1 x | INSPECTN COVERS, w/SCREWS AUGER & UPPER BEARING |
1 x | WIRING KIT, INSERTS* GAS OR PELLET |
1 x | 300i Left Side Shld-sales |
4 x | 5/32" Allen key |
1 x | GSKT, EXH. CONNECTOR - 864 12.575" x 6" |
1 x | Iron Rail, Decorative Accent Trim, Aged Silver |
1 x | KNOB, EXTENSION (2.0") GS - FOR PROFLAME VALVE |
1 x | GLASS w/GSKT, FRONT - PIO/NEW 1997 & UP - 14.511" x 9.721" |
1 x | RHEO w/OFF, 90v, RECT (MM)# w/NUT & WASHER |
1 x | FASTENER - SCW BLACK 6 PK PHPSMS, #8 x 3/8" |
1 x | Fdr Cvr-sales |
1 x | GLASS w/GASKET - 564SS NO FRAME |
1 x | Electrode 42 Inch Long lead |
1 x | HW PACK, FIREBACK - G18 #170 |
5 x | Fan Thermodisc (60T12) 110 Degree |
1 x | BI-METALIC DAMPER# 616 GSR/GSR2/4415/3615/6015 |
1 x | 69528 Damper (891226) 1 |
1 x | MEDIA TRAY, 864HO DF DF BURNER KIT - 96900142 |
1 x | Flame Electrode |
1 x | VALVE CNTRL MNTG BRKT 3CF A/R |
1 x | PILOT ELECTRODE, 24" - PSE# PILOT FLAME SENSOR - PSE ONLY |
6 x | Glass U Clip - Flush Window (Each) |
1 x | GSKT KIT. MANIFOLD - DVL/DVS INSERT ONLY - 1 SET |
1 x | Louver Hardware Package - Gold |
1 x | N/S : WIRE ASSEMBLY MALE/FEMALE |
1 x | GLASS CLIP SCREWS (10), AVA # 10-24 x 1/2", BRASS/CAST DOORS |
1 x | LID STOP ASS'Y, SML PEL STOVE |
1 x | Pilot Tube, Sit 2.182.280 |
1 x | INJECTOR, PILOT - LP (#35) # USE w/SIT PILOT ONLY |
1 x | PANEL, INSULATION - 3" x 10' # Wood Burning Inserts |
1 x | RESTRICTOR PLT EXH (864 ST/HH) SERVICE PART |
1 x | GSKT, ASHPAN - 70" BLK TAPE 1/2" x 1/8" TAPE WITH ADHESIVE |
2 x | Fl Hd Ph 1/4-20x5/8-z |
1 x | PRES RELIEF DOOR, LFT(1) 864 864 TRV/HH |
2 x | Wire, Cc/cb 24 Scs |
1 x | POWER HEAT DUCT, EXTRA ROOM* 564 HO, 864's, 4237 & HO LINEARS |
1 x | LOG EMBERS, SMALL BAG # 4 oz. bag |
1 x | PILOT ELECTRODE COVER TUBE SILICONE TUBE |
1 x | LOG SUPPRT ASS'Y, RGHT (33DVi/CYPRESS) |
1 x | REMOTE HRNS PLUG, 3-LOOP# VARIOUS GAS MODELS |
1 x | 891471 LID WELDMENT 1 |
1 x | Bulk100-fhn 1/4-20 Z 5 |
1 x | PANEL, 616 ONE PC 34 x 44* |
1 x | CNTRL BRD DR & MOUNTING BOX RT SIDE PNL- LG & SM PI |
1 x | LOG, CENTER RT LS59(#7)# LODGE PINE |
4 x | Novasit Pilot Assembly - NG |
1 x | BAF, KAOWOOL BLANKET WEIGHT# PEN/790/745/796/996 |
1 x | Top Cast Seaside Sand |
1 x | ORIFICE MANIFOLD w/o ORIFICE 616/430 |
1 x | BLOWER ASSY LT - 864/564# FAN KITS 99000156/99000162 |
1 x | ASH CLEANOUT COVER(1) FOXFIRE/AGP INS 5.500 X 3.499 |
1 x | HOOD ASSY, O/A DUCT KIT# PELLET - SERVICE PART |
1 x | GLASS w/FRAME - BRK/PRA/TOL KEY LATCH - 2005 |
1 x | POWER CORD, w/MOLEX (18 GA) # UNIVERSAL - WOOD & GAS |
1 x | STEPPER, GSR LP CONV 4PK* GSR2 |
1 x | HINGE/BRKT ASSY, RIGHT, 44DV ARCH/RECT - ACCESS DOOR |
1 x | VALVE REGULATOR, NG SIT# S.I.T. 907.201 (1.6 - 3.5) |
1 x | Acc Cb Plate Asy-sales |
1 x | Oak/tl3 Dmpr Linkage-sale |
1 x | N/S : INNER TOP CHANNEL |
1 x | 40566 LEG, CAST IRON 4 |
1 x | GLASS w/GASKET - AST/LPI SIDE ASTORIA/LARGE PELLET INSERT |
1 x | EMBERS, ROCK-WOOL 5 gram# |
1 x | PAINT, METALLIC BLACK 3oz# SPRAY CAN |
1 x | 69192 FAD Bracket 1 |
1 x | PRESSURE RELIEF DR, w/GSKT NRTHFLD/564HO - GSR2 SCR |
1 x | Bulk100-uss Fw 1/4 Z |
1 x | SHL, TOP INS(TV), EDEN - MJLCA (TOP-VENT) |
1 x | 80531 RTD, PLATINUM 1 |
1 x | 1" KNOB |
1 x | Thermostat Extension |
1 x | BURNER ASS'Y, DF - REAR# GSR-GSR2 |
1 x | SWITCH, ROCKER, ON/OFF# SINGLE-POLE, VARIOUS GAS UNITS |
1 x | 38 Lwr Mtrshld-paint-sale |
1 x | EMBERS, ROCK-WOOL 50 grams# 8X10 BAG |
1 x | PIPE ADAPTER, 3/8 FLARE x3/8M 3/8 FLARE x 3/8 MPT - 1/4 FPT |
1 x | LOG, REAR - LS7 # PRA/CDR |
1 x | Insulation, 2 Range |
1 x | CERAMIC BRICK RETAINERS w/SCREWS - SET OF 2 |
1 x | WIRE HRNS, MAIN NO ON/OFF SWITCH |
2 x | WOODEN HANDLE WITH BOLT |
1 x | VALVE REGULATOR, NG SIT MOD S.I.T. 907.501 |
1 x | 18 : PILOT ASSEMBLY-MILLIVOLT CONTROL NG |
1 x | Oak Ul Outer Shld-sales |
1 x | FUSE -5AMP 5-PK CNTRL BOARD # DIAGNOSTIC BOARD 2006' |
1 x | 52 : HEX NUTS 1/4-20 |
1 x | CONV PARTS, NG - SIT # 21DV/RV/HDAWY/ SWTDRMS - EF |
1 x | INSPECTN COVERS, w/SCREWS AUGER & UPPER BEARING |
