 1 |
1 x | Intrepid Non-cat |
1 x | Sprocket Replacement Kit |
1 x | 17-1/2IN FLAPPER-SALES |
1 x | Blow Poker |
1 x | Outside Air Kit (4’’ I.D. x 10 ft. long insulated flex) |
1 x | 45 Ceramic Ins Plate-sale |
1 x | Speaker terminal-thermostat |
1 x | Well Wel11a-601r |
1 x | Wall mounted LCD manual and Thermostat Modes |
1 x | Mini Rope Design Shovel - 18" L |
6 x | Variable Speed with Wall Switch |
1 x | Frontier, Decorative Accent Trim, Aged Silver |
1 x | 42" Bi-Fold Door, Brushed Brass |
1 x | Auger Bushing – Top & Bottom, Brass (No Threads) 2 |
1 x | Dvgin Xl Low Voltage Harn |
1 x | Warm Red Split Herringbone |
1 x | Acc52i Cb Plate-sales |
1 x | Overlay for 80P30523-R control board |
1 x | THERMOCOUPLE PROBE W/NUT |
1 x | Blwr,exhaust,80cfm, 1000 |
1 x | Hopper Lid - P24F 1 |
1 x | ORIFICE-LP-FEMALE-#59 |
1 x | FEEDER MOTOR MOUNT-SALE |
1 x | Accin Therm Cable Lead 14 |
2 x | FUSE HOLDER |
1 x | Black End Caps |
1 x | Motor Mount Bracket Assembly |
1 x | SET OF CUT BRICK FORSF260 |
1 x | Del Sol Louver Kit |
1 x | CONTROLLER A350AA-2C |
1 x | 32" Vent-Free Firebox Vintage Fiber Liners |
1 x | Fan Cover Gasket |
1 x | Gravity Kit: 2 Elbows 90-Degree, 2 Telescopic Lengths, 2 Grill S |
1 x | Door - P24, Gold 1 |
3 x | Cleaning Tool 1 |
3 x | Draft Meter Assembly-sale |
1 x | # 49 burner orifice |
1 x | 33 x 49-1/2 Black |
1 x | SENSOR/A350 CONTROL |
1 x | Ivory Full Stacked |
2 x | Explosion Door Handle |
1 x | Flanged Bushing--Auger |
1 x | Sensor bypass switch |
1 x | Brick Clip (Each) |
1 x | ASH PAN-SALES |
2 x | PUSH BLOCK FEED IND HDWR |
1 x | 4 Piece Fireset Tools Black |
3 x | Burner Orifice # 54 - LP - Rear |
1 x | POWER SUPPLY Y350R-1C |
1 x | Vigilant Non-cat |
1 x | 18" Red Wood Mountain Log Set, Concrete |
1 x | Ivory Full Stacked |
1 x | Gold Knob W/screw |
1 x | Bulk100-rphms 10-32 X 3/8 |
2 x | BOILER BRICK ANGLES-4 SET |
1 x | Fan Cover |
2 x | 3-20-09302 Blade-pk Of 3 |
1 x | Tl3 Ash Door Latch Hdwr |
1 x | Slide-Out Bottom for Corn Pot |
1 x | Ceramic Stack Heritage Brown |
1 x | Hooper lid-button type |
2 x | Hinge Block (PWA/PCA & PCNA) 2 |
3 x | Caution Label-15 X 3 Blk |
1 x | Combustion fan (includes gasket) |
1 x | Terminal block |
2 x | Air Switch (use part # 80621) 1 |
1 x | Thermostat |
1 x | Acc52i L&r Side Hinges |
1 x | Ash Dump / Cast Iron |
1 x | Acc52i Cast Top W/gasket |
1 x | Bulk100-fhn 1/4-20 Z 5 |
1 x | Convection fan |
2 x | Highliner, Decorative Accent Trim, Aged Silver |
1 x | Resolute Acclaim |
1 x | Glass, Oval 1 |
1 x | Drain Pan |
1 x | 3/4 Pipe Thread Maledrain |
2 x | Southern Comfort 30", VF Logs, Concrete 2/2 |
1 x | Motor Retainer Bracket |
1 x | Compact Termination SV4.5 |
