$0.00

Novasit Thermocouple 33.5 Inch Long Lead
[910-588]

Novasit Thermocouple 33.5 Inch Long Lead
Novasit Thermocouple 33.5 Inch Long Lead
Call Us on 860-774-6100 if you require this part. Reviews
Manufacturers
Live Help

Available 9am-4pm
Search
 
Use keywords to find the product you are looking for.
Advanced Search
1 x 27 NAPOLEON LOGO
1 x 22 INCH DRAWER SLIDES (SET OF 2)
1 x 16 POWER CORD
1 x Grate Weldment
4 x Brick Clip (Each)
1 x DIRECT-TEMP 12" ADJ PIPE LENGTH
1 x CONVECTION FAN
1 x VALVE REGULATOR, LP SIT#   S.I.T. 907.204
1 x ASH PAN OPENING COVER
1 x 380/M380 - 1982
1 x 7 PORCELAIN BURNER BASE
1 x 11 PROFLAME 2 REMOTE
1 x MAGNETIC DOOR CATCH
2 x AUGER MOTOR, ALL PS/PI#   EXCEPT 93-96 PI/AGP PS/PI
1 x LIGHT BULB, HALOGEN 5PK#   35watt, T4, 120volts, 380 Lumen
1 x CONTROL COVER PANEL
1 x Burn Pot Cleanout Cover-2
1 x Handle Sprg-plshd Nickel-
1 x MAGNETIC LATCH W/BRACKET
1 x Instruction Manual
1 x INJECTOR, PILOT - NG (#62)#   USE w/SIT PILOT ONLY
1 x Esp Probe-red/red
1 x 7/8" Door Gasket Repair Kit
1 x PRES RELIEF DOOR w/ GSKT #   MULTIPLE GAS UNITS 1997 +
1 x Door Glass Roped(s10034)d
1 x Stove Base - Slate Blue - Original
1 x N/S : EXHAUST PIPE ASSEMBLY
2 x Fan Thermodisc (60T12) 110 Degree
1 x Inv Handle Asy
1 x FASTENER - SCW BLACK 6 PK   PHPSMS, #8 x 3/8"
1 x N/S : STANDOFFS/SPACERS-TOP
1 x MANUAL, DVL-GSR2 NB 2013
1 x Auger Gasket
2 x FLEX PIPE, 3/8"od x 12 BLK   NO FITTINGS
1 x Touch Up Paint - Timberline Brown
1 x GRMT/SPACER (4) - BLOWER#   1997+ PEL/1995+ GAS
1 x 18* Rear Log #2
1 x REMOTE, BLK WALL-MOUNT#   ALL GS/GSR/GSR2 MODELS
1 x Replacement Glass
2 x Flame Guide-38p/p61/100
1 x Gold Plated Knob
1 x Ash Pan Front Painted E
1 x 5DT TO 4DT REDUCER
1 x Side Cast Assembly Lh
1 x D-shape Knob/shaft-25 Set
1 x 12" Chimney Pipe (black)
4 x Fitting Elbow 90 Degree Forged (Valve Outlet End)
1 x 12 : DOOR LEFT - CLASSIC BLACK
1 x PILOT ORIFICE, LP - 0.014 PSE#   PSE PILOT ASSY
1 x Glass Replacement
1 x FLEX PIPE, 3/8"od x 6" BLK   SERVICE PART
1 x E20/SONNET VALVE COVER C/W GASKET
1 x Door Assembly Bm
1 x PAINT, METALLIC BLACK 3oz#   SPRAY CAN
1 x DOOR, HINGE PIN RETROFIT, BLK#   2-PK, FS/INS
1 x Pellet Comb Blower
2 x Starter Collar Assy
1 x ASH DOOR ASY-SALES
1 x VALVE, NG - S.I.T. (3.5-1.6)#   S.I.T. 820.704
1 x Motor Retainer Bracket
6 x Spark Generator Switch - Comes With Wire
6 x Robertshaw Thermopile
1 x LOG, LEFT TWIG (TOP) - LS23#
1 x WIRE HRNS, BLWR CTRL, GS   21/TOL/BRK/EDN/NOR
2 x 3/16 Rd Blk Ld Psa-10 Ft
1 x BRICK-CUT, 9 x 3 x 1-1/8   ANGLE CUT BRICK
3 x 5in Double Paddle Blade
1 x BRICK, SET OF 8, FULL SIZE*
1 x BRICK-WHOLE,9 x 4-1/2 x 1-1/4#   STANDARD FIREBRICK
1 x Duplex Receptacle - White
1 x BEARING 3/8 ID X 1-1/8 OD
2 x N/S : VALVE-ELECTRONIC IGNITION LP
1 x Feeder Kit -2
1 x PANEL, FL WD MD 1PC 30.5x42*
1 x VENT SLIDER ASS'Y, DVL INS   2005/GSR/33
1 x PILOT HOOD,2-WAY, S.I.T - GS#   STANDARD GS PILOT HOOD
1 x Grate Assy Painted
2 x BRICK-CUT, ANGLE CUT   9 x 2.5 x 0.665 x 2.830
1 x VENT, WOOD ZC LINER KIT 25*   810007151
1 x Firebrick- Lt Side
2 x 1/8 Silicone Tubing-5 Ft
1 x PANEL, DVS II 4 x 6*
2 x On/Off Switch/Fan Switch - White
1 x Center Glass
1 x FASTENER - SCW 25 PK   HWSHSMS,#8 x 3/8" TYPE B
1 x 80472 Distribution Blower 1
1 x Transflo Blower - Motor Only
1 x TOOL (PULL), LPI w/SPRNG HNDL#   BYPASS PULL TOOL
1 x AIR CNTRL, EXTN ROD - UNIV#   4" X 3/8" FWI & FWP
1 x Pressure Relief Plate Bottom Gasket
1 x RUBBER MOTOR STOP - 2-PK#   ALL PELLET - 1990 to PRESENT
1 x AIRTUBE KIT, L-23 FWI#   FLUSH WOOD INSERT
1 x AIRTUBE KIT, L-13 ANS/ANS-NT#   #39271, PAT #5001 & 1250/CMNO
1 x SNAP-DISC, 5/8" w/BRACKET#   WOOD - AVA FRONT, UNIVRSL REAR
1 x Pellet Air Intake-sales
1 x Rear Access Panel for CPM
1 x HANDLE, HOPPER LID - 90-96 PS   (FLUSH) 90-1301 - 1990-96
1 x HINGE KIT, DOOR - FWP/LFW   TOP/BOTTOM w/ fasteners
1 x ADJUSTABLE ROOF FLASHING FOR 24/12 TO 36/12 PITCH
1 x CONTROL PANEL, DVS/DVL INSERT,   DVL ZC ('03)
1 x Tl3 Linkage Hardware
2 x Grate Assy Br36 Service
1 x N/S : SHELF BRACKET - BISCUIT
1 x Mhh 41 Wide Dv F/p Nat M
1 x Log #6, 400dvkhl
1 x WIRE HRNS, BLOWER (ver 1)   FAN KIT GS/GSR INSTS, 564/864
1 x STEPPER MOTOR, NG GS2 4-PK#   1.6"-3.5" WC
1 x WIRING KIT, INSERTS*   GAS OR PELLET
1 x SET-SCREWS, 3n1 DOOR KIT#   SET OF (2) 1/4-20 x7/16
1 x Feeder Crossover Tube Kit
1 x PSE THERMOCOUPLE WIRES (SET 2)
1 x Pilot Sit Elec Lp #35 Top
1 x Mtr Brkt Grommets/spacers
1 x REPLACEMENT BLOWER - AUB
2 x Gasket, Fuel Dump 1
1 x E20/30 CONTROL PANEL KNOBS (SET 2)
2 x Hpr Switch Fdr Fitting-2
1 x N/S : SWITCH COVER PLATE
1 x N/S : TAVERN BROWN LARGE FLOOR
1 x Replacement Glass - Flush Front (Size: 38 5/16"W X 21 1/8" H)
1 x HW PACK, LEVELING BOLTS (2)   3/8-16 x 1-1/2"
1 x P68 Hpr Heat Shield-sales
1 x Left Side Brick Service
1 x Glass Clip - Bottom Edge
1 x Glass, P1000PB 1
1 x Glass Clips & Hdwr-1 Set
1 x LEVELING BOLT COVER, WD INSERT   VARIOUS INSERTS - 2-PK
1 x PAINT, METALLIC BLACK 3oz#   SPRAY CAN
1 x GRATE INSERT
5 x N/S : WIRE - VALVE TO CONROL BOARD
2 x Novasit Electrode - Short
2 x Lens, Orange Reflective,
1 x BURNER, RMA RETURN REQUIRED   1996-00, PAN ONLY - 40K
2 x FRBK MEDIA TRAY REAR 564 DF   PAINTED BLACK
2 x N/S : GASKET-PRESSURE RELIEF
1 x VENT, WD MASONRY LINER KIT 25*   810001929
1 x EG31 BV DRAFT HOOD CONNECTOR
1 x Retainer, Lens, Kstdv500
1 x 6 Rpm Motor Cw
1 x Duplex Receptacle Box
1 x BAFFLE REAR (FWP)#   12 GA 304 SS - 24.575 X 10.843
1 x 68/35 Mod Trim-brush Ss
1 x DISCONTINUED - FACE, SEATTLE ROSARIO BLACK*   564 NO SCREEN UNIT
1 x Burner Kit 30sp-rem-lp
2 x Novasit Pilot Orifice - LP
1 x DOOR, HINGE PINS, BLACK#   2-PK, FS/INS
5 x Pressure Relief Top Frame Gasket (Each)
3 x Spark Generator Battery Holder
1 x Adv/61a/acc/68/xxv Harnes
1 x Bottom Full Screen Flush Louver
1 x NIPPLE, BARBED (PELLET)#
1 x Right Side Brick Service
1 x WIRE HRNS, SIT GSR INSERT#   SERVICE PART
1 x 6 : PORCELAIN RIGHT PANEL
2 x Novasit Regulator - LP
1 x Rp199 Replacement Damper
1 x Grate Painted Assy Serv
1 x Touch Screen Hand Held Transmitter With On/off, Hi/med/low Flame
1 x 38/45/61/68 Retr Asy-sale
1 x Handle Mount Plate
1 x BRICK-WHOLE,9 x 4-1/2 x 1-1/4#   STANDARD FIREBRICK
1 x N/S : TAVERN BROWN SMALL FLOOR
2 x Novasit Valve Assembly - LP
1 x Nickel Coil
1 x Brick-back Br36 Service
1 x Door Assy
1 x 2 : DAMPER BRACKET
1 x Digital Control Board
1 x 6 Amp Fuse-set Of 5
1 x 3/8 Od X 1/4 Oal-5 Pack
2 x Burner Tube - NG/LP
1 x SNAP-DISC - 120deg NO#   WOODSTOVE & INSERT
1 x Wall Switch Kit, On/Off, White
3 x 15 : VALVE-MILLIVOLT CONTROL NG
1 x 4 CONTROL MODULE
1 x 5/8" Door Gasket Rope (80")
1 x 2 : INJECTOR LP 1.45
2 x Bulk-1/4-20x5/8 Wingscrw
1 x 5/8" Collar with Set Screw
5 x 16 : KNOB EXT ON/OFF-MILLIVOLT CONTROL
1 x Wall Firestop - Galvanized
2 x 10 : GAS VALVE ASSEMBLY - NG
1 x 0.5* Trim Srv Sc Trinity
1 x Switch Panel Maxitrol
2 x N/S : COTTAGE CLAY LARGE FLOOR
1 x Grate Assembly
7 x Latch Assy Bdv/dvb Servic
1 x Junction Box Kit (Required with Blower)
2 x Harness - Wiring Male
1 x #2-24 Only Side Support L
1 x .125 Orifice, Style C
1 x N/S : CANOPY(LONG)
1 x 2a : PILOT - SIGNATURE COMMAND LP
1 x 4DT-CCKA CHIM CONV. KIT A
1 x Form Bracket Firebrick 62
2 x 22 : WIRE HARNESS FEMALE-MILLIVOLT CONTROL
1 x (90 Deg) Burner Tube
6 x N/S : LAVA ROCK
1 x Itt Replacement Pilot Assembly - NG/LP
2 x N/S : GASKET-EXHAUST BOX
1 x Manifold Tube Set
1 x 10 PILOT GASKET
1 x 6 BATTERY BACK UP
1 x Assy Glass Long Corner 62
1 x 3 PILOT ORIFICE LP
1 x PILOT ORIFICE (INJECTOR) LP THREADED (POST 10/00)
1 x Assy Louver Bottom Servi
1 x Trim, 50* All Plt
1 x Front Burner Tube-NG
2 x 1/2 Pillow Block-4 Pack
1 x 15 VALVE BRACKET (X2)
1 x Hood, Deflector Bdv300
1 x Touch up paint powder coat exterior
1 x BAFFLE BOARD, 2 PC.   NEXGEN FWL
1 x Remote, 36* Wall Mount
4 x Gasket 6 Pipe Adapter 62
2 x 13 : COMMAND CENTER
1 x 3-20-60906 Blade-3 Pack
1 x BLACK LOUVRES (5L & MOUNTING BRACKET) DV36
1 x BOSTON 1200 FS CAST TOP-PD
1 x 4X3 TEE W/TEE CAP
1 x Echelon See-thru Stainless Steel Outdoor Glass Facing Kit. (must
1 x N/S : LOG SET
1 x 16 : INJECTOR 1.28mm - LP
2 x Blower Magnets
1 x OWNERS MANUAL DV36
1 x Small Front Log, #7 Mldv
1 x Convection fan
1 x Black End Caps
1 x 11 COMPLETE PILOT ASSEMBLY NG
1 x Wall Timer Switch
1 x BOSTON FPI CAST BASE (LEFT)
1 x Log Set
2 x 9 : BURNER INJECTOR NG 41
1 x 1500/2500 KIT ASY-SALES
2 x Nailing Flange Bag
1 x N/S : BLACK TRIM LEFT
1 x Andirons Bolt-on
1 x 22 : COTTAGE RED FIREBRICK-LEFT SIDE
1 x Derated Burner Orifice #52 - LP 99/00/01/02/03/04
1 x N/S : WIRE CONNECTOR 24IN.-ELECTRONIC IGNITION
1 x Decorative Rivet - Antique Gold (Each)
1 x 9 : GLASS ASSEMBLY SHORT 90 DEGREES INSIDE CORNER
1 x Wire Harness High Temp As
3 x Embers - Bag
2 x 18 : PILOT ASSEMBLY-MILLIVOLT CONTROL LP
1 x N/S : 1IN. STANDOFF ON REAR
2 x N/S : CONTROL BOARD- SIGNATURE COMMAND NG
1 x Bulk100-fhn 5/16-18 Z 5
2 x Washer # 4 (Magnet Holder)
2 x 1 : PIEZO IGNITOR
1 x 7b : FRONT INJECTOR LP No. 54
3 x Restrictor Plate Exhaust
1 x N/S : BACK LOG
1 x 9B : VALVE UV SIT 820.636 RP
1 x 3/16 Pilot Tube Cut Into
5 x # 37 burner orifice
1 x 135CFM BLOWER-22 IN CORD
1 x 1 : DAMPER WELD ASSEMBLY
2 x N/S : SPEED CONTROL W/KNOB
1 x Brass Tee, 5/16comp.x1/4
1 x N/S : BURNER - NATURAL
1 x Face Assy, Bdv400/400dvb
1 x Tavern Brown Firebrick Walls And Hearthbrick For Bldv300
1 x Injector #44 (ref 37d0340
1 x HB35 ARCH OPENFACE
1 x Novasit Pilot Assembly - LP
1 x Stepper Kit 820 Ng-3.5
1 x N/S : IGNITION MODULE-ELECTRONIC IGNITION.