1 x | TOOL (PULL), LPI w/SPRNG HNDL# BYPASS PULL TOOL |
1 x | KNOB, PEL SWITCH BOX '90-96 # RHEO & FEED RATE SWITCHES |
1 x | FAN, LARGE FS GAS# CYPRESS / GREENFIELD |
1 x | AUGER BEARING, SML SET-SCREW # 1990-92 PS & PI |
1 x | PAINT, METALLIC BLACK - 12oz.# SPRAY CAN |
1 x | CLEAN OUT COVER PLATE - EXH NWPT PI-PS/PIO PI-PS/YANK |
2 x | Pressure Relief Top Frame Gasket (Each) |
2 x | MANTEL SHIELD* |
1 x | FLUE HANDLE - DVS/DVL INSERT SERVICE PART |
1 x | GLASS, SMALL LOPI# 8-7/8 x15-3/8" GSKT NOT INCLD |
1 x | Assy Center Brick Cottage |
1 x | 3-n-1 DOOR SHL HW SM/LG HARDWARE ONLY |
1 x | Burner Orifice #55 - LP |
6 x | Novasit regulator |
1 x | Robertshaw Regulator - LP |
2 x | FASTENER - KEPS NUT, 10 PK 8-32 |
1 x | GSKT TADPOLE,3/8 x3/4 PSA BLK# 12' BULK LENGTH |
4 x | # 37 burner orifice |
1 x | 1/4" x 1" Foam Tape (sold by inch) |
3 x | Duplex Receptacle - White |
2 x | Ng Sit Field Conv. Pilot |
1 x | Oak Air Adj Pipe-sales |
1 x | PIPE ADAPTER, 3/8 FLARE x3/8M 3/8 FLARE x 3/8 MPT - 1/4 FPT |
1 x | 48 : INNER BOTTOM SCREW,1/4 -20 X 3?IN |
1 x | BRICK, SET OF 8, FULL SIZE* |
1 x | GLASS, 1/4 CRUSHED CBLT 10LBS* |
1 x | 69870 Window Cover 2 |
1 x | 18 : TOP BISCUIT |
1 x | Canopy Form 36 Uf |
1 x | REMOTE HRNS PLUG, 3-LOOP# VARIOUS GAS MODELS |
1 x | ENAMEL TOUCH-UP - OXFORD BRN# 15 ml BOTTLE |
1 x | GLASS w/FRAME - DVS# 31DVi/DVS '06/RAD MD |
1 x | GSKT TAPE, 1/4" X 1/16" WHT 10' BULK LENGTH |
12 x | Novasit Pilot Orifice - LP |
3 x | N/S : FIREBRICK RETAINER BRACKET SCREWS |
1 x | CONV PARTS, NG - PSE/SIT 864TRV GS/GSR |
1 x | GSKT TADPOLE,3/8 x3/4 PSA BLK# 12' BULK LENGTH |
1 x | N/S : BRICK BRACKETS |
1 x | GSKT, CLEAN-OUT,AST/LG PI# EXHUAST DUCT COVER PLATE GSKT |
1 x | BLOWER, CONV, UNIVERSAL# VARIOUS GAS/PELLET/PHD KIT |
1 x | C21399 Hinge Pin, 5/16 x 1" 4" |
4 x | Power Cord - 120 Volt |
1 x | FLUE STARTER SECT FS GAS/ VARIOUS MODELS |
1 x | Valve Assembly - NG |
1 x | ORIFICE, BURNER - No. 33 SERVICE PARTS |
1 x | KNOB (PLASTIC), RHEOSTATS # BLACK w/WHITE LINE - GAS/WOOD |
1 x | HW PACK, BURNER - 864HO DF DIAMONDFYRE - 96900142 |
1 x | BURNER RETROFIT, EF-III# DVL INS '02 / DVLZC '03 |
1 x | SNAP-DISC - 230deg NC# |
1 x | WIRE HRNS PIG-TAIL, MALE 3-PIN, JNCTN BOX |
1 x | HANDLE ASSY, AVA w/BRASS CAM # & WOOD HANDLE - COMPLETE |
1 x | Grate Ss Odgsr42 |
1 x | Nut Hex 5/16-18 Blk |
1 x | GSKT (2), GLASS CLIP# VARIOUS MODELS |
1 x | REMOTE HRNS PLUG, 3-LOOP# VARIOUS GAS MODELS |
3 x | N/S : SPEED CONTROL W/KNOB |
1 x | CNTRL MODULE, BASIC FUNCTION# GSB2 MODELS |
1 x | N/S : AC ADAPTER - SIGNATURE COMMAND |
1 x | Liner Kit, Black Paint |
1 x | Hopper Lid - P24F 1 |
1 x | MAGNET w/SHEATH 1.000 x .750" 1/4" THICK |
3 x | Spark Generator Switch - Comes With Wire |
1 x | C98771 Insulation, Side 2 |
1 x | PILOT HOOD, 3-WAY SIT # NON-GREENSMART |
1 x | SPACER, 1/4 dia. x .312 - BLK 4 PACK - VARIOUS UNITS |
1 x | VALVE REGULATOR, NG RS# ROBERT SHAW (0.9-3.5") |
1 x | ORIFICE, BURNER - No. 56# 1.180" BRASS HEX (.0465 dia) |
1 x | GLASS LATCH - FINGER-PULL# vr.2, 2007+ |
1 x | BRICK RETAINER (2) w/SCW# UNIVERSAL PART |
1 x | Trim, P2000 Door 1 |
1 x | SPACER, 1/4 dia. x .312 - BLK 4 PACK - VARIOUS UNITS |
1 x | PILOT AIR DEFLCTR, 96-00DV/BV# SP/AVANTI/CHELAN/DVS |
1 x | BLOWER STUD PLATE 3615/4415/6015 - HO GSR2 |
1 x | GRMT/SPACER (4) - BLOWER# 1997+ PEL/1995+ GAS |
1 x | FIREBACK, 616 HANDMADE BRICK* |
1 x | SIT NOVA LP 50% TURN DOWN REG. PLATE (ALL GAS EXC 828/EG30/EG95 |
1 x | LOG EMBERS, SMALL BAG # 4 oz. bag |
1 x | Door handle, painted |
1 x | PILOT CAP UNIVERSAL |
1 x | GSKT TAPE, 1/4" X 1/16" WHT 10' BULK LENGTH |
1 x | Combustion Blower Transition – Aluminum 1 |
1 x | GLASS FRAME COVER, ARCH - 564 ALL MODELS PRE SCREEN |
2 x | SMS HPR SHLD SUPPRT-SALES |
1 x | Gasket, Docking |
1 x | 2a : THERMOPILE |
2 x | Bolt 5/16-18 X 2 Pkg-25 |
1 x | KNOB PHNLIC, ASHPAN W/SCRW PELLET & WD AIR CONTROL |
1 x | BOARD MOUNTING BRACKET 864 HH/ST |