2 x | Stacked Rust |
1 x | Large Rope Design Fork |
1 x | Thermocouple-use W/s.i.t. |
2 x | 1/4 Silicone Tubing-5 Ft |
1 x | DVGIN XL LOG |
1 x | Conversion Kit, Electronic, Propane to Natural |
1 x | Acc52i Hpr Lid-maj Brown |
2 x | 6 Amp Fuse-set Of 5 |
1 x | Standard Rope Design Brush - 28" L |
1 x | 100/105 Hprlid Catch-sale |
1 x | 3/8" X 7" Gas Inlet Pipe |
1 x | Auger Weldment |
1 x | 32" Perimeter Trim Kit - Brushed Brass |
1 x | RAINIER STOVE |
1 x | Screwposts/washers-set 20 |
3 x | Cast Door Hinge With Pin |
1 x | BOILER ELECTRIC BACK UP |
3 x | Auger Motor (use part #80642) 1 |
1 x | Dvgin Xl Tubepan |
1 x | Defiant Non-cat |
1 x | GRATE HOLDER-SALES |
1 x | 3/8" X 10" Gas Inlet Pipe |
1 x | Door Handle Bolt 1/4-20 X 4 1/2" Hex |
1 x | FEEDER BODY-SALES |
1 x | OLYMPIC STOVE |
1 x | Acc52i Right Wing W/hdwr |
1 x | 50" Bi-Fold Door, Brushed Brass |
1 x | Motor Mount Bracket Assembly |
2 x | OBO COUPLING WDMNT-SALES |
1 x | Remote, On/Off, Hi/Low, Electronic |
1 x | Extra Long Rope Design Tongs - 36" L |
1 x | Combustion fan (must order gasket) |
1 x | Gas Lp Pilot Complete-pse |
1 x | Cast Faceplate Hardware Package |
1 x | Dvgin Xl Tailpipe Gasket |
1 x | COTTAGE |
1 x | Adv Glass Clip Set |
1 x | SF160 JACKET TOP-SALES |
1 x | 1in Two Ply-20 Ft/kit |
1 x | Power cord/terminal block bracket |
1 x | 24" Red Wood Mountain Log Set, Concrete |
1 x | SOLENOID-.530 MIL POWER |
1 x | OBO OIL/COAL BOX ASY-SALE |
1 x | Mini Rope Design Hoe - 18" L |
1 x | 1000 Cfm 3-speed Blower |
1 x | Esp Probe-red/red |
1 x | TIMER CONTROL BOX |
1 x | Black end caps |
1 x | Ojop Door Latch |
1 x | 18" Bison Mountain Log Set, Concrete |
1 x | Round Magnet-set Of 4 |
1 x | Shepherd's Hook Poker |
1 x | PUSHER ARM-SALES |
1 x | 5/8" Collar with Set Screw |
2 x | 1196 1990-1993 |
1 x | Comb Blwr Gasket-3 Pack |
1 x | 24" Bison Mountain Log Set, Concrete |
1 x | Elbow 45-Degree, 8" I.D. |
1 x | Coal Rake Rod |
1 x | BRUSH CHROME KNOB W/SCREW |
2 x | HB38 VALVE ASY-TV-NG-SALE |
1 x | On/Off Switch/Fan Switch - White |
2 x | 10 Amp Circuit Breaker |
1 x | Flanged Bushing--Auger |
1 x | BULK-PND IN STUD 8-32X3/4 |
3 x | Ivory Full Stacked |
1 x | Gas Conversion Kit Electronic Ignition - LP to NG |
1 x | Acc52i Right Wing W/hdwr |
1 x | ADC COVER-PAINTED-SALES |
1 x | 50" Bi-Fold Door, Black |
1 x | Multi-Fuel Burn Pot Weldment |
1 x | Fitting Elbow 90 Degree (Located At Orifice End) |
1 x | Mini Rope Design Brush - 18" L |
3 x | (891121) Air Switch Tube (Per Foot) 1 |
1 x | Ceramic Stack Old Town Red |
1 x | 30" Red Wood Mountain Log Set, Concrete |
1 x | STAGE MODULE S350AA-1C |
1 x | Gas Conversion Kit Electronic Ignition - NG to LP |