6 x 5/32" Allen key
1 x Tube 5/16 Bldv400sc Vlv-b
1 x Log #6, Khldv500 Service
1 x Door Frame Assembly - C/W Glass
1 x Log #1, Khldv500 Servi
2 x N/S : LOG, RIGHT TWIG
1 x 36 : VB FIREBRICK-HEARTH RIGHT
3 x Door Extension Spring (Each)
1 x N/S : GASKET-8IN. PIPE AIRBOX COVER
1 x 2a : THERMOPILE
1 x N/S : WIRE HARNESS
1 x Burner Assy Common 624
1 x Pullscreen Khldv600
1 x Lp Sit Field Conv. Pilot
2 x Fitting Elbow 90 Degree (Located At Orifice End)
1 x 1/2" X 18" Flex Line - Gas Inlet
1 x COMBUSTION AIR COVER
1 x N/S : TOP BRICK RETAINER
1 x 11-1/8X14-3/8 RECT GLASS
1 x Log #7, Khldv500 Servic
1 x 10-2131-18 Ss Flex Hose
1 x 7" PLATE/COVER
1 x Ojop Door Latch
1 x N/S : NAILING FLANGE BAG
1 x Fan Speed Control Knob 99/00/01/02/03/04
3 x Piezo Igniter
1 x N/S : TUBE-VALVE/TEE
1 x Pilot Ods Tp Op# 8402
1 x 2L : LOG NO.2
1 x Robertshaw Regulator - NG
1 x ELECTRODE (w/wire) (SIT Pilot assembly only)
1 x 9A : VALVE UV SIT 820.637 RN
3 x Blower Wire Harness 6ft
2 x N/S : EXHAUST PIPE GASKET
1 x Burner Orifice # 53 - LP
1 x Double Gang Box Grey
2 x Blo Service Kit
1 x Bulk50-flng 1/4-20 X 1/2
6 x Novasit Pilot orifice
1 x 12-7/16 X 17-5/8 GLASS
1 x N/S : ROCKWOOL
1 x 15 : FLEX HOSE W/SHUT-OFF VALVE
1 x Bulk25-ssscp5/16-18 X 3/8
1 x Exhaust Gasket, 6.5 X 5.2
1 x N/S : WIRE ASSEMBLY-ELECTRONIC IGNITION.
1 x Complete Door w/Glass
1 x 1 : BRICK FILLER (4 PER F/P)
1 x 1500 JACKET TOP-SALES
1 x N/S : BLOWER VELCRO PADS
1 x Restrictor Disc For 5 Pi
1 x Left Mid Cross Log, #5 Ml
1 x GSKT, DOOR 7/8" x 50' BLACK#   ROPE - MISC. GAS/WOOD/PELLET
1 x FACE, 864 RECT BEVEL BLK*
1 x Clip Glass-def 02
1 x FIREBACK, DVS HANDMADE BRICK*
2 x LOG, REAR - LS60 (#1)#   430 TRADITIONAL
1 x BLOWER, LT, GAS INS - 2005+ #   EF-II/DVS/DVL/31/33
3 x Snap Disk Bracket Form
1 x FRBK BLOCKOFF, LT/RT#
1 x Log Set - Complete
1 x Spring Handle for 3/8" Handle
1 x ORIFICE MANIFOLD BASE, NG ONLY   31 DVI/DVS GSR/564 HO
1 x PILOT BRKT - UNIVERSAL   PSE PILOT ASS'Y
1 x PILOT TUBE, 36" - PB LINEAR   PROBUILDER LINEAR MV/GSB2/GSR2
1 x HW PACK, PANEL - MOUNTING HW#   SCREWS & NUTS - UNIVERSAL
1 x CONV PARTS, NG - RS/SIT   DVSZC/INSERT 2001-05
1 x ORIFICE, PILOT - NG (.021)#   ALL 93 & UP GAS w/RS PILOT ASY
1 x HW PACK, PANEL - MOUNTING HW#   SCREWS & NUTS - UNIVERSAL
1 x VENT, 8" MINIMUM KIT E*   810006773
1 x FIREBACK, DVL INS BRICK/HERR*
1 x AIR INLET w/ GSKT & FASTENERS   PRIMARY AIR INLET - ROCKPORT
1 x GSKT, PILOT ASSY, GS#   ALL GREENSMART UNITS
1 x VALVE REGULATOR, LP SIT#   S.I.T. 907.204
1 x HEAT SHIELD 564   FOR REAR VENT APPLICATIONS
1 x FACE, 430 RECT BEVEL BLK SCR*
1 x DAMPER BLOCK OFF COVER (1)   w/ FASTENERS
1 x GRILL, 564 FPX BLACK*
1 x ELECTRICAL BOX w/ CVR PLATE   UNIVERSAL
1 x Firebrick, Front, Bldv400
1 x Latch Bolt & Rollers c/w Nut
2 x PIPE ADAPTER, 3/8 FLARE x3/8M   3/8 FLARE x 3/8 MPT - 1/4 FPT
2 x FLEX PIPE, 3/8"od x8" BLK   NO-FITTINGS
1 x FIREBACK, 616 PAINTED BLACK*
1 x FIREBACK, 430 BRICK/HERR*
1 x Wheel - Mntplr
1 x Thermostat - Low Voltage
1 x TRIM KIT, 564CF 1/2"-7/8" BLK*
1 x 28 : 7/64 X 5/8IN COTTER PIN
2 x Duplex Receptacle Box Cover
1 x BRICK-WHOLE,9 x 4-1/2 x 1-1/4#   STANDARD FIREBRICK
1 x FLUE ADAPTER, DV 8" TO 6-5/8"*   810004994
1 x GLASS SPRING LATCH - XTREME   COMPLETE
1 x Flue Adaptor Assembly
1 x FUSE, 5 AMP - 5-PK#   GS FAN MODULE-250v
1 x Fan Kit Assembly-montpeli
1 x ASHLIP TRIM, SET SCREWS - 10pk#
1 x SWITCH, COMFORT CNTRL / GS#   DBL POLE
1 x SWITCH, ROCKER - SINGLE POLE#   WHITE
1 x BURNER ASS'Y, TUBE - REAR   864TRV (2005 - 2010)
1 x PAINT, METALLIC BLACK 3oz#   SPRAY CAN
1 x STUD PLATE (564/864)#   SS/DF/TRV/HO/ST
1 x FIREBACK, DVL LEDGESTONE*
1 x Bottom Full Screen Flush Louver
1 x 7 : SPRING, FRICTION
1 x FASTENER - HEX NUT 10-24 5PK   CENTER-LOCK w/ WASHERS
1 x BURNER, PINS - 5/16" x 1" (2)   EF BURNERS - 2000-08
1 x Flush Glass Screws 10-24 X 1/2" (Each)
2 x GRATE, IRON 864TRV/HH/ST   SERVICE PART
1 x Replacement Glass
1 x LOG, LEFT TWIG (TOP-5) - LS5 #   44 DVXXL 1999 - 2003
1 x ORIFICE, PILOT - NG (.021)#   ALL 93 & UP GAS w/RS PILOT ASY
1 x RESTRICTOR, INTAKE - 564   GS2/GSR2 - SS-DF-DLX
1 x BURNER ASS'Y, REAR - 36 CF   ARCH/RECT MODELS
1 x Frm Face Panel Bdv400 + D
1 x Tube A, Sec Air - Mntplr
1 x BRKT, BOTTOM, FACE-564   SET OF 2 - 564/864 ARCH/RECT
1 x ANDIRON, TRADITIONAL RING*   564 SS
1 x CNTRL MODULE, REMOTE FUNCTN#   GSR2 MODELS
2 x #12 Jack Chain - 2 Feet Required (Each)
1 x CONV PARTS, NG - DVLGSR2#   NO BURNER - GSR2
1 x LOG, FRONT (CHUNK)(#2) LS43#
1 x INJECTOR, PILOT - NG (#62)#   USE w/SIT PILOT ONLY
1 x PILOT ELECTRODE, 36" - PSE   PILOT FLAME SENSOR - PSE ONLY
1 x LEVELING BOLT[4], STEEL/PWR LEG#   w/RUBBER TIP - 3/8-16x1.5"
1 x Door Mounting Bracket Antique Gold Left - Double Door
1 x Remote, T-Stat, Alternating Current, RCVR
2 x GLASS w/GASKET - 864 HH/HO   SERVICE PART
1 x SHUT-OFF VALVE#   VARIOUS GAS UNITS
1 x PILOT, RETRO KIT - PSE 3-WY#   CYP/33DVI/DVL/864HO
1 x LOG SET, FPL 36 564 DLX BIRCH*   36 CF, 564CF & 564 GSR2
2 x BRICK RETAINER (2) w/SCW#   UNIVERSAL PART
1 x Silicone Hose ( Black)
1 x BLOWER POWER CORD, w/RHEOSTAT#   UNI REAR/LPI FRT, NO FL/FR BAY
1 x GLASS w/GASKET - 864 TRV/ST#   TEMPERED GLASS
1 x COVER, RIVET (564 GS)   w/4 MOUNTING RIVETS
2 x Round Magnet - Screen Door (Each)
6 x Electrode Igniter W/cable
2 x ELBOW, 3/8 NPT to 3/8 FLARE#   90 DEGREE - VARIOUS GAS UNITS
1 x ORIFICE, BURNER - No. 56#   1.180" BRASS HEX (.0465 dia)
1 x LOG, RIGHT - LS80 (#5)#   CLASSIC OAK 8-PIECE
1 x HW PACK, REMOTE - MOD LP GS   SERVICE PART
1 x FIREBACK, 864 ST BRICK/HERR*   SEE THROUGH
1 x BLOWER MOUNT BRACKET   44DVXXL
3 x Glass U Clip - Flush Window (Each)
1 x Thermodisc Bracket 99/00/01/02/03/04
1 x BLOWER ASSY RT - 864/564#   FAN KITS 99000156/99000162
1 x TRIM KIT, 564CF 1"-1 1/2" BLK*
1 x CNTRL MODULE, REMOTE FUNCTN#   GSR2 MODELS
1 x 6 : CS, HEX HD 1/4-20 X 3/4IN GR5-BLK
1 x 50 : 1/4-20 X 1/4IN ALLEN SET SCREW
1 x INJECTOR, PILOT - LP (#35) #   USE w/SIT PILOT ONLY
1 x Side Heat Shields for 15-SSW01
1 x PILOT ELECTRODE - SIT#   SENSING ELECTRODE - SIT PILOT
1 x LOG, MAIN (CENTER) - LS31#
1 x FUSE HOLDER- GS2 #   NO FUSE
1 x PILOT BRKT, PB42/54 LINR   PROBUILDER LINEAR MDLS
1 x PRES RELIEF DOOR w/ GSKT #   MULTIPLE GAS UNITS 1997 +
1 x SCREEN FRAME ASSY, 564#   SS/DF/DLX/HO/CF2
1 x Kanban Engine Contemp Ng
1 x FASTENER, NUT, KEPS 6-32   10-PK
1 x SPACER, 1/4 dia. x .312 - BLK   4 PACK - VARIOUS UNITS
1 x ASHLIP TRIM, BRS, LOPI SM/MD#   WOOD, 1990-96 PS, 19" WIDE
1 x GSKT ROPE, 7/8" dia - BLK 56"#   VARIOUS MODELS
1 x LOG, TOP RIGHT - LS52 (#5)#   (2011)
1 x FACE, 864 ARCH FR COUNTRY BLK*
1 x MILL-PAC BLACK HI-TEMP SEALANT   1-TUBE, (10.3oz)
1 x MAGNET w/SHEATH   1.000 x .750" 1/4" THICK
1 x CNTRL PANEL, BASIC   864/564 GS2
1 x Kanban Engine Vf Ng Milli
1 x LOG SET, 8 PCS LS84   BASIC OAK
1 x ASHPAN HOLDER KIT   ROCKPORT
1 x FRONT TRIM SIDE LEFT(864)   SERVICE PART
1 x GSKT (x2), GLASS LENSE   UNIVERSAL
1 x VALVE TRAY ASS'Y, NG 616 DF   DIAMOND FYRE - GSR2
2 x FLEX PIPE, 3/8"od x 6" BLK   SERVICE PART
1 x FLEX PIPE, 3/8"od x 16"   NO FITTINGS
1 x LOG, LEFT TWIG(UPR) LS36/79 (#7)#   CLASSIC OAK
1 x VALVE TRAY ASSY, 564 25k
1 x FACE, 32 RECT BEVEL BLK SCR*
1 x 27 : THERMOSTAT FLAP
2 x Assy Left Brick Cottage R
1 x GSKT, PILOT ASSY, GS#   ALL GREENSMART UNITS
1 x BRKT SET,LF/ RT, DVS/31DV-07+   ARCH/RECT/ARTISAN/ VIC LACE
1 x 83914 Magnet 2
1 x LIGHT BRKT ASS'Y, INSERTS-LED#   DVL&DVS GSR/31&33 DVi
2 x LIGHT BULB, HALOGEN 5PK#   35watt, T4, 120volts, 380 Lumen
1 x Screw # 4 (Magnet Holder)
1 x FACE, UPGRADE KIT, FPX 864*   FPX ARCH FACES ONLY
1 x BRKT, FACE, TOP RT - 44 DVXXL   ATTACHES TO FIREBOX
1 x GSKT, GLASS -TADPOLE [50ft] BLK   50' BULK LENGTH
2 x PILOT ASSY, NG PSE 2-WY# � UNIVERSAL
1 x GLASS FRAME, 616 GSR2   FRAME ONLY, NO GLASS OR GASKET
1 x LOG SET, DRIFTWOOD B*   FOR DVL, 33 DVI, 864 HO & CYP
1 x ROLL PIN - GLS LATCH SPRING   PACK OF 5 - 5/32" dia x 3/4"
1 x PRES RELIEF DOOR w/ GSKT #   MULTIPLE GAS UNITS 1997 +