1 x | BRKT, FACE, TOP - 864 SET OF 2 - VICTORIAN LACE |
1 x | MILL-PAC BLACK HI-TEMP SEALANT 1-TUBE, (10.3oz) |
1 x | MAGNET w/SHEATH 1.000 x .750" 1/4" THICK |
1 x | KNOB (PLASTIC), RHEOSTATS # BLACK w/WHITE LINE - GAS/WOOD |
1 x | MERIDIAN FPI REG PANEL - LEFT |
1 x | VENT, WOOD ZC LINER KIT 15* 810007979 |
1 x | SNAP DISC HOLE COVER w/SCREWS & GSKT |
1 x | GSKT, EXH. CONNECTOR - 864 12.575" x 6" |
1 x | 80472 Distribution Blower 1 |
1 x | TLC REAR HINGE-SALES |
1 x | GROMMET, BLACK RUBBER PACK OF 5 - SERVICE PART |
1 x | FLEX PIPE, 3/8 x 8-1/2# w/ ORIFICE MANIFOLD |
1 x | PAINT, METALLIC BLACK 3oz# SPRAY CAN |
1 x | RUBBER MOTOR STOP - 2-PK# ALL PELLET - 1990 to PRESENT |
1 x | LOG EMBERS, LARGE BAG # 12oz. BAG |
1 x | FACE, 32 PROFILE STNLS SCR EG* FOR DVS EMBER-GLO ONLY |
1 x | EMBERS, ROCK-WOOL 5 gram# |
1 x | FRONT PLATE w/SILK SCRN LBL 21/864ST/564/31/33 GS |
1 x | TEMP METER - HANDHELD# DIGITAL READER ONLY |
3 x | Blower Wire Harness 6ft |
1 x | AIRTUBE KIT, A-9/L-12 # 520-96/FLUSH BAY/1196 |
1 x | SIT NOVA NG 50% TURN DOWN REG. PLATE (ALL GAS EXC 828/EG30/EG95) |
2 x | FASTENER - SCW, 5 PK NAME TAG #10 x 3/8 RHW BLK ZINC |
1 x | PILOT ELECTRODE, SIT PILOT# SPARK ELECTRODE/STANDING PILOT |
1 x | FLEX PIPE, 3/8"od x8" BLK NO-FITTINGS |
1 x | AIRTUBE KIT, A-7 PEN(745/90)# 796 (SR.#7996 & UP) |
1 x | MANUAL, PELLET SERVICE - 1998 TROUBLE SHOOTING |
1 x | Cast Left/Right Side Comes With Legs ( 2 Per Side) - Seaside San |
1 x | Hndl Ash Pan-ww/enc |
1 x | GRMT/SPACER (4) - BLOWER# 1997+ PEL/1995+ GAS |
1 x | SHUT-OFF VALVE# VARIOUS GAS UNITS |
1 x | BAF SUPRT, REAR "T" # 520-96/FLUSH BAY/1196 w/DFLCTR |
1 x | HOPPER LID ASSEMBLY - PBAY |
1 x | Washer-d 5/16-4 Pack |
1 x | LOG EMBERS, SMALL BAG # 4 oz. bag |
1 x | LEG, CAST - BLACK (1)# w/ LEVELING BOLT/FASTENER |
1 x | STOVE PACK, 564HO GSR2 w/SCRN AVALON - 2014-2017 |
1 x | PAINT, METALLIC BLACK - 12oz.# SPRAY CAN |
1 x | BLOWER CONV, LEFT# FOXFIRE ONLY |
1 x | KNOB PHNLIC, ASHPAN W/SCRW PELLET & WD AIR CONTROL |
1 x | Lp Sit Field Conv. Pilot |
1 x | EFW DOOR TRIM - NICKEL |
1 x | GSKT KIT, GLASS CLIP - FWP/LFW# � GLS CLIP GSKT(2) - ARCH & RE |
1 x | Ddm Replacement Cable Kit |
1 x | FEEDER DUST TRAY-SALE |
1 x | AUGER TUBE, REPLACEABLE DEERFIELD/FOXFIRE |
1 x | GSKT, WIRE PLATE VARIOUS UNITS - 2" x 1-1/4" |
1 x | RECESSED CONTROL PANEL W/DOOR & LATCH NO DECAL-FS |
4 x | Two Way Gold Contact Switch |
1 x | 5 Pc Ball Handle - Round Base /Antique Brass/Black / Antique Bra |
1 x | EF3 FS STOVE TOP |
2 x | 2 : SCREEN PANEL |
1 x | N/S : JUMP RING - WASHER USED ON HINGE PINS - FOR ENAMEL STOVES |
1 x | CERAMIC BRICK RETAINERS w/SCREWS - SET OF 2 |
1 x | HOPPER LID HINGE, ALL 97 & UP PS/PI - w/SPACER & RIVETS |
1 x | Ceramic Baffle20-1/4x14-3 |
1 x | N/S : VENTURI GASKET |
1 x | 39 : RIGHT DOOR - CLASSIC BLACK |
2 x | 74 : DOOR HINGE STRIP |
1 x | Log Right 400dvb Service |
7 x | Blo Service Kit |
1 x | AUGER FLIGHT, 2000+ LRG PEL# 2" PITCH |
2 x | 6 : CS, HEX HD 1/4-20 X 3/4IN GR5-BLK |
1 x | MAGNET w/OUT SHEATH w/ MOUNTING HW |
1 x | Hndl Ashdoor-hardwood-blk |
1 x | AIR DIVERTER, 864 TRV GS2/GSR2 |
1 x | Ass'y Canopy 42 Rev C Se |
1 x | HEATSHIELD, VRT AIR DUCT COVR# � LARGE STEEL WOOD UNITS |
1 x | 100/105 Air Pump Bkt-sale |
1 x | 62 : ASHPAN COVER |
1 x | WOOD DOOR HINGE PIN CAP (SET OF 2) |
3 x | 7 : SCREEN WM42II42/WM42II-42A/HT/SX (22IN.W X 197/16IN.H) |
1 x | SCREEN, FRONT, CONVT AIR CYPRESS/GREENFIELD |
2 x | Ojop Door Latch |
1 x | GSKT CEMENT, 3oz. TUBE# w/BRUSH - UNIVERSAL |
1 x | N/S : FAN PLATE |
1 x | BURNPOT SCRAPER TOOL# AGP/FXFR/DRFLD |
1 x | N/S : BLOWER VELCRO PADS |
1 x | GLASS RETAINER ASSY, 3n1 SML# w/GLASS & GASKET |
1 x | CATALYTIC COMBUSTOR, HYBRID# LFW - 20-3/4 X 3-1/8" |
1 x | GLASS LATCH - FINGER-PULL# vr.2, 2007+ |
1 x | Air Manifold Fron-def |
1 x | Nailing Flange Bag |
1 x | Right Brick Service |
1 x | Glass-aspen |
1 x | 6 : RADIANT PLATE |
1 x | 55 : SECONDARY AIR PROBE ASSEMBLY |
1 x | ORIFICE, BURNER - N0. 1.25mm |