1 x | GASKET-3/16X5/8 FLAT-10FT |
1 x | Minuteman International S-Series Shaker Series Hearth Twin Door |
2 x | Door Extension Spring (Each) |
1 x | Oak/tl3 Ash Door Latch |
4 x | 1/2" X 18" Flex Line - Gas Inlet |
1 x | 50" Mosaic Masonry™ Bi-Fold Door, Pewter Finish |
1 x | 3/8x1/2 Silicone Psa-20ft |
1 x | Ivory Split Stacked |
1 x | Acc52i Mounting Frame |
1 x | Ash Door with Handle and Gasket |
1 x | SET OF CUT BRICK FORSF160 |
2 x | Pre-paint Aerosol Touch-u |
1 x | 3 GRATE HOLDER-CAST |
1 x | Heat Shield |
1 x | 3/4IN SQUARE PLUG BIN |
1 x | Derated Burner Orifice #40 - NG 99/00/01/02/03/04 |
1 x | Warm Red Split Herringbone |
1 x | 38/61/45 Door Trim-gold P |
1 x | Cast Faceplate Mounting Bracket Left |
1 x | Color Control Label |
1 x | 42" Bi-Fold Door, Black |
2 x | Burn Pot Cleanout Cover-2 |
1 x | Window Trim, Side - P24I - Gold 1 |
2 x | DVGIN XL FACE-BLACK |
1 x | Blower Motor Only |
1 x | Stainless Steel Outdoor Weather Cover |
1 x | Defiant 1910/1945 |
2 x | Cast Faceplate Mounting Bracket Right |
1 x | Hpr Switch Fdr Fitting-2 |
1 x | 5/8" Collar with Set Screw |
2 x | Ivory Split Stacked |
1 x | Extra Long Rope Design Brush - 36" L |
1 x | Hpr Muffler/fitting-1 Set |
1 x | AQUA TERM BLOCK BOX-SALES |
1 x | Duplex Receptacle - White |
1 x | Pellet Power Cords W/ends |
1 x | 29 x 49-1/2 Black |
2 x | Auger Biscuit, Octagon – Includes A-BUSHTOP & C-F-088 1 |
1 x | Elbow 90-Degree, 8" I.D. |
1 x | SF160 JCKT SIDE W/O HOLE- |
2 x | BEARING 3/8 ID X 1-1/8 OD |
1 x | Dvgin Xl Rear Brick Panel |
1 x | Ash Hoe |
1 x | Minuteman International M-Series Modern Studio Bifold Hearth Doo |
1 x | Extra Long Rope Design Shovel - 36" L |
2 x | MISSION |
1 x | Itt Thermopile |
2 x | Boiler Gasket-3/16 In Pt |
1 x | Press/temp Gauge-rear Mnt |
1 x | 2 Pair Twisted Cat 3 Cabl |
2 x | Conversion Kit, Electronic Ignition, Natural to Propane |
1 x | (891148) Handle – Pocket Pull For Hopper Lid 1 |
1 x | Accin Cast Heat Exch Cvr |
1 x | Ul Short Fd Cvr&gskt-2set |
1 x | Selected Small Parts with Similar Costs |
1 x | 12" Section Hi-Temp Double Wall Pipe Snap Lock |
2 x | Bearing 3/8 Id X 1-1/8 Od |
1 x | Bulk50-hcs 1/4-20x3/4 G8 |
1 x | 17.5" - 35.5" Section Flex Pipe |
1 x | 6.0 lb. Bag Smooth Glass Pebbles, Clear |
1 x | Non-ceramic Fill Plate-sa |
1 x | Coal Hod / Pellet Bucket - Small / PC - Black |
1 x | Hopper Lid - P1000 - Original Style 1 |
2 x | 90 degree Elbow - Galvanized |
1 x | Adjuster Kit |
1 x | Burner Tube - NG/LP |
1 x | VALVE ASY-NG-SALES |
1 x | BURNER SPRT BRKTS L & R 564SS SERVICE PARTS |
1 x | 61/45/68 Hopper Lid-sales |
1 x | Pellet - Coal Scuttle |
1 x | ROPED MAG LOAD DOOR-SALES |
1 x | Sensor bypass switch |