1 x SPACER, 1/4 dia. x .312 - BLK   4 PACK - VARIOUS UNITS
1 x Firebrick Back Assy Servi
1 x CNTRL MODULE, REMOTE FUNCTN#   GSR2 MODELS
1 x FASTENER - SCW 25 PK   HWSHSMS,#8 x 3/8" TYPE B
1 x 86690 TUBE (Ø3/16) , SECONDARY AIR 2
1 x LOG, TOP LEFT - LS52 (#4)#   (2011)
1 x GROMMET, BLACK RUBBER   PACK OF 5 - SERVICE PART
1 x Log Set - Complete
1 x FACE SCREW, ART CPR, 1.5"(6)   ARTISAN, XL LGT, 1/4-20 SQHMS
1 x GLASS FRAME, INNER - 864   HO/HH/ST/TRV
1 x LAVA ROCK, 10lb. - MEDIUM   LINEAR FP
1 x FACE, 864 ARTISAN CHARCOAL*
1 x WIRE HRNS, POWER-ACCENT LIGHT#   PROVIDES AC POWER CONNECTION
1 x BLOWER ASSY RT - 864/564#   FAN KITS 99000156/99000162
1 x ACCENT LIGHT CONTROL PANEL   COMPLET w/DIMMER
1 x ORIFICE, BURNER - No. 53 #   1.180" BRASS HEX (.0595 dia)
1 x LOG EMBERS, LARGE BAG #   12oz. BAG
2 x PAINT, METALLIC BLACK 3oz#   SPRAY CAN
1 x BURNER ASSY, FRONT#   VARIOUS MODELS
1 x WIRE HRNS PIG-TAIL, MALE   3-PIN, JNCTN BOX
1 x WIRE HRNS PIG-TAIL, MALE   3-PIN, JNCTN BOX
1 x GRILL, 864 FPX BLACK*
1 x RHEOSTAT, E-GLO ONLY - 60v#   VARIOUS MODELS
1 x GSKT CEMENT, 3oz. TUBE#   w/BRUSH - UNIVERSAL
1 x TRIM ASSY, FRONT - 564 25k CF   CLEAN FACE
1 x Novasit regulator
1 x Bracket Door Catch Assembly
1 x N/S : STAND-OFFS
1 x FLEX PIPE, 3/8"od x 12 BLK   NO FITTINGS
1 x PILOT BRKT - UNIVERSAL   PSE PILOT ASS'Y
1 x CONV PARTS, NG - RS/SIT   DVL INSERT- SIT PILOT/RS VALVE
1 x Thermostatic Actuator Assembly for 15-SSW01
1 x ORIFICE, BURNER - No. 57#   1.180 BRS HEX (.043)
1 x FRONT TRIM TOP (864)   SERVICE PART
1 x 20 : OUTER STARTER COLLAR
1 x FASTENER, NUT, KEPS - 8-32 BLK   25-PACK w/ spinning lock washer
1 x Inner Top Baffle Plate
1 x FUSE, 3.15AMP 5-PK GS2#   GS2 CONTROL BOARD
1 x WALL PLATE, WHITE (RKR SWTCH)   SERVICE PART
1 x FACE, 430 SHADOW BLACK SCR*
1 x FLUE STARTER SCTN (8" od)   w/GASKET
1 x STEPPER MOTOR, LP GS#   GS1/GSR/GSR2 - 11"-2.9" WC.
1 x LOG, MIDDLE LEFT LS36/79 (#4)#   CLASSIC OAK
1 x ANDIRON, ARABESQUE*   864 & CLEAN FACE
1 x 14 : BURNER INJECTOR LP 1.80
1 x PAINT, METALLIC BLACK 3oz#   SPRAY CAN
1 x ASHPAN ASSY, ROCKPORT   SERVICE PART
1 x BURNER ASS'Y, CENTER - 564 DF   SERVICE PART
1 x Kanban Engine Trad Lp Eco
1 x SPACER, 1/4 dia. x .312 - BLK   4 PACK - VARIOUS UNITS
1 x 83913 SPRING 2
1 x FIREBACK, 36 CF BLK GLASS*
1 x WIRE HRNS, MAIN GSR-2#   PRO-FLAME 2
1 x Gasket, 5 Diam. Exhaust
1 x WIRE HRNS, JUMPER, BLWR/PILOT   VARIOUS GSR2 MODELS
1 x LOG, REAR - LS36/79 (#1)#   CLASSIC OAK
1 x SHUT-OFF VALVE#   VARIOUS GAS UNITS
1 x GSKT, GLASS -TADPOLE [50ft] BLK   50' BULK LENGTH
1 x GRILL, HEAT-DUCT KIT w/MOUNT   SCREWS
1 x WIRING HARNESS-SALES
1 x Handle mount plate
1 x WIRE HRNS, MAIN - 44DV/ 864HH   NO ON/OFF SWITCH
1 x BRICK RETAINER w/SCREW (1)   36CF/ST
1 x LOG, FRONT LEFT - LS37 (#7)#   XTREME - DRIFTWOOD
2 x ORIFICE, BURNER - .0625"   1.180" BRASS HEX (.0625 dia)
1 x PAINT, METALLIC BLACK - 12oz.#   SPRAY CAN
1 x KIT, POWER EXHAUST*
2 x INJECTOR, PILOT - LP (#35) #   USE w/SIT PILOT ONLY
1 x DAMPER BLOCK OFF COVER (1)   w/ FASTENERS
1 x GLASS, 1/4 CRUSHED BRNZ 10LBS*
2 x Assy Louver Top Service
2 x Black 12oz Aerosol Spray
1 x HANDLE (SPRING), DOOR - BLACK#   1/2" id x 4.158" LONG
1 x AIRTUBE PINS & SCREWS - 4 PK#   VARIOUS AIRTUBE KITS
2 x Fan Speed Controller Knob 99/00/01/02/03/04
1 x SWITCH, ROCKER - 3 POS   LOPI 83-93 CHK AVAILABILITY
1 x Kanban Engine Vent Free
1 x CNTRL MODULE, BASIC FUNCTION#   GSB2 MODELS
1 x VALVE REGULATOR, NG SIT#   S.I.T. 907.201 (1.6 - 3.5)
2 x 10 : GAS VALVE ASSEMBLY - LP
1 x FASTENER - KEPS NUT 10 PK   10-24
1 x RHEOSTAT WHEEL (1)   w/ SPACERS AND COLLAR
1 x Kanban Engine Contemp Lp
1 x FUSE HOLDER- GS2 #   NO FUSE
1 x Glass Gasket - Flush Tadpole Type (Per Foot)
1 x FUSE, 3.15AMP 5-PK GS2#   GS2 CONTROL BOARD
1 x PRESSURE RELIEF DR, w/GSKT   NRTHFLD/564HO - GSR2 SCR
1 x Storm Collar - Galvanized
1 x VALVE, SERVO MOTOR - NG#   SKYTECH - AF4044 VALVE - ALPHA
1 x EXHST/INTAKE CVRS w/GSKTS   w/FASTENERS - 564
1 x 52 : PANEL DOOR LATTICE- CLASSIC BLACK
1 x FASTENER - SCW BLACK 6 PK   PHPSMS, #8 x 3/8"
1 x GSKT, GLASS 3/4" WIDE x 70"#   LOPI WOOD, PELLET & GAS
1 x VALVE, NG - S.I.T. (3.5-1.6)#   S.I.T. 820.704
1 x KIT, POWER EXHAUST*
1 x Bracket, Mantel-mmk
1 x WIRE HRNS PIG-TAIL, MALE   3-PIN, JNCTN BOX
1 x PILOT ORIFICE, LP - 0.014 PSE#   PSE PILOT ASSY
1 x GSKT TADPOLE,3/8 x3/4 PSA BLK#   12' BULK LENGTH
1 x PILOT TUBE, SIT#   USE w/SIT PILOT ASSY ONLY
2 x 3-Way Gold Contact Switch 99/00/01/02/03/04
2 x BATTERY TRAY, GS - "AA"   SERVICE PART
1 x REMOTE, SILVER WALL-MNT BASIC#   MV/GSB2 MODELS (SIT 0.584.046)
3 x Round Ceramic Magnet (Each)
1 x Right Base Log #2 24 Set
1 x BRUSH, BENT HANDLE #   COMBUSTOR/FIREBOX BROOM
1 x POWER CORD, w/MOLEX (18 GA) #   UNIVERSAL - WOOD & GAS
2 x N/S : VENTURI GASKET
1 x CONV PARTS, NG - SIT   BERKSHIRE-GS / TOL-GS
1 x EF2/3 FPI 0 CLR/BIH HOPPER COVER
1 x Novasit Pilot Assembly - LP ***
1 x CATALYTIC COMBUSTOR, w/GSKT# � FPX WOOD/APEX 3.6 x 18 x 3
1 x Firebox Baffle
1 x SWITCH, ROCKER, ON/OFF#   SINGLE-POLE, VARIOUS GAS UNITS
1 x RHEO w/OFF, 90v, RECT (MM)#   w/NUT & WASHER
1 x Back, Lg Conv'90
1 x BAF PLATE, 36 "A" 2 PC SET#   FRONT & BACK
1 x PILOT ELECTRODE - SIT#   SPARK ELECTRODE - SIT PILOT
1 x GSKT TAPE, 1/4" X 1/16" WHT   10' BULK LENGTH
1 x BLOWER FILTER, REPLACEMENT#   FPX WOOD
2 x LIGHT BULB, HALOGEN 5PK#   35watt, T4, 120volts, 380 Lumen
1 x CONV PARTS, NG - RS#   SP-BV/DV/HERT/AVT/CHLN/36DV
1 x S2600 JACKET TOP-SALES
1 x PIPE ADAPTER, 3/8 FLARE x3/8M   3/8 FLARE x 3/8 MPT - 1/4 FPT
1 x FLAPPER HOOK W/HOLE-SALES
1 x TRIM, FRONT RIGHT SIDE - 564   PRE SCREEN MODELS
1 x HEARTH PLATE - 864 TRV GS#   SERVICE PART
2 x # 30 burner orifice
1 x GLASS CLIP SET, ARCH(FWP)   FULL SET,TOP/BTM CLIPS w/GSKT
1 x GRILL ASSY, TOP - 564   SS/HO - 2007-12
2 x Thermodisc 160 Degree High Limit (60T12)
1 x GSKT TADPOLE,3/8 x3/4 PSA BLK#   12' BULK LENGTH
1 x DOOR HANDLE BUSHING
1 x WIRE HRNS PIG-TAIL, MALE   3-PIN, JNCTN BOX
2 x FUSE, 3AMP, 1/4 dia 5-PK#   250-AVC, GLASS TUBE, 3AG
1 x RHEO w/OFF, 90v, RECT (MM)#   w/NUT & WASHER
1 x LOG, CENTER RT LS59(#7)#   LODGE PINE
1 x 10 Amp Circuit Breaker
1 x PILOT ELECTRODE, 24" - PSE#   PILOT FLAME SENSOR - PSE ONLY
1 x VALVE REGULATOR, LP SIT#   S.I.T. 907.204
1 x GLASS LATCH - FINGER-PULL#   vr.2, 2007+
1 x LOG GRATE, 864 HO DA/EF   GS THRU GSR2 SCR MODELS
2 x 24" Standard Grate 20mm / PC - Black
1 x STEPPER MOTOR, NG GS2#   GS2/GSR/GSR2 - 3.5"-1.6" WC
1 x MERIDIAN FS TOP FRONT
1 x Grill Plate - White
1 x VENT, ELITE - 12" CHIMNEY*   810006664
1 x GLASS w/FRAME - BRK/TOL   FINGER-PULL LATCH - 2007+
2 x Burner Orifice # 54 - LP - Rear
1 x SHL, LEG, BRKSHR/GRNFD NWI   NEW IRON, - SCREEN MODELS
1 x Fan Assembly
1 x KNOB (PLASTIC), RHEOSTATS #   BLACK w/WHITE LINE - GAS/WOOD
1 x MANIFOLD, UPPER CONV - 42A-CF
1 x E3OGI - CONVERSION KIT FOR GLASS IPI -NG TO LP
1 x 891169 HOSE, HEATER 2
1 x EMBERS, ROCK-WOOL 5 gram#
1 x Hopper B motor mount assy
1 x IGNITER, LG PS/PI #   AST/ARBR/YANK/LEYN - 2000 & UP
1 x BRKT, ACCENT LIGHT   616 GSR2
1 x BLOWER ASS'Y, RIGHT - FW#   FW/FWP/LFW INSERTS
1 x BURNER RETROFIT, EF-III, CAST#   DVS INS/ZC '01/SPRT/ALLIGENCE
1 x METER, MOISTURE WOOD 4PK*
1 x VENT HOOD w/RING, 7" - 44"E"#   44 ELITE - FOR COOLING DUCT
1 x PRES RELIEF DOOR (1) 96-08'   DVSZC & VARIOUS FS GAS
1 x Insul Gasket Shoe-s M
1 x LOG, RIGHT TWIG - LS13 #   36DVXL EF/EF2/HERT EF2/864HH
1 x FASTENER - HEX NUT,BRASS 7 PK#   COMBUSTOR PLATE -3/8"-16
1 x VALVE, NG - S.I.T. (3.5-1.6)#   S.I.T. 820.704
1 x Ball Nickel
1 x 891987 Plastic Knob 1
1 x Rear Control Panel 99/00/01/02/03/04
1 x PIPE ADAPTER, 3/8 FLARE x3/8M   3/8 FLARE x 3/8 MPT - 1/4 FPT
1 x KNOB (WOOD) w/ SCREW, BLK FWI#   3/8 i.d. w/HOLE - PAINTED BLK
1 x ORIFICE, PILOT - NG (.021)#   ALL 93 & UP GAS w/RS PILOT ASY
1 x FASTENER - KEPS NUT, 10 PK   8-32
1 x PAINT, METALLIC BLACK 3oz#   SPRAY CAN
1 x GLASS w/GASKET - 864 HH/HO   SERVICE PART
1 x BRKT SET, FIREBOX - 864   WILMINGTON/LEGACY