1 x | 60 : 8-32 X 2IN SLOTTED ROUND HEAD SCREW |
1 x | Black End Caps |
1 x | LOG EMBERS, SMALL BAG # 4 oz. bag |
1 x | FUSE, 6 AMP, 250v - 5-PK GS# GS FAN MODULE |
2 x | Trim Rail Brkt W/screw |
1 x | Refractory, Left, Lcuf32- |
2 x | Washer # 4 (Magnet Holder) |
1 x | Blower Motor Only |
1 x | 1 : DOOR HANDLE |
1 x | Brick, Common Lf3 |
1 x | Cs Hex Hd 3/8-16x1 Gr5-z |
1 x | VALVE REGULATOR, NG SIT MOD S.I.T. 907.501 |
3 x | Bracket, Brick Side Serv |
2 x | ORIFICE, PILOT - NG (.021)# ALL 93 & UP GAS w/RS PILOT ASY |
1 x | 83261 Lock Nut, 1/4-20 2 |
1 x | 55 : ASHDOOR HANDLE SHAFT |
3 x | Black 12oz Aerosol Spray |
1 x | FASTENER - SCW 25 PK HWSHMS,10-24x1/2 BLK - TYPE F |
1 x | LIFTING HANDLES, FIREPLACE # VARIOUS FIREPLACES |
1 x | PAINT, METALLIC BLACK - 12oz.# SPRAY CAN |
2 x | 41 : 5/16-18 X 5/16IN ALLEN SCREW |
1 x | Ass'y Canopy 36 Rev C |
1 x | ROLL-PIN TOOL# SERVICE PARTS |
2 x | Refractory, Right, Mcuf36 |
1 x | Canopy 36 Textured |
1 x | ORIFICE, BURNER - No. 58 # SERVICE PARTS |
4 x | T-stat Sensor W Wire Asse |
1 x | GRMT/SPACER (4) - BLOWER# 1997+ PEL/1995+ GAS |
1 x | 1200 / 1700 PEDESTAL KIT ASH DRAWER |
1 x | 39 : DOOR II,LEFT - ENCORE NC - SUEDE BROWN |
1 x | 88100 Exhaust Blower Gasket 1 |
2 x | Tubing304ss,3/4od,1/16w |
1 x | End Lt-int Ii 97-mdbl |
2 x | 84 : SPACER 3/8 X 1-Z |
1 x | POWER CORD, w/MOLEX (18 GA) # UNIVERSAL - WOOD & GAS |
1 x | Wiring Harness |
1 x | LIGHT, ACCENT ASS'Y, 864 HO 24" LEADS |
1 x | 31 : 3/8IN. DIA. X 2 LG HINGE PIN |
1 x | GROMMET, LG PEL BLWER, 5/8od w/FELT PADS & SPACERS - 5 PACK |
1 x | Radiant Face Assy, Gruf36 |
2 x | 1 : BRICK FILLER (4 PER F/P) |
1 x | PILOT ASSY, NG PSE 2-WY# � UNIVERSAL |
1 x | Faceplate Top/Stove Outer Top |
1 x | GLASS CLIP SET, TOP/BTTM# CAPE COD/RKPRT/DRFLD |
1 x | GLASS LATCH - FINGER-PULL# vr.2, 2007+ |
1 x | Thermostat Asy Vig |
1 x | FASTENER - HPER LID HINGE 4-PK DEERFILED/FOXFIRE - HOPPER LID |
1 x | EFW GLASS WITH TAPE |
1 x | 29 : LEFT SIDE - EBONY |
1 x | Refractory, Right, Lcuf36 |
1 x | Manifold Lt Air Def Nc |
1 x | Insert Lifter-bni |
1 x | PAINT, METALLIC BLACK - 12oz.# SPRAY CAN |
1 x | KIBBLE SUPPORT - 616 616 GSR INSERT |
2 x | POWER CORD, w/MOLEX (18 GA) # UNIVERSAL - WOOD & GAS |
1 x | GLASS FRAME, INNER - 864 HO/HH/ST/TRV |
1 x | Press/temp Gauge-bottom M |
1 x | 39 : RIGHT DOOR - GREEN |
1 x | Blower Kit Jakel |
1 x | REST. STOP/GUIDE w/BULLET LTCH DVS/31 INSERT |
1 x | HOPPER LID HINGE (LEFT) |
1 x | CNTRL MODULE, BRNR - GS1# ALL GS1 MODELS |
1 x | KNOB (PHENOLIC), 21/32" dia 3/4" TALL - 10-24 THREAD |
1 x | BURNER ASSY, FRONT 564SS# 2007-2019 |
1 x | Outer Back Asm Defiant Nc |
1 x | Nut # 4 (Magnet Holder) |
1 x | HANDLE - EXTENSION. HI-LO, SIT VALVE REGULATOR KNOB |
1 x | 80 : FLUE COLLAR - BORDEAUX |
1 x | LOG EMBERS, SMALL BAG # 4 oz. bag |
1 x | FASTENER - WING NUT 8-32 6-PK |
1 x | THERMO-PILE - SIT # SIT PILOT 1999-2009 |
1 x | Form Face Rad 32 |
1 x | MANUAL, RAINIER (OMNI) 2002 |
1 x | HARNAIS DE FILS - 2 FLAG ENDS |
1 x | ORIFICE, BURNER - No. 64 SERVICE PART |
1 x | MANUAL, 1250i (INSERT) - 2009 OWNER/INSTALLTION MANUAL |
1 x | CABLE CLAMP, ROMEX POWER CORD CLAMP |
1 x | THERMO-PILE - RS# ALL BV/DV w/ROBERT-SHAW PILOT |
1 x | 19 : FLUE COLLAR |
1 x | FUEL CAP SLIDE PLATE (x1) AGP FS/FXFR/DRFLD |
1 x | Refractory, Bottom Bwb400 |
2 x | FASTENER - HEX NUT 5-PACK# BRASS 3/8-16 - JAMB/TOP-LOCK |
1 x | 59 : FRONT - BORDEAUX |
1 x | 1200 / 1700 WOOD STOVE SCRAPER TOOL |
1 x | Junc Box Harness Bio-120 |
1 x | PELLET STOVE CLEANING BRUSH |
1 x | FASTENER - SCW 5 PK BUTTON HEAD, 1/4-20x3/8" |
1 x | HARNESS (UPPER LIGHT),564 "E"# DOUBLE-SOCKET |
2 x | Snap Disc Control (blower |
1 x | ONE LEG - PD |
1 x | Form Bracket Firebrick 62 |
1 x | Deflector,lt Hs-sm/med |
1 x | PIPE ADAPTER, 3/8 FLARE x3/8M 3/8 FLARE x 3/8 MPT - 1/4 FPT |
1 x | MEDIA, TUMBLED STN LIN 30LBS* |
1 x | HANDLE - EXTENSION. HI-LO, SIT VALVE REGULATOR KNOB |
1 x | FACE, 564 ARTISAN PAT BRONZE* |