1 x | CONCEALMENT COVER, 564 GS SERVICE PARTS |
1 x | Bottom Slide Rod |
1 x | Nickel Plated Slide Spring Handle for Damper |
2 x | Burner Orifice #32 - NG 99/00/01/02/03/04 |
1 x | 18" Timber Oak Log Set, Ceramic Fiber |
1 x | MAG ASH DOOR-SALES |
1 x | Basement Vent Kit |
1 x | Fdr Slide Plate Asy-sales |
1 x | Glass, Center 1 |
1 x | Auger Weldment |
1 x | PILLOW BLOCK-3/4IN FLANGE |
1 x | 820 NOVA VALVE-PROPANE |
1 x | 1/4 Inch Flat washer |
1 x | Black Candelabra |
1 x | Adjustment Gear Assembly 99/00/01/02/03/04 |
1 x | Coastal Legs, Black |
1 x | Ignitor |
1 x | Door - P2700, Brushed Nickel 1 |
2 x | 3/8 ALUM S TUBE-SALES |
1 x | Glass, P1000PB 1 |
1 x | Control board (SCS) |
1 x | Pellet Scuttle / PC - Black |
1 x | Door Extension Spring |
1 x | Fem Term-vinyl Ins 25/pk |
1 x | Firestop Plate |
1 x | Bulk25-5/16-18 Wing Nut |
1 x | CNTRL PANEL, BASIC 864/564 GS2 |
1 x | Wiring duct |
1 x | LEFT SIDE ASY-SALES |
1 x | Oval Tub / Iron w/ Black |
1 x | Firestop Thimble Kit |
1 x | 48" Section Double Wall Pipe - Galvanized |
1 x | Traditional Spark Guard - 44" x 33" |
1 x | Pc45 Frnt Plate Lck-5 Pk |
1 x | Leveling Legs |
1 x | BLACK CLASSIC DOORKIT |
1 x | Terminal block |
2 x | 3/8 TRIM BAR-SALES |
1 x | Oval Tub w/ Wrought Iron Handles / Copper |
1 x | Shroud Leg Spacer Kit (for UL approval of field fab term covers) |
1 x | Bearing Retainer W/hdwr |
1 x | BRICK ANGLE-SALES |
1 x | HB38 TOP VENT NG CONVERSI |
1 x | 36" Vent-Free Firebox Vintage Fiber Liners |
1 x | CONV PARTS, NG 564SS GS2 SIT/PSE PILOT |
1 x | TOP-PAINTED-SALES |
1 x | Novasit Pilot Orifice - LP |
2 x | Glass U Clip - Flush Window (Each) |
1 x | LATCH ADJ-LEFT-SALE |
1 x | # 47 burner orifice |
1 x | NG to LP Conversion Kit |
1 x | Cam Latch – P2000, P2700 1 |
1 x | Conversion Kit, Millivolt, Natural to Propane |
1 x | Burn Pot-sales |
1 x | ASH PAN-SALES |
1 x | Louvers, Brushed Nickel |
2 x | Auger weldment |
1 x | Robertshaw Valve Only - LP |
1 x | Corner Vent Kit |
1 x | Steel Brick Kit |
1 x | Nickel Coil Door Handle |
1 x | Spring Latches W/hdwr (2) |
1 x | Combustion Package Cap |
3 x | Pilot Assy Ods Op Lp |
1 x | Nickel Cast Door Frame Only |
1 x | 36" Snorkel Termination - Galvanized |
1 x | Pc45 Auger Extension |
1 x | Handle Replacement Kit – P1000PCA/PCNA, P4000 1 |
1 x | Cold Air Kit (for Citadel II Only) |
1 x | BURNER PLATE-SALES |
1 x | Mineral Wool- 1 Oz |
1 x | 13-3/4 X 19 Lge Rectglass |
1 x | 38/45/61 Ld Door-sales |
1 x | HB38 ARCH OPENFACE |
1 x | Aqua Temp Sensor Cable |
1 x | 42" Outdoor Fireplace Panel Cover |
1 x | Accin/xxv Hinge Plate |
1 x | Clarity Burner Tube Set |
1 x | 26-1/2 x 48 Black |
1 x | SCREW-HCS5/16-18 X 1-1/4 |