1 x GLASS w/GASKET - 616   616 GSR INSERT
1 x FLUE STARTER SCTN (8" od)   w/GASKET
1 x FIREBACK, DVL INS BRICK/HERR*
1 x MANTEL, HEWN TIMBER 5FT*
1 x FLEX PIPE, 3/8 x 8-1/2#   w/ ORIFICE MANIFOLD
1 x Auger Stop Bracket 1
1 x HOPPR SPRING PLATE ASS'Y, RT#   LARGE PELLET INSERT
2 x WIRE HRNS, FUSE GS2-GSR2 #   PRO-FLAME 2
1 x BRKT SET, FIREBOX - 864   WILMINGTON/LEGACY
1 x RHEOSTAT, WALL MNT#   42 APEX
1 x Glass Lt-ewf36b
1 x Small Shell Fireback / Cast Iron - Black
1 x 89586 AUGER NIPPLE 1
1 x SCREEN, MESH 864 - BLACK   36" x 24"
1 x FUSE, 3AMP, 1/4 dia 5-PK#   250-AVC, GLASS TUBE, 3AG
1 x PILOT ASSY (5-Pk), NG - S.I.T#   MILIVOLT MDLS ONLY
1 x 17 : LEFT END ENCORE NC - SAND
2 x Fan Speed Control (Rheostat) 99/00/01/02/03/04
1 x SNAP-DISC/BRKT ASSY - FW#   BLWR - FW/FWP/LFW
1 x AUGER MOTOR 115V (1 RPM)
1 x GSKT, PILOT ASSY, GS#   ALL GREENSMART UNITS
1 x 892053 ACCESS PANEL, BACK 1
1 x EF3 GLASS RETAINER EXTRUSIONS (SET OF 2)
1 x SPACER, 1/4 dia. x .312 - BLK   4 PACK - VARIOUS UNITS
1 x PILOT ELECTRODE COVER TUBE   SILICONE TUBE
1 x DOOR SHELL ASS'Y, RT, FLI   FLUSH WOOD INSERT
1 x LOG, LEFT TWIG - LS1 #   1996-2000
3 x Pressure Relief Door Back 99/00/01/02/03/04
1 x LIGHT BULB, HALOGEN 5PK#   35watt, T4, 120volts, 380 Lumen
1 x Restrictor
1 x LOG EMBERS, SMALL BAG #   4 oz. bag
1 x Sprig Candelabra - New! / PC - Black
1 x CONTROL DOOR, MET BLACK   EDEN/NORTHFIELD
1 x 42" Bi-Fold Door, Black
1 x STOVE PACK, ALLEGIANCE (EF)   2001 - #219
1 x VALVE, SPLIT-FLOW v.2#   DUAL-BRNR CNRL - GSR/GSR2
1 x ORIFICE, BURNER - .0625"   1.180" BRASS HEX (.0625 dia)
1 x SWITCH, SNAP ACTION, MINIATURE   VARIOUS MODELS
2 x Handle Assy-horiz Align-g
1 x Top Relief Plate 99/00/01/02/03/04
1 x KNOB, PHENLIC#   BLACK - 1" dia
1 x Halogen Bulb, 60w
1 x LOG, TOP RIGHT - LS52 (#5)#   (2011)
1 x WIRE HRNS, FAN/LIGHT GSR-2#   PRO-FLAME 2
1 x GSKT, GLS 15/16"x50ft. 302-B#   VARIOUS WOOD, PELLET & GAS
3 x Transflo Blower - Motor Only
1 x 5in Single Paddle Blade
1 x GSKT, GLS 15/16x100" 302-B#   VARIOUS WOOD, PELLET & GAS
1 x Angle Cut Brick Lt
1 x BATTERY TRAY, GS - "AA"   SERVICE PART
1 x FRONT PLATE, GS - CNTRL PANEL   TOL, EDN, BRKSHRE, NRTHFLD
2 x Fire Wizard Remote Control
1 x Heat Exchange Tube Cleaning Rod - P2700 1
1 x Screwposts/washers-set 20
1 x GRMT/SPACER (4) - BLOWER#   1997+ PEL/1995+ GAS
1 x AUGER BRASS BUSHING 5/8" ID & PLATE (POSTJAN01/ 08)
1 x FIREBACK, 430 HANDMADE BRICK*
1 x Hopper Switch - Big E 1
1 x GLASS CLIP (2), TOP/BOTTOM#   DVSZC/INS 1997-2001
1 x S.I.T. NOVA VALVE CONVERTIBLE
1 x Burn Pot/tailpipe Gaskets
1 x BLOWER ASSY LT - 864/564#   FAN KITS 99000156/99000162
1 x REMOTE WALL MOUNT BRACKET#   w/SCRWS GRN SMRT GS
1 x HINGE SET, SIDE PANL- PS   LF/RT,MALE/FEMALE 97-2012
1 x GRMT/SPACER (4) - BLOWER#   1997+ PEL/1995+ GAS
1 x STEPPER MOTOR, NG GS2#   GS2/GSR/GSR2 - 3.5"-1.6" WC
1 x THERMO-COUPLE (10Pk) - RS#   DV 95 & UP, B-VENT 96 & UP
1 x EMBERS, ROCK-WOOL 5 gram#
1 x GSKT, EXH. CONNECTOR - 864   12.575" x 6"
1 x TIMING BLOCK KIT, 646 91-96#   PELLET STOVE/INSERT (AUGER)
1 x SWITCH, ROCKER, ON/OFF#   SINGLE-POLE, VARIOUS GAS UNITS
1 x SNAP-DISC - 120deg NO#   NORMALLY OPEN
1 x GSKT TADPOLE,3/8 x3/4 PSA BLK#   12' BULK LENGTH
1 x Auger Bushing – Top & Bottom, Brass (No Threads) 2
1 x THUMB SCREW - BLACK HEAD#   PK OF 2
1 x DAMPER PLATE, FWI#
1 x Bulk100-cntrlcknut 1/4-20
2 x MAGNET w/OUT SHEATH   w/ MOUNTING HW
1 x E30GI - CONVERSION KIT FOR GLASS IPI - LP TO NG
1 x 891164 WELDMENT, AUGER HOUSING 1
1 x GSKT, GLASS, 75" - FWP/LFW#   GSKT ROPE, 1/4" dia, BLACK
1 x Black Flush Glass Trim (Each)
1 x RESTRICTOR, AIRFLOW, LP 430   430 INSERT
1 x VALVE TRAY ASS'Y NG - 616 GS1   w/ VALVE/SPLIT FLOW
1 x GLASS, 1/4 CRUSHED CBLT 10LBS*
1 x GSKT CEMENT, 3oz. TUBE#   w/BRUSH - UNIVERSAL
1 x Standard Single Speed
1 x GRATE, IRON 864TRV/HH/ST   SERVICE PART
1 x PILOT ASSY, NG, PSE 3-WY# � w/ GSKT, 616/430
1 x STUD PLATE (564/864)#   SS/DF/TRV/HO/ST
1 x 891161 WELD., BOT. PLATE RETAINER 1
1 x Ddm Replacement Cable Kit
1 x CONV PARTS, LP - SIT   31DVi / BERKSHIRE-GS / TOL-GS
1 x FLEX PIPE, 3/8"od x 12 BLK   NO FITTINGS
1 x 5/8" collar with set screw
1 x SNAP-DISC - 120deg NO#   WOODSTOVE & INSERT
1 x FLEX PIPE, 3/8"od x 46"   TEPMEST TORCH/616 INSERT
1 x FASTENER - KEPS NUT 10 PK   10-24
1 x EMBERS, ROCK-WOOL 5 gram#
1 x SWITCH, ROCKER - SINGLE POLE#   WHITE
1 x EMBERS, ROCK-WOOL 50 grams#   8X10 BAG
1 x 7 : VALVE REGULATOR LP
1 x TLC HEAT SHIELD-SALES
1 x Hearth Refractory
1 x ORIFICE, BURNER - No. 49 #   1.180" BRASS HEX (.073 dia)
1 x Round To Oval Adaptor
1 x ORIFICE, BURNER - No. 57#   1.180 BRS HEX (.043)
1 x MAGNET w/SHEATH   1.000 x .750" 1/4" THICK
1 x ORIFICE, PILOT LP - .016 #   ROBERT SHAW
1 x PIEZO IGNITER, ALL mv GAS UNITS #   w/ RETAINING NUT
1 x RESTRICTOR PLATE ASSY, 430   w/ BIMETAL STRIP
1 x Bracket Outside Air-s M L
1 x 38 : FRONT,ENCORE NC - VERMONT CLASSIC GREEN
1 x GSKT, WIRE PLATE   VARIOUS UNITS - 2" x 1-1/4"
1 x DRAFT FLOW TUBE, 26" #   ALL PELLET FS & INSERTS
1 x INJECTOR, PILOT - LP (#35) #   USE w/SIT PILOT ONLY
2 x Lava - Bag
1 x 17 : LEFT END ENCORE NC - MIDNIGHT BLUE
1 x PAINT, METALLIC BLACK 3oz#   SPRAY CAN
1 x GSKT, GLASS 5/8"x137" BLACK#   ALL PS & PI 1997 & UP
2 x 9 : KNOB
1 x 3/8x1/2 Silicone Psa-20ft
1 x Ash Door Handle Assembly - Complete
1 x FLEX PIPE, 3/8 x 8-1/2#   w/ ORIFICE MANIFOLD
1 x SIT NOVA NG 50% TURN DOWN REG. PLATE (ALL GAS EXC 828/EG30/EG95)
2 x PILOT AIR DEFLCTR, 96-00DV/BV#   SP/AVANTI/CHELAN/DVS
1 x WIRE HRNS, BURNER ON/OFF   GS2 - BASIC SYSTEM
1 x FASTENER - SCW 25 PK   HWSHSMS,#8 x 3/8" TYPE B
2 x N/S : FLEXIBLE GAS LINE W/SHUT-OFF VALVE
1 x Adjustment Gear Assembly 99/00/01/02/03/04
1 x POWER HEAT DUCT, EXTRA ROOM*   564 HO, 864's, 4237 & HO LINEARS
1 x IGNITER, GRNSTART - FS/INS #   WD STOVE/INSERT IGNITER
1 x Coal rake rod
1 x VENT, ELITE ROUND TERM CAP*   810006676
1 x ORIFICE, BURNER - No. 50#   SERVICE PART
1 x LOG PINS, LS-13, WHITE CERAMC#   SET OF 3, 1/4 dia x 1-1/2"
1 x PILOT ELECTRODE COVER TUBE   SILICONE TUBE
1 x VALVE, PROFLAME GS - SIT#   GAS CNTRL VALVE - NG REG
1 x Trim Rail Brkt (nielsen)
1 x 8 : HANDLE SCREW - 1/4 -20 X 3 3/8
1 x 11 : FRONT FACE
1 x FUSE, 3.15AMP 5-PK GS2#   GS2 CONTROL BOARD
1 x KNOB (PLASTIC), RHEOSTATS #   BLACK w/WHITE LINE - GAS/WOOD
1 x E30 BRICK LINER
1 x GSKT, PILOT ASSY, GS#   ALL GREENSMART UNITS
1 x STUD PLATE SET, GLS CLIPS   AVANTI BV/DV 95-96
1 x EMBERS, ROCK-WOOL 50 grams#   8X10 BAG
1 x ORIFICE, BURNER - No. 49 #   1.180" BRASS HEX (.073 dia)
1 x Brick Panel Base - Set Of 2
1 x BATTERY HOLDER, GSR-2#   PRO-FLAME-2
1 x FASTENER - KEPS NUT, 10 PK   8-32
1 x Retainer Lwr Rt-cdws
1 x 891189 PLATE, TOP BUSHING 1
1 x PAINT, METALLIC BLACK 3oz#   SPRAY CAN
1 x 83874 1/8 Dia X 1-1/2 Cotter Pin 4
1 x 19 : FLUE COLLAR
1 x 20 : RIGHT END ENCORE NC - CHESTNUT BROWN
1 x PILOT SHIELD[v2] 430/616 PSE   SR# SPECIFIC
1 x AC ADAPTER, 7v #   BASE GRN SMT APPLIANCES ONLY
1 x Dielectric Grease (Packet)
1 x SHUT-OFF VALVE#   VARIOUS GAS UNITS
1 x GASKET KIT, GLASS FPX 36A/E#   DOUBLE & SINGLE DOORS
1 x Control Panel Faceplate for A-E-101 1
1 x FACE SCREW, GLD, 1-1/2" (12)#   XTRA-LONG LGT - 1/4-20 PHPMS
1 x STEPPER MOTOR, NG GS2#   GS2/GSR/GSR2 - 3.5"-1.6" WC
1 x ORIFICE, BURNER - .0625"   1.180" BRASS HEX (.0625 dia)
1 x HW PACK, BLOWER 564/864   FOR NON-GS MODELS ONLY
1 x Outer Back Asm -cdws
1 x Novasit Pilot Assembly - LP
1 x Fitting 1/8" Brass Pipe Adaptor (Located Between Elbows
1 x HEAT EXCHANGER SHIELD   DVL EF-II/DVS EF-II INSERT
1 x BLOWER, LT, GAS INS - 2005+ #   EF-II/DVS/DVL/31/33
1 x GLASS LATCH - FINGER-PULL#   vr.2, 2007+
1 x Top Relief Frame
1 x Fdr Slide Plate Asy-sales
1 x RHEOSTAT PLATE SCREWS, BLACK   SET OF 2 - 36A/E, 44A/E
1 x Faceplate Hardware Package - Black Trim
1 x RHEO w/OFF, SQUARE(MM)#   w/NUT & WASHER
1 x FASTENER - SCW BLK 6 PK#   WD DR HNDL, 1-1/4"x1/4-20
1 x GLASS LATCH - FINGER-PULL#   vr.2, 2007+
1 x STEPPER MOTOR, LP GS#   GS1/GSR/GSR2 - 11"-2.9" WC.