2 x | DAUGHTER BOARD 120V (START#208161) |
1 x | EF3 DOOR COMPLETE - POLISHED NICKEL |
1 x | Wire High Temp Assy Femal |
1 x | DRAFT FLOW TUBE, 26" # ALL PELLET FS & INSERTS |
1 x | Retainer Glass-kanban |
1 x | 21A : HANDLE RECEPTICAL |
1 x | Hampton Logo Plate |
1 x | Bracket, Brick Top Servic |
1 x | SWITCH HOUSING S-ASS'Y, 564 E# SERVICE PARTS |
1 x | ROLL PIN - GLS LATCH SPRING PACK OF 5 - 5/32" dia x 3/4" |
5 x | Piezo Igniter |
1 x | HW PACK, PANEL - MOUNTING HW# SCREWS & NUTS - UNIVERSAL |
1 x | Air Tube,rear-int Ii '97 |
1 x | N/S : REFRACTORY SPACERS |
1 x | PIPE COVER PLATE (864 TRV) 864 TRV |
1 x | PRES RELIEF DOOR w/ GSKT # MULTIPLE GAS UNITS 1997 + |
1 x | Gskt,fibre-refractry Supp |
2 x | Leg Ii Set W/leveler-cdw |
1 x | 83379 Bolt, 1/4-20 x 1 2" |
1 x | Faceplate Hardware Package - Black Trim |
2 x | Plastic Switch Receptacle - Gang Box |
1 x | BLWR RESTRICTOR PLATE-2PK |
3 x | Transflo Blower - Motor Only |
1 x | GSKT TAPE, 1/4"x1/16" BLACK # 10' BULK LENGTH |
1 x | Insulation, End - Mntplr |
1 x | Grate Weldment |
1 x | Clip Glass-def 02 |
2 x | Screw # 4 (Magnet Holder) |
1 x | Glass Media, 5LB Bag, Reflective Black |
1 x | Right Side Cast - Charcoal Gray |
1 x | 4" Fan 2 |
1 x | DOOR CAM, BRASS # VARIOUS MODELS |
2 x | Bracket, Brick Front Ser |
1 x | BURNPOT HOLDER, 1991-96# DOES NOT INCLUDE BURNPOT |
1 x | SWITCH, ROCKER, ON/OFF# SINGLE-POLE, VARIOUS GAS UNITS |
1 x | ORIFICE, BURNER - No. 67 SERVICE PART |
3 x | Snap Disk Bracket Form |
1 x | Bulk100-fhn 5/16-18 Z 5 |
1 x | FIL 36 SOUFFLEUR |
1 x | SPACER, 1/4 dia. x .312 - BLK 4 PACK - VARIOUS UNITS |
1 x | 1200/1700 LEFT SHIELD ASSEMBLY |
1 x | Hanger Rod 32 For Servic |
2 x | Refractory Fire Brick Right |
1 x | BLOWER w/MTNG PLATE# 21 RV/TRV's |
1 x | FACE, 564 ARCH - BLACK* |
1 x | Slotted Cradle Gasket |
1 x | Outer Back Asm -cdwm |
1 x | 69953 DOOR ASSEMBLY 1 |
1 x | GSKT KIT, PILOT ASSY FOR NON-GREENSMART UNITS |
3 x | Burner Orifice # 54 - LP - Rear |
1 x | FLUE STARTER SCTN (8" od) w/GASKET |
1 x | 4 pc. Tool Set - Contemporary - Round Base - Black |
1 x | FDR SNOUT-SALES |
1 x | CNTRL/ACCESS DR ASS'Y - GSR2 DVS/DVL INSERT GSR-2 ONLY |
1 x | 83432 5/16-18 X 1-1/2 HX HD C/S PL 3 |
1 x | 10 : RIGHT SIDE (AFTER 9/97 NO OUTSIDE AIR SLOT) |
1 x | Air Switch (use part # 80621) 1 |
1 x | ORIFICE, BURNER - No. 50# SERVICE PART |
1 x | BRICK-CUT, 9 x 2-3/16 |
1 x | WIRE HRNS, REMOTE GSR-2# PRO-FLAME 2 - 20" |
1 x | WOOD DOWEL, PEDESTAL, AVA SML 23-1/8" LONG, 2-PK |
1 x | FASTENER - SCW 25 PK TSHMS, 10-24 x 1/2" BLK - ZINC |
1 x | Louver Bracket Right Form |
1 x | 29 : LEFT SIDE - BORDEAUX |
1 x | BURNER FLOOR EMBER LFT/RHT# 1 (SET) DVS I (GS) |
1 x | 1 : LOG SET COMPLETE |
1 x | FLUSH CONTROL PANEL - NO DECAL |
1 x | 88 : LEG EBONY |
1 x | 61 : 10-24 X 1/4IN PHILLIPS PAN HEAD SCREW |
1 x | 87 : FLUE COLLAR SUEDE BROWN |
1 x | DOOR, AVA, MED BLK, SML HINGE NO GLASS w/HANDLE (PEN/RAI) |
1 x | Novasit Pilot Assembly - LP *** |
1 x | Retainer, Brick (top) |
1 x | 5 Pc Tool Set - Shepherd's Hook |
1 x | N/S : REFRACTORY LEFT |
1 x | N/S : TAVERN BROWN BRICK - 21IN. |
1 x | 31 : GRATE BACK |
1 x | 83444 Lock Nut, 1/2-13 2 |
3 x | Novasit Electrode - Short |
1 x | Decal Control Panel - Rear 99/00/01/02/03/04 |
1 x | Caution&danger Label-10ea |
1 x | N/S : WEATHERED FIREBRICK-CENTER |
1 x | 6 Amp Fuse-set Of 5 |
1 x | Shaft Plinth Hndl-blk |
1 x | BLOWER, CONV, UNIVERSAL# VARIOUS GAS/PELLET/PHD KIT |
1 x | Vermiculite; Bag |
1 x | GROMMET, BLACK RUBBER PACK OF 5 - SERVICE PART |
5 x | Robertshaw Thermopile |
1 x | Gasket Vertical-aspen |
1 x | 59 : FRONT - CLASSIC BLACK |
1 x | STARTER TUBE 3" X 2.5" X 15 DEGREE (POST JUNE 05) |
1 x | 40 : ASHLIP - MAJOLICA BROWN |
1 x | GSKT TADPOLE,3/8 x3/4 PSA BLK# 12' BULK LENGTH |
1 x | 2 : PULL SCREENS |
1 x | AIRTUBE KIT, L-13 ANS/ANS-NT# #39271, PAT #5001 & 1250/CMNO |
1 x | DOOR ONLAY, 564 RECT BRONZE* |
2 x | N/S : SHIPPING BRACKETS |
1 x | Tube B,sec Air-mntplr |