1 x | Bulk100-hwhtcs10-24 X 1/2 |
1 x | Damper Kit |
1 x | 3-Way Gold Contact Switch 99/00/01/02/03/04 |
1 x | Black 2.2 qt Enamel Steamer - Lattice Top |
1 x | Bulk100-5/16 Ext Lockwshr |
1 x | Black Flush Glass Trim (Each) |
1 x | LP VALVE ASY-SALE |
1 x | Door - P2700, Gold - Complete 1 |
1 x | Vertical Restrictor - Galvanized |
1 x | Nickel Plated Large Spring Handle |
1 x | Conversion Kit, Millivolt, Propane to Natural |
1 x | 1" Clearance Firestop Spacer ( 1ea.) |
1 x | Decorative Face Trim, Aged Silver |
1 x | DVGIN FACE ONLY-SALES |
1 x | HB38 GAS BRIDGE-SALES |
1 x | Auger Bushing Washer |
1 x | Circulating Fan (KK0151) |
1 x | Anti-Draft Shield for Round Top Only |
1 x | Flame-Magik Color Crystals |
1 x | HB38 RV LP CONV PK-SALES |
1 x | Coal / Pellet Scoop / PC - Black |
1 x | Blower |
1 x | HB38 DUCT ASY-SALES |
1 x | Medallion Holder-sales |
1 x | Square Top with Slip Section - Black |
1 x | BRICK PANEL-REAR |
1 x | ASH DRAWER ASSEMBLY |
1 x | LATCH-LEFT-SALES |
1 x | Bulk50-hcs 3/8-16 X 1/2 |
1 x | Ash Deflector |
1 x | Stucco Flashing - For Use with HTS-58 |
1 x | Flanged Bushing--Auger |
1 x | COVER, RIVET (564 GS) w/4 MOUNTING RIVETS |
1 x | 42" Standard Bi-Fold Glass Door, Platinum finish |
1 x | PUSHER BLOCK ADJ ROD-2PER |
1 x | Bulk50-flng 1/4-20 X 1/2 |
1 x | Ignitor Ceramic Insulator |
1 x | BRICK BRACKET-SALES |
1 x | 2" Aluminum Flex Intake Air Tube (requires 22") |
1 x | Black Nickel Trim |
1 x | Panel, Right Side - P2700 1 |
1 x | Ul Fdr Snout Gasket-10 Pk |
1 x | Burnpot Insert – Replacement for A-S-BURNPOT28FS 1 |
1 x | Bulk50-flng 1/4-20 X 5/8 |
1 x | Overlay for Control Board |
1 x | Square Top with Slip Section |
2 x | 1/4" X 1" Glass Nutsert (Each) |
1 x | Conversion Kit, Electronic Ignition, Natural to Propane |
1 x | HB38 SPRING CLIP-SALES |
2 x | Room Sensor |
1 x | Gasket-pipe Stub |
1 x | Spark Guard Screen - 39 1/2"W x 29 1/2"H |
1 x | Louvers, Black |
1 x | Draft Hood Assembly |
1 x | Pellet Service Video (Pre-2004, on DVD) |
2 x | Bottom Black Louver Hinge (Each) |
1 x | Ignitor Tube Weldment |
1 x | Heat Exchange Baffle |
1 x | Millivolt, Propane to Natural |
1 x | 2600 SNAP SWITCH |
1 x | Door Handle |
1 x | Pc45 Comb Intake-sales |
1 x | Pc45 Pellet End Plate-3pk |
1 x | Ash Hole Cover Plate - Bottom |
1 x | Conversion Kit, Millivolt, Natural to Propane |
1 x | 3/4 X 2-7/16 Ext Spring |
1 x | Pc45 .125 Corn Grate-sale |
1 x | OIL GUN NOZZLE COVER-SALE |
1 x | Vinyl Siding Standoff - Galvanized |
1 x | P61/45 Hpr Heat Shld-sale |
1 x | Glass Clip |
1 x | MAG ROPED ASH DOOR-SALES |
1 x | Skytech 1001TH On/Off Fireplace Remote Control With Thermostat |
1 x | Ash Pan – Big E 1 |
1 x | ASH HOUSING ASSEMBLY |