1 x GLASS LATCH, SPRING PIN   INS VARIOUS MODELS
1 x Replacement Glass (Size: 17 5/8" W X 13 5/8" H)
1 x Power Cord - 120 Volt
1 x GASKET-3 X 1/8 FLAT-5 FT
1 x Wrought Iron Damper Pull / PC - Graphite
1 x BRKT, FACE CONNECTORS L/R#   DVS /EF II/GS/31
1 x FIRESTOP, 44 DVXXL/DVL ZC 03/   21 RV/HDY RV/864 TRV
1 x LOG EMBERS, SMALL BAG #   4 oz. bag
1 x ORIFICE, BURNER - No. 45   1.180" BRASS HEX (.082 dia)
1 x GRILL, 864 LOUVER BLACK*
1 x SPACER, 1/4 dia. x .312 - BLK   4 PACK - VARIOUS UNITS
1 x 891414 Half Firebrick (2-1/4 wide x 9 tall x 1-1/4 thick) 3
1 x ORIFICE, BURNER - No. 37   1.180" BRASS HEX (.104 dia)
1 x FASTENER - SCWS 8-PK GLS CLIP#   8-32 x 3/8" PH TORX TYPE F
1 x HINGE PLATE ASS'Y, DOOR   ASTR, ASTR BAY, YANKEE BAY
1 x Door Frame Assembly - C/W Glass
1 x MANUAL, SPIRIT DVM 1996
1 x Wire, Cc/cb 24 Scs
1 x Roped Glass - (s10014)
1 x VALVE, LP DV, '96-00 - DEXEN#   NO TCI BLOCK
2 x 3/8" X 7" Gas Inlet Pipe
1 x PILOT ELECTRODE SLEEVE, BLK#   BULK LENGTH - 6 FEET
1 x GSKT, GLASS 3/4"x50ft. 301-B#   ASHESIVE BACK, GLS GSKT
1 x RESTRICTOR PLATE, EXHAUST   w/SCREWS 864 TRV
1 x ORIFICE, BURNER - No. 67   SERVICE PART
1 x STEPPER, GSR LP CONV 4PK*   GSR2
1 x PAINT, METALLIC BLACK 3oz#   SPRAY CAN
1 x STEPPER MOTOR, NG GS2 4-PK#   1.6"-3.5" WC
1 x VENT, ELITE - 24" CHIMNEY*   810006666
2 x CNTRL MODULE, REMOTE FUNCTN#   GSR2 MODELS
1 x CORD RESTRAINER - LRG (BLACK)   AC POWER CORD
1 x Back Heat Shield
1 x WIRE HRNS PIG-TAIL, GRND   UNIVERSAL
1 x PRESS SENSOR KIT-SALE
1 x (181987) Ash Pan Knob - 2 1
1 x MANIFLD-ASSY 864HH/DVL/HER/SAL   SERVICE PART
1 x WIRE HRNS, GROUND - 8.25"   UNIVERSAL
1 x Acc Combustion Housing
1 x WIRE HRNS, MAIN GSR-2#   PRO-FLAME 2
1 x FASTENER - KEPS NUT, 10 PK   8-32
1 x WIRE HRNS, MAIN 616/430GSR-2#   SERVICE TICKET REQUIRED
1 x LOG SET, CYPRESS/33 STANDARD*   CYPRESS & 33 DVI 864 DF
2 x LOG EMBERS, METAL WOOL#
1 x MAGNET w/SHEATH   1.000 x .750" 1/4" THICK
1 x VALVE REGULATOR, NG RS#   ROBERT SHAW (0.9-3.5")
1 x TOOL, GLASS LATCH/RESTRICT0R #   VARIOUS GAS AND PELLET
1 x MERIDIAN TUBE CLEANER ROD
1 x THERMO-PILE - RS#   ALL BV/DV w/ROBERT-SHAW PILOT
1 x Ul Fdr Snout Gasket-10 Pk
1 x Cam Latch – P22, P1000PB, P4000 1
1 x LIGHT TRAY, 864HO DF   DF BURNER KIT - 96900142
1 x LOG EMBERS, SMALL BAG #   4 oz. bag
1 x ORIFICE, BURNER - No. 50#   SERVICE PART
1 x AUGER BUSHING PLATE, UPPER #   1997 & UP PS/PI, LRG OR SML
1 x FIREBOX TOP HEAT SHIELD   864 -FACE HEARTHVIEW - DBL DR
1 x GLASS LATCH, SPRING PIN   INS VARIOUS MODELS
1 x FLUE COLLAR ASSY, 864   INTAKE/EXHAUST PIPE
1 x CORD RESTRAINER - LRG (BLACK)   AC POWER CORD
1 x Insulation, 2 Range
1 x 80617 WIRING HARNESS,ROOM BLOWERS 1
1 x AUGER ASS'Y, SMALL PS/PI   1997-12, 1-1/4" PITCH FLIGHT
1 x Pawl Top-ewf36b
1 x MANUAL, FLUSH WOOD HYBRID-FYRE   INSTALL/OPERATION
1 x RHEO NO OFF, SQUARE #   w/ TWO MALE CONNECTORS
1 x LOG, LEFT (BOTTOM) - LS23#
1 x ANDIRON, TRADITIONAL RING*   564 SS
1 x COMPLETE CAST BODY - PD
1 x Manifold Pri Air-cdws
2 x ORIFICE, BURNER - No. 48   1.180" BRASS HXE (.076 dia)
1 x DOOR TRIM, YANKEE BAY, BLACK   (PAINTED) - SLIP-ON STYLE
1 x Log, Hbdv400 #1 Hb
1 x GLASS, 1/4 CRUSHED CBLT 10LBS*
1 x WIRE HRNS, POWER GSR2#   INCOMING POWER
1 x MANUAL, BERKSHIRE-GS2 2013
2 x 12B : R/S (ON/OFF SWITCH)
1 x Robertshaw Valve Only - LP
1 x SHUT-OFF VALVE#   VARIOUS GAS UNITS
1 x FASTENER - SCW BLK 6 PK#   WD DR HNDL, 1-1/4"x1/4-20
1 x SCRN FRAME COVER, ARCH - 864   SCREEN MODELS ONLY
1 x PELLET STOVE CLEANING BRUSH
1 x COMBUSTION / EXHAUST BLOWER ASSEM. 115V(FORMED)(POST 10-03)
1 x POWER HEAT DUCT, EXTRA ROOM*   564 HO, 864's, 4237 & HO LINEARS
1 x EMBERS, ROCK-WOOL 5 gram#
1 x SCREW PACK, GRILLS - 42 APEX CF
1 x FUSE, 5AMP, 5-PK#   FUSE ASSEMBLY - 93 & UP PEL
1 x PILOT ASSY (5-Pk), NG PSE 3-WY   CYP/33/DVL/864HO - GSR2
1 x WIRE HRNS, BLOWER, 616/430#   MAIN HARNESS
1 x COMBUSTION BLOWER HOUSING GASKET (CIRCULAR)
1 x Ng Sit Field Conv. Pilot
1 x CNTRL MODULE, BASIC FUNCTION#   GSB2 MODELS
1 x STRAIN RELIEF BUSHING (BLACK)   POWER CORD
1 x LOG EMBERS, SMALL BAG #   4 oz. bag
1 x 6 : FRONT INJECTOR NG NO. 42
1 x LEVELING BOLT[4], CST/BRS LEG#   1/4-20 w/RUBBER TIPS
1 x N/S : FIREBRICK SCREWS
1 x THERMO-PILE (10Pk) - SIT#   SIT PILOT 1999-2009
1 x LOG EMBERS, SMALL BAG #   4 oz. bag
1 x ANDIRON, TRADITIONAL RING*   564 SS
1 x ORIFICE, BURNER - No. 50#   SERVICE PART
1 x TIMING BLOCK KIT, 644 91-96#   PELLET STOVE/INSERT (START-UP)
1 x DOOR CAM, BRASS #   VARIOUS MODELS
1 x LOG, RIGHT TOP LS59(#6)#   LODGE PINE
1 x OUTSIDE AIR DUCT, PELLET#   1.750" x 25.0'
1 x MERIDIAN FIREBOX DOOR HINGE (PRE JAN 08)
1 x Glass Clips & Hdwr-sales
1 x PILOT TUBE, SIT#   USE w/SIT PILOT ASSY ONLY
1 x Sensor 52p-1 2 T 09 5-090
1 x PILOT ELECTRODE, 24" - PSE#   PILOT FLAME SENSOR - PSE ONLY
1 x 3 Speed Toggle Switch
1 x PAINT, METALLIC BLACK 3oz#   SPRAY CAN
1 x Flue Adaptor Insulation
1 x EMBERS, ROCK-WOOL 5 gram#
1 x PILOT ORIFICE, NG - 0.020 PSE#   NG PILOT ORIFICE
1 x BRICK-CUT, 4-1/2 x 2
1 x Ember Screen for 24" Grate / PC - Black
1 x Burner Tube Assembly LP
1 x FASTENER - SCW BLACK 6 PK   PHPSMS, #8 x 3/8"
2 x PNL SIDE ASS'Y, LT - LG PI '02   ASTORIA BAY/YANKEE BAY
1 x ELBOW, 3/8 NPT to 3/8 FLARE#   90 DEGREE - VARIOUS GAS UNITS
1 x PILOT ORIFICE, LP - 0.014 PSE#   PSE PILOT ASSY
1 x Hopper B auger weldment
1 x REFRACTORY CLIP DVS INSRT/ZC   PRE-2006'
1 x EF5 /EMPRESS FS CIRCUIT BOARD WIRE HARNESS
1 x Fan Limit Switch
1 x Novasit Pilot Hood 3 Way 00/01/02/03/04
1 x SWITCH, COMFORT CNTRL / GS#   DBL POLE
1 x GSKT, WIRE PLATE   VARIOUS UNITS - 2" x 1-1/4"
1 x CONTROL PANEL, PAINTED BLACK   POWDER COATING N/A
2 x PILOT ELECTRODE COVER TUBE   SILICONE TUBE
1 x PILOT ASSEMBLY LP
1 x PILOT ORIFICE, NG - 0.018 PSE#   NG PILOT ORIFICE
1 x Rear Log #1 24 Set Serv
1 x PELLET STOVE THERMOSTAT
1 x FLUE COLLAR ASSY, 864   INTAKE/EXHAUST PIPE
1 x Nailing Strip - Top
1 x PILOT ASSY (5-Pk), NG - S.I.T#   MILIVOLT MDLS ONLY
1 x COLD AIR DMPR w/ 18" PIPE#   BI-METALIC ASSY - FPX WOOD
1 x Trim Rail Brkt W/screw
2 x MILL-PAC BLACK HI-TEMP SEALANT   1-TUBE, (10.3oz)
1 x LOG, RIGHT BOTTOM LS59(#5)#   LODGE PINE
1 x PAINT, METALLIC BLACK - 12oz.#   SPRAY CAN
1 x CAST TOP ONLY (NO GRATE) - DB
1 x GRMT/SPACER (4) - BLOWER#   1997+ PEL/1995+ GAS
1 x COMBUSTION / EXHAUST BLOWER ASSEM. 115V(FORMED)(POST 10-03)
1 x VALVE REGULATOR, LP MAN HI-LO#   SIT 907.010 (11" - 2.9") GS
1 x GSKT, INTAKE - 864   864 HH/ST/TRV
1 x MERIDIAN FPI CABINET SIDE - LEFT
1 x FASTENER - KEPS NUT, 10 PK   8-32
1 x FIREBACK, LG FS TOP ENAM BLK*   CYPRESS / GREENFIELD
1 x GRILL, HEAT-DUCT KIT w/MOUNT   SCREWS
1 x Burner Orifice # 50 - LP 99/00/01/02/03/04
1 x Rev F Of 3-20-00744 Probe
1 x RUBBER MOTOR STOP - 2-PK#   ALL PELLET - 1990 to PRESENT
1 x Room Sensor
1 x 891977 Clip, Glass 3
1 x ASH DOOR LATCH HDWR
1 x Monarch Butterfly Tool Set - 33" Tall
1 x GLASS CLIP (4), AVA #   VARIOUS MODELS WD/GS/PEL
1 x PILOT ELECTRODE SLEEVE, BLK#   BULK LENGTH - 6 FEET
1 x 25 : 45? ELBOW FLUE ADAPTER
1 x FIREBACK, FLOOR, 864 HO   DF BURNER
1 x ORIFICE, BURNER - 1.1mm   SERVICE PART
1 x ASHLIP TRIM, SET SCREWS - 10pk#
1 x DOOR, WASHER, .390 x .630 SS#   PK OF 8
1 x Croco Bellows / Wood
1 x GSKT, PILOT ASSY, GS#   ALL GREENSMART UNITS
1 x VACUUM TUBE, SILICONE - 6ft.   BULK LENGTH OF 6 FEET
1 x ROLL PIN - GLS LATCH SPRING   PACK OF 5 - 5/32" dia x 3/4"
1 x CONV PARTS, NG 564 SS SIT/PSE   564 SS-GS1/GS2 ONLY
1 x Louver Form 22.213 Vmi
1 x GSKT, WIRE PLATE   VARIOUS UNITS - 2" x 1-1/4"
1 x Panel Firescreen W/pull S
1 x PILOT ORIFICE, NG - 0.018 PSE#   NG PILOT ORIFICE
1 x 12 : FEMALE SPADE CONNECTOR
1 x REMOTE, GS2 WALL MOUNT NG*
1 x N/S : THERMOCOUPLE-MILLIVOLT CONTROL
1 x Castg Ashfr-lrg-dutchwest
1 x FLUE ADAPTER, DV 8" TO 6-5/8"*   810004994
1 x CIRCUIT BOARD WIRE HARNESS
1 x CNTRL/ACCESS DR ASS'Y,INSERTS   31/33DVi, DVS/DVL GS-GS2
1 x TOOL, GLASS LATCH/RESTRICT0R #   VARIOUS GAS AND PELLET
1 x LOG EMBERS, LARGE BAG #   12oz. BAG
1 x Bottom Louver Bracket Restraint
1 x Ember Screen for 18" Grate / PC - Black
1 x Pf100 Ash Pan-sales
1 x CONTROL PANEL DECAL C-11625
1 x 80618 JUMPER WIRE - ROOM BLOWE 1
1 x GSKT KIT, PILOT ASSY   FOR NON-GREENSMART UNITS
1 x TERM BLK HARNESS
1 x SHL, LEG - BRKSHR/GRNFD OXB   OXFORD BROWN - SCREEN MDL
1 x DAMPER, YOKE ASS'Y, FLUSH INS#   4.546"HI x 4.562"LONG
2 x MERIDIAN FPI ASH PAN (ANGLED)