1 x | 80 : FLUE COLLAR - BISCUIT |
3 x | Black 12oz Spray-258h |
1 x | LIGHT ASSY-564/864 GS (ACCENT) SS/TRV GREENSMART |
1 x | Refractory Fire Brick Left |
1 x | COMBUSTION BLOWER MOTOR MOUNTING GASKET |
1 x | 10 : FLUE COVER FOREST GREEN |
1 x | FUSE, 6 AMP, 250v - 5-PK GS# GS FAN MODULE |
1 x | PULL RING, METALLIC BLACK # PAINTED |
1 x | ELEV BOLT3/8-16X1-1/2-BIN |
1 x | Control Board Overlay for 80P30523-R |
1 x | Hour Meter |
1 x | Nake Panel Kit, Black Satin Paint |
1 x | BLOWER, RT, GAS INS - 2005+ # EF-II/DVS/DVL/31/33 |
1 x | 1 : FLUE COLLAR CLASSIC BLACK |
1 x | 80488 DRIVE MOTOR (1.5 RPM CCW) 1 |
1 x | MOTOR DRIVE SPROCKET |
1 x | Brass Tee, 5/16comp.x1/4 |
1 x | PILOT ELECTRODE SLEEVE, BLK# BULK LENGTH - 6 FEET |
1 x | BRASS COMPRESS FITTNG |
1 x | PILOT ELECTRODE - SIT# SPARK ELECTRODE - SIT PILOT |
6 x | Novasit Pilot orifice |
1 x | GSKT CEMENT, 3oz. TUBE# w/BRUSH - UNIVERSAL |
2 x | 73 : ASHPAN FRONT |
1 x | 120 Vac 50 Hz Comb Blower |
1 x | Wall Firestop - Galvanized |
1 x | Manifold Pri Air-cdwl |
1 x | Novasit Valve Assembly - LP |
1 x | GRATE, IRON 864TRV/HH/ST SERVICE PART |
1 x | Combustion Fan Housing Gasket (motor to housing) |
1 x | Grate Assy Painted |
1 x | SNAP-DISC - 200deg NC # NORMALLY CLOSED - HOPPER DISC. |
1 x | VALVE REGULATOR, NG MAN HI-LO# SIT 907.016 (3.5 -1.6") GS |
1 x | Slicer/poker Ass Y |
1 x | CIRCUIT BOARD 5 AMP FUSE 115V (SET OF 2) |
1 x | SMS AIR GRILL-BR SS |
1 x | 88032 Gasket, Flue Collar 1 |
1 x | 22 : FRONT WITH DOORS ASSEMBLY |
1 x | Front Ashlip - Charcoal Gray |
1 x | Auto/Manual Fan Switch |
1 x | BRICK-WHOLE,9 x 4-1/2 x 1-1/4# STANDARD FIREBRICK |
1 x | BLACK CLASSIC DOORKIT |
1 x | KNOB (WOOD) w/ SCREW# A/C - ASH/ALDER |
1 x | Black Rustic |
1 x | 3/8" X 7" Gas Inlet Pipe |
1 x | FUSE, 3.15AMP 5-PK GS2# GS2 CONTROL BOARD |
1 x | FASTENER - SCW BLACK 6 PK PHPSMS, #8 x 3/8" |
1 x | ON/OFF SWITCH w/EXTN WIRES DVL/DVS INSERTS |
1 x | Fitting Elbow 90 Degree (Located At Orifice End) |
1 x | BLOWER BRKT, DVL FS 2000-12 |
1 x | LOG, LEFT TWIG (TOP) - LS31# |
1 x | HANDLE (SPRING), A/C - BLACK# 3/8" id x 2.500" LONG |
1 x | Pf1 4 Pole Thermostat Ext |
1 x | ROLL PIN - GLS LATCH SPRING PACK OF 5 - 5/32" dia x 3/4" |
1 x | CONV PARTS, LP - SIT 21 TRV-GS |
2 x | HANDLE w/BRS CAM, BLK HDL# BLACK SPRING HANDLE, 1988+ |
1 x | Handle Mount Plate |
1 x | BRICK-CUT, 9 x 2-1/8 # |
1 x | 38/61/68 Comb Intake-sale |
2 x | Top Relief Frame |
1 x | SWITCH, COMFORT CNTRL / GS# DBL POLE |
2 x | # 49 burner orifice |
1 x | 12-volt Adapter For Led Lighting |
1 x | BUSHING (DOOR/HANDLE) 7/8" LONG x 1/2" dia |
1 x | 60 : RIGHT DOOR - BISCUIT |
1 x | Bulk-1/4-20x5/8 Wingscrw |
1 x | Left Side Brick Sr42a Se |
1 x | FASTENER - SCW 6 PK BLOWER 1/4-20 x 1/2" |
1 x | BLOWER ASSY RT - 864/564# FAN KITS 99000156/99000162 |
1 x | AIRTUBE KIT, A-10, RAINIER# (945/90) - SR# 1000 - UP |
1 x | HANDLE (SPRING), A/C - BLACK# 3/8" id x 2.500" LONG |
1 x | VALVE REGULATOR, LP SIT# S.I.T. 907.204 |
1 x | Thermostatic Fan DV and VF units only |
1 x | FLUE CLLR WLD ASS'Y w/GSKT 564 SS/21 TRV |
1 x | FLUE ADAPTER, WD ADJ OFFSET* |
2 x | Knob Griddle-maple-blk |
1 x | SWITCH, COMFORT CNTRL / GS# DBL POLE |
1 x | Pf/pb Control Cover-sales |
1 x | Pb105 View Door Asy-sales |
1 x | CLIP, FLOOR BRICK - 564SS CLEAN FACE - GSR2 |
1 x | HW PACK, FIREBACK - DVS INS #230 - FOR ACC'Y #98500640 |
1 x | Glass Gasket - Flush Tadpole Type (Per Foot) |
1 x | Gasket-ceramic Insert Plt |
1 x | SET-SCREWS, 3n1 DOOR KIT# SET OF (2) 1/4-20 x7/16 |
1 x | ACCESS DOOR BRKT, RIGHT 31/33/DVSGS/DVLGS |
1 x | Tube A, Sec Air - Mntplr |
1 x | EMBERS, ROCK-WOOL 50 grams# 8X10 BAG |
1 x | REMOTE HRNS PLUG, 3-LOOP# VARIOUS GAS MODELS |
1 x | 14" Snorkel Termination - Galvanized |
1 x | FUSE, 5AMP, 5-PK# FUSE ASSEMBLY - 93 & UP PEL |
1 x | HANDLE ASS'Y, ASH-DOOR AGP PELLET INSERT |
1 x | SWITCH, ROCKER - 3 POS LOPI 83-93 CHK AVAILABILITY |
1 x | KNOB (PLASTIC), RHEOSTATS # BLACK w/WHITE LINE - GAS/WOOD |