1 x | ROPED DOOR-PNTD-SALES |
1 x | Ash Pan – P2700 1 |
1 x | BOX TRIM KEY SET |
1 x | 14" Snorkel Termination - Galvanized |
1 x | Video for Imperial Pellet Stove |
1 x | 42" Standard Bi-Fold Glass Door, Black finish |
1 x | 42" Drain Pan w/ 1" Stainless Decorative Face Ext. |
1 x | Door Latch (Each) |
1 x | 26-1/2 x 41 Black |
1 x | SLICK PIN-1 PAIR |
1 x | SCREW-HCS 5/16-18 X 1 |
1 x | Auger motor |
1 x | Glass fuse for digital board (5 amp) (5 pack) |
1 x | Base - Charcoal Grey |
1 x | Bulk50-shcs1/4-20 X 2-1/4 |
1 x | Dvgin Xl Air Plate-sales |
1 x | Burner Orifice # 50 - LP 99/00/01/02/03/04 |
1 x | 42" Louvered White Herringbone Refractory |
1 x | Horizontal Square Termination - Galvanized |
1 x | ASH PAN OPENING COVER |
1 x | Dvgin Lft Valve Door-sale |
1 x | Face Plate, Brushed Nickel |
1 x | ZC-SUPPRT-ML230 |
1 x | Galvanized Steel Tub: Oval / Galvanized Steel |
1 x | 54" Surround, Stainless Matte |
1 x | RIHT SIDE ASY-SALES |
1 x | 18" Section Hi-Temp Double Wall Pipe Snap Lock |
1 x | 33 x 48 Black Trimmable |
1 x | Coal Hod / Pellet Bucket - Large / PC - Black |
1 x | STNRD BLACK DOOR ASY |
1 x | Coal Rake Rod Assembly |
1 x | (181987) Ash Pan Knob - 2 1 |
1 x | Glass Media, 5LB Bag, Reflective Black |
1 x | Robertshaw Regulator - LP |
1 x | Door - P2700, Painted - Complete 1 |
1 x | Motor retainer bracket |
1 x | 18IN VALVE HARNESS |
1 x | Coal Rake Weldment |
1 x | BASE TRIM-SALES |
1 x | Face Plate, Nickel |
1 x | Pc45 Circ Brd Plate-sales |
1 x | Pedestal Ash Drawer Kit |
1 x | Ashlip - Timberline Brown |
1 x | 26.5" - 62.5" Section Flex Pipe |
1 x | 42" Louvered Insulated White Stacked Refractory |
1 x | 61/68 Upr Mtr Cvr-pntd-sa |
1 x | Storm Collar (1 ea.) |
1 x | Front Control Panel Decal 99/00/01/02/03/04 |
1 x | 31 x 48 Black |
1 x | Rooster Trivet - Blue |
1 x | 45/61/68 Snout-sales |
1 x | MOTOR COVER-PAINTED-SALES |
1 x | 18" Scarlet Oak Logs Set, Concrete |
1 x | SNGLE BLK CLASSIC DOORKIT |
1 x | LATCH ADJ-RGHT-SALE |
1 x | 42" Outdoor Bi-Fold Glass Door, Platinum Finish |
1 x | Black Reflective Porcelain Liner 40 |
1 x | Service Video |
1 x | 12 X 6 Tile Frame-brsh Ss |
1 x | Panel, Rear - P23F 1 |
1 x | Cathedral Ceiling Support |
1 x | Auger Motor Mount Assembly, York/Afton Bay/Prescott |
1 x | Gold Cleaner |
1 x | Round 7" Trivet - Blue |
1 x | Black Candelabra |
1 x | INSTRUCTION MANUAL |
1 x | Bracket Hinge |
1 x | Roof Flashing - 6/12 to 12/12 Pitch - Galvanized |
1 x | Fireplace Insert Insulation (KK0111) |
1 x | BEARING 3/8 ID X 1-1/8 OD |
1 x | Heat Exchange Tube Cleaning Rod - P2700 1 |
1 x | Combustion Fan Housing Gasket (motor to housing) |
|
$260,314.61 |
Shipping Charges |