1 x SHL, TOP, GRNFLD - PATNIA BRNZ   PATINA BRONZE
1 x FLOOR BRICK RIGHT#   BURNER DVS INSERT 2005
1 x HW PACK, FACE - VICT BLK (DVS)   VR.2 BRKT - AVALVON 2007+
1 x PIPE ADAPTER, 3/8 FLARE x3/8M   3/8 FLARE x 3/8 MPT - 1/4 FPT
1 x ASHTRAP DOORS, (x2) PS/PI#   1997-2012 / LARGE OR SMALL
1 x THERMO-COUPLE - SIT #   USE w/SIT PILOT ONLY
1 x INJECTOR, PILOT - NG (#62)#   USE w/SIT PILOT ONLY
1 x (891148) Handle – Pocket Pull For Hopper Lid 1
1 x MERIDIAN DOOR COVER - PAINTED
1 x SHUT-OFF VALVE#   VARIOUS GAS UNITS
1 x PIPE ADAPTER, 3/8 FLARE x3/8M   3/8 FLARE x 3/8 MPT - 1/4 FPT
1 x FUSE HOLDER- GS2 #   NO FUSE
1 x PILOT HOOD,2-WAY, S.I.T - GS#   STANDARD GS PILOT HOOD
1 x PILOT HOOD,2-WAY, S.I.T - GS#   STANDARD GS PILOT HOOD
1 x PAINT, METALLIC BLACK 3oz#   SPRAY CAN
1 x GSKT, EXHAUST/INTAKE - 616#   616 GSR INSERT
2 x LOG EMBERS, LARGE BAG #   12oz. BAG
1 x VALVE, SHUT-OFF - 616/430#   BALL VALVE - 616/430 INSERT
1 x ORIFICE, BURNER - No. 49 #   1.180" BRASS HEX (.073 dia)
2 x STEPPER MOTOR, NG GS2#   GS2/GSR/GSR2 - 3.5"-1.6" WC
1 x ORIFICE, BURNER - No. 48   1.180" BRASS HXE (.076 dia)
1 x Decal - Converted To Natural Gas
2 x GRATE HOLDER-SALES
1 x Stacked Rust
1 x MERIDIAN FS LOWER CABINET TRIM ONLY(1 PC)-PAINTED
1 x FLUSH HANDLE FOR HOPPER LID AND BBQ CART DOOR(S)
1 x LOG, MIDDLE RIGHT - LS60 (#3)#   TRADITIONAL
1 x VENT START COLLAR ASS'Y   616 GSR INSERT
1 x CONV PARTS, NG - RS/SIT   SPIRITDV-EF SIT PILOT/RS VLVE
1 x 891440 CLEANOUT, ASH 2
1 x PILOT ASSY, NG PSE 2-WY# � UNIVERSAL
1 x FACE SCREW, BLACK, 1" (12)   STANDARD LENGTH - 1/4-20 PHPMS
1 x CIRCUIT BOARD 5 AMP FUSE 115V (SET OF 2)
1 x PILOT ASSY, NG PSE 2-WY# � UNIVERSAL
1 x ORIFICE, BURNER - No. 55   1.180" BRASS HEX (.052 dia)
1 x RECESSED CONTROL PANEL W/DOOR & LATCH NO DECAL-FS
1 x BI-METALIC DAMPER#   616 GSR/GSR2/4415/3615/6015
1 x Variable Speed with Wall Switch
1 x STOVE PACK, 42 APEX CF   2017
1 x GSKT TADPOLE,3/8 x3/4 PSA BLK#   12' BULK LENGTH
1 x 3-20-08752 Fan Blade-3 Pk
1 x Pc45 Feeder Auger
1 x Ivory Full Stacked
1 x COMBUSTION BLOWER MOUNTING GASKET
1 x SPACER, 1/4 dia. x .312 - BLK   4 PACK - VARIOUS UNITS
1 x CORD RESTRAINER - LRG (BLACK)   AC POWER CORD
1 x VALVE, LP DV, '96-00 - DEXEN#   NO TCI BLOCK
1 x ELEC JUNCTION BOX   564/864 GS
1 x PULL RING, METALLIC BLACK #   PAINTED
1 x SNAP DISC HOLE COVER   w/SCREWS & GSKT
1 x Fireplace Insert Insulation (KK0111)
1 x FLEX PIPE, 3/8"od x 12 BLK   NO FITTINGS
1 x CNTRL MODULE, REMOTE FUNCTN#   GSR2 MODELS
2 x ORIFICE, BURNER - No. 44   1.180 BRS HEX (.086)
1 x Burner assembly - LP
1 x FUSE, 3AMP, 1/4 dia 5-PK#   250-AVC, GLASS TUBE, 3AG
1 x SWITCH, ROCKER, ON/OFF#   SINGLE-POLE, VARIOUS GAS UNITS
1 x GLASS w/FRAME - 21DV 2004   SWTDRMS/21DV-RV/21DVEF
1 x RFRCTRY CEROBRD, CENTER #   10.25" X 10.88" - ALL 1990 PS
1 x CONV PARTS, NG - SIT#   ALL/BERK/CDR/PRA/TOL/DVSZC-INS
1 x GSKT TADPOLE,3/8 x3/4 PSA BLK#   12' BULK LENGTH
1 x SNAP-DISC - 200deg NC #   NORMALLY CLOSED - HOPPER DISC.
1 x FUSE, 3AMP, 1/4 dia 5-PK#   250-AVC, GLASS TUBE, 3AG
1 x FRONT TRIM TOP (864)   SERVICE PART
1 x Ring, Jump (sm Plated)
1 x SHUT-OFF VALVE#   VARIOUS GAS UNITS
1 x HANDLE w/BRS CAM, BLK HDL#   BLACK SPRING HANDLE, 1988+
1 x SWITCH(RKR), ON/OFF - LARGE#   PEL 90-96/GAS, 93-95 EXCEPT DV
1 x CAST IRON GRATE
1 x FIREBACK, DVL HANDMADE BRICK*
1 x 65 : 1/4 -20 X 1«IN HEX HEAD CAP SCREW
1 x AUGER BRASS BUSHING 5/8" ID & PLATE (POSTJAN01/ 08)
1 x SWITCH, PILOT ON/OFF - GS#   (GREENSMART PILOT CONTROL)
1 x Tube Pilot/valve/reg Mv
1 x FASTENER - KEPS NUT, 10 PK   8-32
1 x SEAL PLATE - NG   VARIOUS GSR/GSR2 MODELS
1 x LOG, MIDDLE RIGHT - LS70 (#8)#   (TRADITIONAL) v.2
1 x Valve Assembly Gasket {1999 to Present}
1 x EMBERS, ROCK-WOOL 50 grams#   8X10 BAG
1 x THERMO-COUPLE (10Pk) - RS#   DV 95 & UP, B-VENT 96 & UP
1 x GSKT, GLASS -TADPOLE [50ft] BLK   50' BULK LENGTH
1 x DIFFUSER, w/ SCWS   VARIOUS MODELS
1 x MAGNET w/OUT SHEATH   w/ MOUNTING HW
2 x Flanged Bushing--Auger
1 x GSKT TAPE, 1/4" X 1/16" WHT   10' BULK LENGTH
1 x BRICK-CUT, 9 x 7 x 2-5/16
1 x FLUE HANDLE - DVS/DVL INSERT   SERVICE PART
1 x SHUT-OFF VALVE#   VARIOUS GAS UNITS
1 x THERMO-COUPLE - RS #   DV 95 & UP, B-VENT 96 & UP
1 x HEAT EXCHANGER SHIELD#   DVS/DVL/31/33 DVi
1 x RHEO w/OFF, 90v, RECT (MM)#   w/NUT & WASHER
1 x EMPRESS-1-FS HOPPER LID - POST S/N 217746
1 x Door Assy Wdv500
1 x LOG SHELF (864 ST)   SERVICE PART
1 x ORIFICE, BURNER - No. 44   1.180 BRS HEX (.086)
1 x SNAP-DISC/BRKT ASSY - FW#   BLWR - FW/FWP/LFW
1 x FACE SCREW, BLK, 2-1/2" (6)#   XXTRA-LONG LGT - 1/4-20 PHPMS
1 x Ash Drawer Gasket - Sold Per Foot
1 x 21 : AC MODULE ONLY (NO WIRE HARNESS)
1 x ORIFICE, AIR MIXING - #C55   SERVICE PART
1 x SNAP-DISC - 120deg CERAMIC#   NORMALLY OPEN - SYSTEM DISC
1 x PANEL, INSULATION - 3" x 10' #   Wood Burning Inserts
1 x THERMO-PILE (10-PK) - RS#   ALL BV/DV/ w/ ROBERT SHAW PILOT
1 x C42373 Rocker Switch 1
1 x LOG EMBERS, LARGE BAG #   12oz. BAG
1 x LIFTING HANDLES, FIREPLACE #   VARIOUS FIREPLACES
1 x VALVE NG- Manual Hi/Lo
1 x GSKT, DOOR 7/8" x 50' BLACK#   ROPE - MISC. GAS/WOOD/PELLET
1 x PANEL, 616 ONE PC 30.5 x 42*
1 x GLASS RETAINER ASSY, 3n1 SML#   w/GLASS & GASKET
1 x FUSE HOLDER- GS2 #   NO FUSE
1 x PILOT BRACKET (DVS/31/564HO)
1 x KNOB (WOOD) w/ SCREW, BLK FWI#   3/8 i.d. w/HOLE - PAINTED BLK
1 x PILOT SHIELD, 864HO-NB   DANCING/DIAMOND FYRE BURNER
1 x COMPRESSION TUBE FTNG   TEMPEST, WALL MNT/ BASE ASSY
1 x WIRE HRNS, BLOWER, FWI #   FLUSH WOOD INS
1 x EXHAUST STARTER TUBE C/W FLANGE 3" X 5"
1 x VALVE, NG DV, RBRTSHW 96 & UP#   ONLY FOR NATURAL GAS FUEL
1 x PAINT, METALLIC BLACK 3oz#   SPRAY CAN
1 x FASTENER - SCW 6 PK   THREAD CUTTING - 10-24 x 1/2"
1 x VALVE TRAY ASS'Y, NG 430 GSR2   NO BURNER - GSR2
1 x ENVIRO PELLET TOOL SERVICE KIT
1 x STUD PLATE/HW ASSEMBLY   SM PI/PS
1 x GLASS, SMALL LOPI#   8-7/8 x15-3/8" GSKT NOT INCLD
1 x N/S : TRANSMITTER (HANDHELD)
1 x WIRE HRNS PIG-TAIL, MALE   3-PIN, JNCTN BOX
1 x 25864 AUGER COVER, MANUAL FEED RATE 1
1 x VALVE REGULATOR, NG RS#   ROBERT SHAW (0.9-3.5")
1 x CAST GRATE - AC
1 x 25 : CLAMP FOR WINDOW
1 x SPACER, 1/4 dia. x .312 - BLK   4 PACK - VARIOUS UNITS
1 x PRES RELIEF DOOR w/ GSKT   VARIOUS MODELS
1 x ACCESS CVR PLATE, ELEC   w/WIRE CLAMP
1 x FLEX PIPE, 3/8"od x8" BLK   NO-FITTINGS
1 x ORIFICE, BURNER - No. 37   1.180" BRASS HEX (.104 dia)
1 x BLOWER ASS'Y, LEFT - FW#   FW/FWP/LFW INSERTS
1 x 14 : PIEZO IGNITOR
1 x SNAP-DISC BRACKET (NEW STYLE)   UNIVERSAL - GAS/PELLET
1 x GLASS w/GASKET - CYP/GRN SIDE#   CYPRESS / GREENFIELD
1 x SWITCH(RKR), ON/OFF - LARGE#   PEL 90-96/GAS, 93-95 EXCEPT DV
1 x LOG, FRONT RIGHT LS36/79 (#3)#   CLASSIC OAK
1 x FUSE, 3.15AMP 5-PK GS2#   GS2 CONTROL BOARD
1 x LEVELING BOLT[4], STEEL/PWR LEG#   w/RUBBER TIP - 3/8-16x1.5"
1 x Vacuum Switch
1 x BLOWER ASSY, RT DVS/DVL EG INS#   EMBER-GLO MDLS
1 x 42" Bi-Fold Door, Brushed Brass
1 x BRKT, FAN MOUNTING   EDEN / NORTHFIELD
1 x SNAP DISC HOLE COVER   w/SCREWS & GSKT
1 x 3 Hole Grommet
1 x MEDIA TRAY ASS'Y, 564 DF   SERVICE PART
1 x Hinge, Door - P22, P1000PB, P1000PW (PB/PW) 1
1 x PILOT, RETRO KIT SIT DVL INS#   ZC 1998-99 (NON-EMBERFYRE)
1 x FUSE HOLDER
1 x FLEX PIPE, 3/8"od x 12 BLK   NO FITTINGS
1 x ORIFICE, BURNER - No. 49 #   1.180" BRASS HEX (.073 dia)
1 x STUD PLATE/HW ASSEMBLY   SM PI/PS
2 x INJECTOR, PILOT - LP (#35) #   USE w/SIT PILOT ONLY
1 x SILICONE HOSE (ALL PELLET)(RED)
1 x EF2/EF3/WIN/MER IGNITION BURN POT
1 x BRICK RETAINER (2) w/SCW#   UNIVERSAL PART
1 x Glass Rt-ewf36b
1 x Gas Conversion Kit Electronic Ignition - NG to LP
2 x LOG SET WITH EMBERS
1 x AIR DEFLECTOR, NG - 864 HO EF   EMBERFYRE BURNER - NG
1 x GSKT KIT, GLASS CLIP - FWP/LFW#   GLS CLIP GSKT(2) - ARCH & RECT
1 x GSKT, GLASS, 75" - FWP/LFW#   GSKT ROPE, 1/4" dia, BLACK
1 x RHEO w/OFF, SQUARE(MM)#   w/NUT & WASHER
1 x KNOB (PHENOLIC), 3/4" dia   1/4-20 THREAD - BALL SHAPED
1 x STUD PLATE (564/864)#   SS/DF/TRV/HO/ST
1 x ACCENT LIGHT COVER   CYPRESS/GREENFIELD
1 x FACE, 564 RECT DOUBLE DOOR*   BARRIER COMPLIANT
1 x Snap Disc Control
1 x PILOT ASSY, NG, PSE 3-WY# � w/ GSKT, 616/430
1 x 3/4 ID AUGER COLLAR W SCREW (EF2/3/MER)(PRE JULY 01/08)
1 x LBL, CONTROL - VAR.SPD. BLOWER   SERVICE PARTS
1 x LOG, FRONT LEFT - LS31#
1 x GLASS w/ FRM, SPRG PIN ASSY#   33DVi/RAD LG/DVL INS 2005+
1 x OUTSIDE AIR DUCT ASSY   UNIVERSAL OUTSIDE AIR KIT
2 x SNAP-DISC BRACKET (NEW STYLE)   UNIVERSAL - GAS/PELLET