1 x | SNAP-DISC - 120deg CERAMIC# NORMALLY OPEN - SYSTEM DISC |
1 x | Clip, Glass Med |
1 x | DOOR CAM, LOPI - BRASS (A005)# 1984-85 WOOD - WAS CAST IRON |
1 x | Pawl Asy, Ductile Roller |
1 x | FRONT TRIM BOTTOM (864) CUSTOMER SERVICE PART |
1 x | 2 : BACK |
1 x | LOG, LEFT BOTTOM - LS40 (#3) # HIGH DEFINITION |
1 x | GSKT, GLASS 3/4" WIDE x 70"# LOPI WOOD, PELLET & GAS |
1 x | Brass Coil Door Handle |
1 x | 12v Transformer |
1 x | 67 : RIGHT DOOR - BISCUIT |
1 x | EMBERS, ROCK-WOOL 5 gram# |
1 x | CABLE CLAMP, ROMEX POWER CORD CLAMP |
1 x | PIPE ADAPTER, 3/8 FLARE x3/8M 3/8 FLARE x 3/8 MPT - 1/4 FPT |
1 x | 829 Novasit Valve Only - NG 3.5" |
1 x | FRONT TRIM SIDE RIGHT(864) w/RIVETS |
1 x | Cast Leg - Slate Blue (Each) - Original |
1 x | LOG PINS, LS-13, WHITE CERAMC# SET OF 3, 1/4 dia x 1-1/2" |
1 x | BRKT, FACE CONNECTORS L/R# DVS /EF II/GS/31 |
1 x | Glass, Defiant Fb |
1 x | 86726 TUBE (Ø5/32) , SECONDARY AIR 2 |
1 x | FASTENER - SCW 25 PK HWSHSMS,#8 x 3/8" TYPE B |
1 x | ORIFICE, PILOT LP - .016 # ROBERT SHAW |
1 x | AIR CONTROL ASSY, 2006-12 ANS-NT/ND & 1250/i |
1 x | 25 : FRONT GRATE |
1 x | GSKT, ASH PAN DOOR - AGP# 5/8" dia, BLACK- 60" |
1 x | PAINT, METALLIC BLACK - 12oz.# SPRAY CAN |
1 x | Ul Pellet Air Intake-sale |
1 x | EMPRESS FSSS BURN POT LINER |
1 x | GSKT, ROPE, DR 7/8" x 64" BLACK# VARIOUS WOOD/PEL/GAS |
1 x | SNAP-DISC - 120deg NO# NORMALLY OPEN |
1 x | BLOWER BRKT, RIGHT T.O.L/BERK |
1 x | GSKT, COVER PLATE LG-FWI AIR CONTL - HYBIRD |
1 x | GLASS RETAINER ASSY, 3n1 SML# w/GLASS & GASKET |
1 x | FASTENER - SCW BLK 6 PK# WD DR HNDL, 1-1/4"x1/4-20 |
1 x | 83551 1/4-20 WING NUT, BRASS 2 |
1 x | 32 : RIGHT SIDE - CLASSIC BLACK |
1 x | GSKT, GLASS 3/4"x50ft. 301-B# ASHESIVE BACK, GLS GSKT |
1 x | Bulk100-hwhtcs10-24 X 1/2 |
1 x | 5/16x1/2 Ball Plunger-3pk |
1 x | NAME TAG LOPI - CURVED 3 IN 1 DR SHELL - SERVICE PART |
1 x | SNAP-DISC - 120deg NO# WOODSTOVE & INSERT |
1 x | High Fan Overide Switch |
1 x | PULL RING, METALLIC BLACK # PAINTED |
1 x | LATCH BOLT & ROLLERS C/W NUT |
1 x | ROLL-PIN TOOL# SERVICE PARTS |
1 x | BRICK-CUT, 8-1/4 x 2-7/8 ASH PAN PED - OLY/RAINIER |
1 x | GSKT ROPE, 5/16" dia, BLK 50"# Arbor/Leyden |
1 x | N/S : MID LOG BRACKET |
1 x | LOG, CENTER LEFT - LS40 (#4) # HIGH DEFINITION |
1 x | Control Panel Assembly 99/00/01/02/03/04 |
1 x | DOOR SHELL ONLY, SM BLK LOPI NO HANDLE, GLASS, GASKET |
1 x | BURNER FRONT BRACKET LF/RT 864 TRV |
2 x | TRIM, TOP, BLK - ANSWER EXTRUDED ALUM., 23.000" LONG |
1 x | TOOL (PULL), LPI w/SPRNG HNDL# BYPASS PULL TOOL |
1 x | 120 Vac 50 Hz 4 Rpm Outbd |
1 x | SWITCH, SNAP ACTION, MINIATURE VARIOUS MODELS |
1 x | 11 : TOP LOUVER SINGLE (SC ONLY) |
1 x | DRIVE CHAIN |
1 x | 14ft Power Cord |
1 x | AIR SHUTTER GUIDE END/LIB 2020 |
1 x | Knob Therm Hndl-maple-blk |
1 x | PAINT, METALLIC BLACK - 12oz.# SPRAY CAN |
1 x | OUTSIDE AIR DUCT, PELLET# 1.750" x 25.0' |
1 x | PAINT, METALLIC BLACK 3oz# SPRAY CAN |
1 x | ANDIRON, WROUGHT IRON* 864 & CLEAN FACE |
1 x | Comb Pkg Cap-tl2.0 |
1 x | BRICK RETAINER (2) w/SCW# UNIVERSAL PART |
1 x | HW PACK, BLWR - REAR WOOD STOVE-2 |
1 x | 81 : LEG - BISCUIT |
1 x | KNOB (PLASTIC), RHEOSTATS # BLACK w/WHITE LINE - GAS/WOOD |
2 x | 38 X 4 Ul Fdr Pusharm-sal |
1 x | LEVELING BOLT[4], CST/BRS LEG# 1/4-20 w/RUBBER TIPS |
1 x | SWITCH, LITE LED w/SUPPORT SERVICE PART |
1 x | Eyelet Thrmst-eyelet#ses |
1 x | PELLET FDR EXT SPRING |
1 x | Front Door - Timberline Brown |
1 x | COMBUSTION BLOWER HOUSING GASKET(CIRCULAR) |
1 x | SNAP-DISC BRACKET (NEW STYLE) UNIVERSAL - GAS/PELLET |
1 x | PUSH PLUG & SWITCH BLANK PACK# PANEL TRIM - GAS INSERTS |
1 x | GASKET 1-1/2X9-32 BULBPSA |
1 x | HW PACK, PANEL - MOUNTING HW# SCREWS & NUTS - UNIVERSAL |
1 x | RHEO w/OFF, 90v, RECT (MM)# w/NUT & WASHER |
1 x | 10 : FLUE COLLAR |
1 x | LOG EMBERS, LARGE BAG # 12oz. BAG |
1 x | 58 : LEFT DOOR - BISCUIT |
1 x | EMPRESS/MILAN FPI CIRCUIT BOARD KIT |
2 x | Fitting Elbow 90 Degree Forged (Valve Outlet End) |