1 x CONVECTION AIR DEFLECTOR   DVL-EFII /33DVi / DVL-GS
1 x FIRESTOP ASS'Y   3615,4415,4415ST,6015 HO & 564 SS
1 x BURNER ASSY, FRONT 564SS#   2007-2019
1 x ORIFICE, PILOT LP - .016 #   ROBERT SHAW
1 x 892014 RETAINER, LOUVER 2
1 x STEPPER MOTOR, NG GS2#   GS2/GSR/GSR2 - 3.5"-1.6" WC
1 x SCREEN, CLEARFIRE, FRONT CYP/GRNFLD   24.500 x 16.250
1 x FUSE HOLDER- GS2 #   NO FUSE
1 x FACE SCREW, GOLD, 1" (6)   STANDARD LENGTH - 1/4-20 PHPMS
1 x Instruction Manual P36D
1 x SWITCH, LITE LED w/SUPPORT   SERVICE PART
1 x FLUE CLLR WLD ASS'Y w/GSKT   564 SS/21 TRV
1 x DIFFUSER, w/ SCWS   VARIOUS MODELS
1 x POWER CORD, w/MOLEX (18 GA) #   UNIVERSAL - WOOD & GAS
1 x EF3 FPI HOPPER COVER (POST JAN01/ 08)
1 x PILOT TUBE WITH FITTINGS
1 x FUSE, 3.15AMP 5-PK GS2#   GS2 CONTROL BOARD
1 x DOOR HANDLE ASSY, v.1#   LFW/FWP/CAPE COD INS
1 x AIR DEFLECTOR - COMBST AIR   31 DVi INSERT
1 x RHEO w/OFF, SQUARE(MM)#   w/NUT & WASHER
1 x Firebox Baffle
1 x 1/8 Inch Fiberglas 2 X 4
1 x GLASS w/GASKET - DVS INSRT/ZC#   12-11/16" x 24-11/16"
1 x BURNER ASS'Y, DF - FRONT   GSR-GSR2
1 x GRILL, 564 LOUVER BLACK*
1 x SPACER, 1/4 dia. x .312 - BLK   PACK OF 15
1 x 7 : CONTROL VALVE NG - MANUAL
1 x PIEZO IGNITER, ALL mv GAS UNITS #   w/ RETAINING NUT
1 x 3 FLAME PILOT HOOD
1 x CNTRL MODULE, BASIC FUNCTION#   GSB2 MODELS
1 x MANTEL SHIELD*
1 x WIRE HRNS, POWER-ACCENT LIGHT#   PROVIDES AC POWER CONNECTION
1 x Combustion Air Assy Serv
2 x GLASS w/GASKET - 864 HH/HO   SERVICE PART
1 x SPACER, 1/4 dia. x .312 - BLK   PACK OF 15
1 x Cast Mount Bracket (Each)
1 x THERMO-COUPLE (10Pk) - SIT#   USE w/SIT PILOT ONLY
1 x PILOT ASSY, NG, PSE 3-WY# � w/ GSKT, 616/430
1 x ASHBOX, PELLET INSERT - LARGE#   2002 & UP
1 x FLUE STARTER SCTN (8" od)   w/GASKET
1 x Cam Latch – P23, P1000PWA, P24 1
1 x Warm Red Split Herringbone
1 x FLEX PIPE, 3/8"od x 16"   NO FITTINGS
3 x 17 : KNOB EXT HI/LO
1 x GSKT TAPE, DR 50' FPX WD#   5/8"x1/16" WHT, BULK 50'
1 x FLUSH CONTROL PANEL - NO DECAL
1 x Damper Steel Hndl/scr-bni
1 x Heat Exchange Tube Cleaning Rod - P2000I 1
1 x FASTENER - BOLT 5 PK   HHCS 1/4-20 x 1/2"
1 x HANDLE ASSY, RIGHT, 36/44 A/E#   FPX WOOD FIREPLACES
1 x HEAT EXCHANGER ROD W/KNOB
1 x SHUT-OFF VALVE#   VARIOUS GAS UNITS
1 x FASTENER - KEPS NUT, 10 PK   8-32
1 x BURNER ASSY, REAR - 564 SS#   2007-2019
1 x Form Face Rad 32
1 x STEPPER MOTOR, NG GS2 4-PK#   1.6"-3.5" WC
1 x GSKT TADPOLE,3/8 x3/4 PSA BLK#   12' BULK LENGTH
1 x On/Off Switch Assembly Complete
1 x ORIFICE, BURNER - No. 48   1.180" BRASS HXE (.076 dia)
1 x WIRE HRNS PIG-TAIL, MALE   3-PIN, JNCTN BOX
2 x THERMO-PILE (10-PK) - RS#   ALL BV/DV/ w/ ROBERT SHAW PILOT
2 x Pilot Tube, Sit 2.182.280
1 x TOOL, GLASS LATCH/RESTRICT0R #   VARIOUS GAS AND PELLET
1 x TRIM, ONE PC PANEL, 34 X 44*   DVL, 616, RAD LG, FL WD M
1 x CAST TOP ONLY (NO GRATE) - AW
1 x LEVELING BOLT[4], CST/BRS LEG#   1/4-20 w/RUBBER TIPS
1 x THERMO-COUPLE - SIT #   USE w/SIT PILOT ONLY
1 x REMOTE RECEIVER, GS - SIT#   TIMED FAN FUNCTION
1 x FLUE RESTRICTOR, LINEAR PB   24/42/54/72 MV/GSB2
1 x 3-foot Chimney Section
1 x STEPPER MOTOR, NG GS2 4-PK#   1.6"-3.5" WC
1 x Flange,lt Side Srrnd-mnt
1 x Front burner tube
1 x GSKT TADPOLE,3/8 x3/4 PSA BLK#   12' BULK LENGTH
1 x BURNER ASSY, DANCING FYRE#   33 DVi/CYPRESS/DVL GSR/GSR2
1 x WIRE HRNS, POWER-ACCENT LIGHT#   PROVIDES AC POWER CONNECTION
1 x GSKT, DOOR 7/8" x 85" BLACK#   ROPE - PS/PI 1997-2012
1 x 16 : NON COMBUSTIBLE BOARD
1 x GSKT, INTAKE - 864   864 HH/ST/TRV
1 x PILOT ELECTRODE COVER TUBE   SILICONE TUBE
1 x Sterling Fire Screen Scroll & Arch / PC - Graphite
1 x LOG EMBERS, LARGE BAG #   12oz. BAG
1 x AUGER DRIVE COLLAR, 1997 & UP   VARIOUS MODELS
1 x DIFFUSER UNIVERSAL   18 GA ALZ - 3.639 x 3.232
1 x RUBBER MOTOR STOP - 2-PK#   ALL PELLET - 1990 to PRESENT
1 x PILOT ORIFICE, LP - 0.014 PSE#   PSE PILOT ASSY
1 x FASTENER - SCW BLACK 6 PK   PHPSMS, #8 x 3/8"
1 x FLUE ADAPTER, DV 8" TO 6-5/8"*   810004994
1 x CONVECTION DUCT, DVS (GS)   SERVICE PARTS
1 x BLOWER, LT, GAS INS - 2005+ #   EF-II/DVS/DVL/31/33
1 x CONTRL MODULE, FAN - GRNSMRT#   w/POWER CORD
1 x AIR CONTROL SHUTTER, REAR   CYP,GRNFLD,864HO, 33DVi,DVLGSR
1 x ALUMINUM HOSE BARB (ALL PELLET)
1 x Inner Front Latch Kit-oak
1 x BURNER, RADIANT LG   RADIANT LARGE
1 x CONV PARTS, LP - SIT/PSE   33DVi / CYPRESS-GS
1 x WIRE HRNS PIG-TAIL, FEMALE   3-PIN, PWR DUCT KIT
1 x BLOWER, RT, GAS INS - 2005+ #   EF-II/DVS/DVL/31/33
1 x PAINT, METALLIC BLACK 3oz#   SPRAY CAN
1 x PILOT ASSEMBLY LP
1 x Venturi/gasket/screws Ass
1 x LIGHT BULB, HALOGEN 5PK#   35watt, T4, 120volts, 380 Lumen
1 x HINGE PIN, STEEL - 4 PK   3/16 dia x 3/4 (BLK ZINC)
1 x FASTENER - HEX NUT 10-24 5PK   CENTER-LOCK w/ WASHERS
1 x PILOT, RETRO KIT - PSE 616#   NG/LP 3-WAY - 616 GSR/GSR2
1 x PAINT, METALLIC BLACK 3oz#   SPRAY CAN
1 x FUSE HOLDER, w/o FUSE #   INCOMING POWER - ALL PS/PI
1 x WIRE/CABLE HANGER CLIP   SERVICE PART
1 x PILOT ORIFICE, LP - 0.014 PSE#   PSE PILOT ASSY
1 x EXHAUST ADAPTER, SMALL PELLET   CAST ALUMINUM
1 x BRKT SET, FACE - L/R   RADIANT LARGE
1 x PILOT AIR SHIELD#   CYP/33DVi/ DVL-DF
1 x HINGE ASS'Y, DOOR - LG/SD BLK   SOCKET & PIN
1 x STUD PLATE/HW ASSEMBLY   SM PI/PS
1 x Burner Tube Assembly - NG/LP
1 x CABLE CLAMP, ROMEX   POWER CORD CLAMP
1 x Tl/dvc/win Glass Clip-4
1 x ON/OFF SWITCH w/EXTN WIRES   DVL/DVS INSERTS
1 x EMBERS, ROCK-WOOL 50 grams#   8X10 BAG
1 x VACUUM TUBE, SILICONE - 6ft.   BULK LENGTH OF 6 FEET
1 x SNAP-DISC - 120deg NO#   NORMALLY OPEN
1 x PRES RELIEF DOOR w/ GSKT   VARIOUS MODELS
1 x TOOL, GLASS LATCH/RESTRICT0R #   VARIOUS GAS AND PELLET
1 x SNAP-DISC - 200deg NC #   NORMALLY CLOSED - HOPPER DISC.
1 x FLEX PIPE, 3/8 x 8-1/2#   w/ ORIFICE MANIFOLD
1 x CONV PARTS, LP RADIANT LARGE   SERVICE PART
1 x FDR FINES SHIELD-10 PACK
1 x GLASS w/GASKET - 864 TRV/ST#   TEMPERED GLASS
1 x GLASS CLIP (4), AVA #   VARIOUS MODELS WD/GS/PEL
1 x Ash Pan Door, Complete
1 x 83550 PUSHNUT FASTENER (.125 DIA. STUD) 2
1 x ANDIRON, WROUGHT IRON*   864 & CLEAN FACE
1 x CORD RESTRAINER - LRG (BLACK)   AC POWER CORD
1 x Hopper Lid W/hinge & Knob
1 x FLUE STARTER SCTN (8" od)   w/GASKET
1 x Mill Pac Direct Vent Pipe Sealant - Tube
1 x BRICK-CUT, 6-1/2 x 2-1/2(#62)
1 x Burner Tube NG/LP 99/00/01/02/03/04
1 x CNTRL MODULE, BASIC FUNCTION#   GSB2 MODELS
1 x GLASS w/GASKET - 616   616 GSR INSERT
1 x CONV PARTS, NG - SIT #   21DV/RV/HDAWY/ SWTDRMS - EF
1 x Colonial Flat Screen 50" X 36"
1 x HEARTH PLATE - 864 TRV GS#   SERVICE PART
1 x RHEO w/OFF ASS'Y, SQUARE(FM)#   1-FEMALE, 1-MALE CONNECTOR
1 x Bottom - Mmk
1 x GSKT (2), GLASS CLIP#   VARIOUS MODELS
1 x Spring Latch
1 x FRAMING STUD, 4-PK 6015   NON-COMBUSTIBLE
1 x PILOT ASSY (5-Pk), NG PSE 2-WY#   UNIVERSAL
1 x GSKT TAPE, 1/4" X 1/16" WHT   10' BULK LENGTH
1 x FUSE, 6AMP, 5-PK CNTRL BOARD#   1997 TO 2005 PS & PI 5 PK
1 x SCREEN, FRONT, CONVT AIR   CYPRESS/GREENFIELD
1 x LOG, LEFT TWIG(LWR) LS36/79 (#8)#   CLASSIC OAK
1 x Heat Shield Top
1 x ORIFICE, BURNER - No. 49 #   1.180" BRASS HEX (.073 dia)
1 x Exhaust Pipe Assy
1 x SMS GROUND WIRE
1 x HW PACK, TRADTNL 616 GSR/GSR2   LS55 LOGSET
1 x INJECTOR, PILOT - NG (#62)#   USE w/SIT PILOT ONLY
1 x Oak Retainer Plate W/hdwr
1 x LOG, FRONT LEFT (#3) - LS43#
1 x Clip Reflective Panel
1 x 83508 5/16-18 X 3/4 BOLT 1
1 x LOG SUPPRT ASS'Y, LEFT   (33DVi/CYPRESS)
1 x Twisted Rope Fatwood Caddy / PC - Graphite
1 x BLOWER MNT BRKT, SML PELLET   1997 PS/PI
1 x PIPE ADAPTER, 3/8 FLARE x3/8M   3/8 FLARE x 3/8 MPT - 1/4 FPT
1 x LOG EMBERS, SMALL BAG #   4 oz. bag
1 x GLASS w/FRAME - 864 TRV/ST v2#   FINGER-PULL LATCH
1 x WIRE HRNS PIG-TAIL, MALE   3-PIN, JNCTN BOX
1 x FIREBACK, RADIANT LG BRICK*
1 x ORIFICE, BURNER - No.47   SERVICE PART
1 x FLEX PIPE, 3/8"od x8" BLK   NO-FITTINGS
1 x FLEX PIPE, 3/8"od x 12 BLK   NO FITTINGS
1 x EMBERS, ROCK-WOOL 5 gram#
1 x LOG EMBERS, SMALL BAG #   4 oz. bag
2 x 83542 NYLON LOCK NUT 2
1 x LOG EMBERS, SMALL BAG #   4 oz. bag
1 x PILOT ASSY, NG PSE 2-WY# � UNIVERSAL
1 x LIGHT SOCKET, HALOGEN   616/564 HO/CYPRS/GRNFLD
1 x RETROFIT, AUGER FLIGHT INSP   COVER - ALL PS.PI 1998 & UP
1 x FUSE, 3.15AMP 5-PK GS2#   GS2 CONTROL BOARD
1 x BRKT, STRAIN RELIEF RAD INS   Lg & Sm - BLWR 99000192
1 x AC PWR ADAPTER#   RADIANT I
1 x Log Left 300dvb Service
2 x CONVECTION DUCT (DVL GSR/33i)   w/ FASTENERS
1 x SNAP-DISC - 200deg NC #   NORMALLY CLOSED - HOPPER DISC.
1 x MILL-PAC BLACK HI-TEMP SEALANT   1-TUBE, (10.3oz)
1 x VALVE NG w/ Stepper Motor
1 x FASTENER - HEX NUT 5-PK   1/4-20 - CENTER-LOCK
1 x RHEO w/OFF, SQUARE(MM)#   w/NUT & WASHER
1 x Touch Screen Full Fuction
1 x FLUE CLLR WLD ASS'Y w/GSKT   564 SS/21 TRV
1 x Log Set - Complete
2 x VALVE, LP DV, '96-00 - DEXEN#   NO TCI BLOCK
1 x GSKT, HOPPER, 1/2"x3/16"x80"   SILICONE FOAM TAPE (LRG PS/PI)
1 x MANUAL, EDEN - 2009   SERVICE PARTS
1 x PILOT AIR SHIELD#   CYP/33DVi/ DVL-DF
1 x 891121 HOSE, SILICONE 2
1 x Allen Key 3/16'' 99
1 x HOPPER AND LID-SALE
1 x Pc45/61/68 Snout-sales
1 x PILOT TUBE, SIT#   USE w/SIT PILOT ASSY ONLY
1 x THERMOSENSOR
1 x Versa Grate Bracket Assembly
1 x STUD PLATE (564/864)#   SS/DF/TRV/HO/ST
1 x 40569 Door, Rectangular-Large 1
1 x GLASS w/FRAME - DVL INS/ZC 98#   2003 - 18-1/2" x 29-1/8"
1 x MOISTURE METER#   FIREWOOD MOISTURE
1 x AIR DEFLECTOR, DVS GSR ONLY   MUST USE WITH LS52 LOGSET
1 x LOG, END LEFT - LS60 (#4)#   430 TRADITIONAL
1 x PILOT ELECTRODE SLEEVE, BLK#   BULK LENGTH - 6 FEET
1 x POWER CORD, w/MOLEX (18 GA) #   UNIVERSAL - WOOD & GAS
1 x FLEX PIPE, 3/8"od x 46"   TEPMEST TORCH/616 INSERT
1 x FACE SCREW, BLACK #   BLACK, 1"-1/4-20 PHPMS - 6 PK
1 x SWITCH BOX (CYP/GRN)   w/SCWS, NO SWITCH
1 x 83340 Tinnerman Clip, 1/4-20 8
1 x GSKT, COMB BLOWER (BODY), SML#   7.884" x 6.483" x 1/8"
1 x MAGNET w/SHEATH   1.000 x .750" 1/4" THICK
1 x CONTROL PANEL, DVS/DVL INSERT,   DVL ZC ('03)
1 x CNTRL PANEL, BASIC   864/564 GS2
1 x Tl/dvc/win Paw Bolt-modif
1 x FASTENER - KEPS NUT, 10 PK   8-32
1 x Control Box Ng, Reprogram
1 x REMOTE, BLK WALL-MOUNT#   ALL GS/GSR/GSR2 MODELS
1 x PILOT ORIFICE, LP - 0.014 PSE#   PSE PILOT ASSY
1 x STUD PLATE/HW ASSEMBLY   SM PI/PS
1 x GRILL, 564 MISSION BLACK*
1 x 2 : PILOT - SIGNATURE COMMAND NG
1 x Speaker Terminal--Thermostat
1 x MAGNET w/SHEATH   1.000 x .750" 1/4" THICK
1 x ASHPAN, 1990 PELLET STOVE #   w/SINGLE LATCH & KNOB
1 x PILOT ASSY (5-Pk), NG PSE 2-WY#   UNIVERSAL
1 x OUTSIDE AIR DUCT, PELLET#   1.750" x 25.0'
1 x BURNER SET-UP PACK, 864HO DIA   96900142, 864 DF BURNER
1 x PILOT SHIELD - UNIVERSAL#   VARIOUS MODELS
1 x FIREBACK, 564 SS BRICK/HERR*
1 x GLASS w/FRAME - DVL INS/ZC '04   KEY LATCH - 2004
1 x Front Control Cover Plate 99/00/01/02/03/04
1 x ORIFICE, PILOT - NG (.021)#   ALL 93 & UP GAS w/RS PILOT ASY
1 x KNOB (PLASTIC), RHEOSTATS #   BLACK w/WHITE LINE - GAS/WOOD
1 x PAINT, METALLIC BLACK 3oz#   SPRAY CAN
1 x FIREBACK, LG FS TOP ENAM BLK*   CYPRESS / GREENFIELD
1 x FASTENER - KEPS NUT, 10 PK   8-32
1 x FLUE ADAPTER, DVL INS*   6-5/8" TO 3"-4", # 810004548
2 x GSKT TADPOLE,3/8 x3/4 PSA BLK#   12' BULK LENGTH
1 x Log Bdv300 Rear For Servi
1 x GSKT (10pk), MIXING TUBE#   VARIOUS MODELS
1 x DRAFT (FLOW) SWITCH#   ALL PS/PI/EXTREME
1 x GSKT TADPOLE,3/8 x3/4 PSA BLK#   12' BULK LENGTH
1 x CABLE CLAMP, ROMEX   POWER CORD CLAMP
1 x VENT, 21RV/564 SS - 3.9" LONG*   810004987
1 x ORIFICE, PILOT LP - .016 #   ROBERT SHAW
2 x ORIFICE, BURNER - No. 45   1.180" BRASS HEX (.082 dia)
1 x EMBERS, ROCK-WOOL 50 grams#   8X10 BAG
1 x REMOTE RECEIVER, GS - SIT#   TIMED FAN FUNCTION
1 x EMBERS, ROCK-WOOL 50 grams#   8X10 BAG
1 x BURNER, LEFT - 36CF P/ST   PIER/SEE-THROUGH
1 x TRIM, FRONT BOTTOM - 564   PRE SCREEN MODELS
1 x Firebox Baffle/Restrictor Assembly
1 x Oak/tl3 Ss Brick Clip Set
1 x Terminal Block
1 x Leg Cast Timberline Brown
1 x FACE, 564 SHADOWBOX BR NKL-V*   FOR BARRIER SCREEN UNITS ONLY
1 x BURNER ASS'Y, DF - REAR#   GSR-GSR2
1 x 83445 CARRIAGE BOLT 6
1 x DRAFT (FLOW) SWITCH#   ALL PS/PI/EXTREME
1 x LIGHT BULB, HALOGEN 5PK#   35watt, T4, 120volts, 380 Lumen
1 x GSKT,COMB BLWR MOTOR, LARGE#   7" DIA.
1 x PILOT ORIFICE, NG - 0.020 PSE#   NG PILOT ORIFICE
1 x LIGHT BULB, HALOGEN 5PK#   35watt, T4, 120volts, 380 Lumen
1 x GRMT/SPACER (4) - BLOWER#   1997+ PEL/1995+ GAS
1 x GLASS LATCH - FINGER-PULL#   vr.2, 2007+
1 x BURNER, REAR LOG SHELF#   GAS FS - DV/BV 1996-99
1 x FAN KIT, 864ST   COMPLETE ASSEMBLY
1 x Handle Asy-oak
1 x AIR DEFLECTOR, NG GRN v.2   GREENFIELD - GS/GS2
1 x 12 : 1/4-20 HEX NUTS
1 x PILOT SHROUD, RS/SIT #   1996 - 99
1 x MOTOR STOP KIT   UNIVERSAL
1 x GLASS w/FRAME - 864 HO 2010   FINGER-PULL LATCH
1 x GSKT TADPOLE,3/8 x3/4 PSA BLK#   12' BULK LENGTH
1 x SNAP-DISC - 120deg NO#   NORMALLY OPEN
1 x FASTENER - SCW BLACK 6 PK   PHPSMS, #8 x 3/8"
1 x SIENNA PAN BURNER (ONLY)
1 x BLOWER, LEFT - 616 /430#   90 cfm, 3000 rpm/ GS-GSR-2
1 x RESTRCTR CNTRL ASSY   DVL/33 INSERT
1 x BRICK RETAINER, DBL (1) 4237   4237 GSR2
1 x PILOT ELECTRODE, 24" - PSE#   PILOT FLAME SENSOR - PSE ONLY
1 x ASHPAN ASS'Y, 1997 SMALL PI   NO LATCH OR KNOB REQUIRED
1 x STEPPER MOTOR, LP GS#   GS1/GSR/GSR2 - 11"-2.9" WC.
1 x PAINT, METALLIC BLACK 3oz#   SPRAY CAN
1 x EMBERS, ROCK-WOOL 50 grams#   8X10 BAG
1 x PILOT TUBE, RS #   EXCEPT 95 36DV & DEXEN VALVE
1 x AIR DEFLECTOR, NG - 864HO
1 x LIGHT ASSY-564/864 GS   (ACCENT) SS/TRV GREENSMART
1 x EMBERS, ROCK-WOOL 5 gram#
1 x LOG EMBERS, LARGE BAG #   12oz. BAG
1 x FLEX PIPE, 3/8 x 8-1/2#   w/ ORIFICE MANIFOLD
1 x INJECTOR, PILOT - LP (#35) #   USE w/SIT PILOT ONLY
1 x 27 : FIRESCREENS
1 x TRIM, FRONT ASSY - 564   ALL MODELS/ SS & DF
1 x VALVE, SPLIT-FLOW v.2#   DUAL-BRNR CNRL - GSR/GSR2
1 x Cast Door Hinge With Pin
1 x POWER CORD, w/MOLEX (18 GA) #   UNIVERSAL - WOOD & GAS
1 x Gasket Inlet Pipe 8.875x8
1 x EMBERS, ROCK-WOOL 50 grams#   8X10 BAG
1 x GSKT, DOOR 7/8" x 50' BLACK#   ROPE - MISC. GAS/WOOD/PELLET
1 x COVER PLATE, OUTER 21TRV   ALL TRV MODELS
1 x PIPE ADAPTER, 3/8 FLARE x3/8M   3/8 FLARE x 3/8 MPT - 1/4 FPT
1 x ON/OFF SWITCH w/EXTN WIRES   DVL/DVS INSERTS
1 x BLOWER, RT, GAS INS - 2005+ #   EF-II/DVS/DVL/31/33
1 x FRBK, CAST DVL INS BRICK#   DVL INSERT 1998-2005
1 x CNTRL/ACCESS DR ASS'Y,INSERTS   31/33DVi, DVS/DVL GS-GS2
1 x Valve Assembly - NG
1 x Burner Assy Hb
1 x FUSE, 3AMP, 1/4 dia 5-PK#   250-AVC, GLASS TUBE, 3AG
1 x Insulation, End - Mntplr
1 x LOG EMBERS, LARGE BAG #   12oz. BAG
1 x Embers - Bag
1 x BURNER EF CAST BTM - LP/NG   BERK/PRA - 2005-07
1 x BURNER, PINS - 5/16" x 1" (2)   EF BURNERS - 2000-08
1 x SHUT-OFF VALVE, GAS#   1/2 INLT, 3/8 FLARE TUBE OUTLT
1 x FIREBACK, 564 HANDMADE BRICK*
1 x LIGHT BULB, HALOGEN 5PK#   35watt, T4, 120volts, 380 Lumen
1 x BLOWER, CONV, UNIVERSAL#   VARIOUS GAS/PELLET/PHD KIT
1 x COVE COVER, 36 DVXL - GLASS   SET OF TWO - 1998
1 x ANDIRON, WROUGHT IRON*   864 & CLEAN FACE
1 x PILOT TUBE, RS #   EXCEPT 95 36DV & DEXEN VALVE
1 x Pin, Door - Mntplr
1 x PIEZO IGNITER, ALL mv GAS UNITS #   w/ RETAINING NUT
1 x GSKT, COMB BLOWER(MOTOR), SML#   5.780" dia
1 x GSKT, BURNER TRAY - 564SS   17" x 10-7/8"
1 x HANDLE (WOOD), DOOR - AVALON#   1/2" id x 4.169" LONG
$162,321.87
Shipping Charges
Share Product
Share via E-Mail Share on Facebook Share on Twitter Share on Google Buzz Share on Digg