1 x | Manual/Auto Switch - Copper |
1 x | MILAN OUTER DOOR |
2 x | Round Magnet Holder - Screen Door (Each) |
1 x | 10 : GAS VALVE ASSEMBLY - NG |
1 x | GSKT, PILOT ASSY, GS# ALL GREENSMART UNITS |
1 x | HEAT EXCHANGER SHIELD# DVS/DVL/31/33 DVi |
1 x | BLOWER POWER CORD, w/RHEOSTAT# UNI REAR/LPI FRT, NO FL/FR BAY |
1 x | HANDLE w/BRS CAM, BLK HDL# BLACK SPRING HANDLE, 1988+ |
1 x | AIRTUBE SLEEVE, 1 x 1.250od# 1 PER PACK |
1 x | CORD RESTRAINER - LRG (BLACK) AC POWER CORD |
1 x | AUGER MOTOR STOP - PUSH VR.2 - CHK SR# |
1 x | Pellet Comb Blower |
1 x | BAFFLE-SALES |
1 x | BOSTON FPI 1200/1700 REPLACEMENT FAN W/MOUNT |
1 x | FASTENER - SCW 25 PK HWSHSMS,#8 x 3/8" TYPE B |
1 x | Fan Speed Controller Knob 99/00/01/02/03/04 |
1 x | INJECTOR, PILOT - LP (#35) # USE w/SIT PILOT ONLY |
1 x | BACK HEAT SHIELD-REAR |
1 x | BRICK, SET OF 8, FULL SIZE* |
1 x | AGITATOR DRIVE BRACKET |
1 x | Pb Cleanout Rod Repair |
1 x | PRES RELIEF DOOR (1) 96-08' DVSZC & VARIOUS FS GAS |
5 x | N/S : PIEZO WIRE |
1 x | BURNPOT VISUAL DEFLCTR - ver.2# w/ PINE CONE LOGO |
1 x | FASTENER - SCW 25 PK HWSHSMS,#8 x 3/8" TYPE B |
1 x | BRICK-CUT, 9 x 1-3/8# |
1 x | GSKT, PILOT ASSY, GS# ALL GREENSMART UNITS |
1 x | REMOTE, BLK WALL-MOUNT# ALL GS/GSR/GSR2 MODELS |
1 x | BLOWER, CONVECTION# 93-95BV,91-96PS/PI, 00 LRG PS |
1 x | COMBUSTION BLOWER MOUNTING GASKET |
1 x | MAGNET w/SHEATH 1.000 x .750" 1/4" THICK |
1 x | BRUSH, BENT HANDLE # COMBUSTOR/FIREBOX BROOM |
1 x | SET-SCREWS, 3n1 DOOR KIT# SET OF (2) 1/4-20 x7/16 |
1 x | GLASS, LPI LARGE, DOUBLE# 5mm NEOCERAM - 8.625x9.718 |
1 x | 29 : LEFT SIDE - BISCUIT |
1 x | WIRE HRNS PIG-TAIL, FEMALE 3-PIN, PWR DUCT KIT |
1 x | BRKT, CONV BLWR MOUNT ARBOR/LEYDEN CAST PELLET |
1 x | 1200 MID SECONDARY AIR TUBE D |
1 x | PAINT, METALLIC BLACK 3oz# SPRAY CAN |
1 x | Dvgin Lft Valve Door-sale |
1 x | DOOR, HINGE PIN RETROFIT, BLK# 2-PK, FS/INS |
1 x | TOP WING ASY-BLACK |
1 x | Firebrick Left Side Assy |
2 x | 12" Section Hi-Temp Double Wall Pipe Snap Lock |
1 x | HW PACK, DOOR - LOPI 3-n-1 BLACK/BRASS/PEWTER - #405 |
1 x | BLACK CLASSIC DOORKIT |
1 x | 29 : LEFT SIDE - BORDEAUX |
1 x | 1200 REAR SECONDARY AIR TUBE E |
1 x | BRICK-CUT, 9 x 2-7/8" # |
1 x | GLASS RETAINER w/GSKT, 3n1 SML DOOR GSKT ONLY |
1 x | SNAP-DISC, 5/8" w/BRACKET# WOOD - AVA FRONT, UNIVRSL REAR |
1 x | KNOB (PLASTIC), RHEOSTATS # BLACK w/WHITE LINE - GAS/WOOD |
1 x | GSKT TAPE, GLASS, 60" - SFW 302B 3/4 x 1/8 x3/16 - BLK |
1 x | SNAP-DISC - 200deg NC # NORMALLY CLOSED - HOPPER DISC. |
1 x | Log Set - Complete |
1 x | 2 : PILOT - SIGNATURE COMMAND NG |
1 x | LOG EMBERS, SMALL BAG # 4 oz. bag |
1 x | MANUAL, FREEDOM ND (3-n-1) |
1 x | LEG KIT, SCULPTURED STEEL* |
1 x | PIEZO IGNITER, ALL mv GAS UNITS # w/ RETAINING NUT |
1 x | Clip Glass 50x75-s/s |
1 x | DOOR CAM,LOPI - BRASS# 88 &UP WOOD, 1990-96 PEL |
1 x | BRICK-WHOLE,9 x 4-1/2 x 1-1/4# STANDARD FIREBRICK |
1 x | Door Frame Assembly - C/W Glass |
1 x | BAFFLE-SALES |
1 x | DAMPER, PLATE, END/REV 5"x20"# w/2.5x4.25 HOLE (X-NT/380-NT) |
1 x | LOG EMBERS, LARGE BAG # 12oz. BAG |
1 x | ROLL-PIN TOOL# SERVICE PARTS |
1 x | 3 : BACK |
1 x | DAUGHTER BOARD CONTROL PANEL W/DECAL (START 208161) |
1 x | VENT, WOOD ZC LINER KIT 25* 810007151 |
1 x | 18 : LEVELLING BOLT |
1 x | PAINT, METALLIC BLACK 3oz# SPRAY CAN |
1 x | Top Baffle Assembly |
1 x | DOOR SHELL ONLY, SM BLK LOPI NO HANDLE, GLASS, GASKET |
1 x | M55C HEAT EXCHANGER SCRAPER ROD |
1 x | 4 : PAN HD, PH 10-24 X 3/8IN Z |
1 x | SET-SCREWS, 3n1 DOOR KIT# SET OF (2) 1/4-20 x7/16 |
1 x | AIRTUBE SLEEVE (1), 1-1/4" OD 1-1/2" long w/ 2 holes |
1 x | GSKT, PILOT ASSY, GS# ALL GREENSMART UNITS |
1 x | LEG, CAST - BLACK (1)# w/ LEVELING BOLT/FASTENER |
1 x | 18" Timber Oak Log Set, Ceramic Fiber |
1 x | Blower Screen (Each) 99/00/01/02/03/04 |
1 x | BURNPOT - AGP# 12GA SS304 |
1 x | P35i 19.5 In Hopper-sales |
1 x | CONV PARTS, LP - SIT 31DVi / BERKSHIRE-GS / TOL-GS |
1 x | WOOD DOWEL, PEDESTAL, AVA SML 23-1/8" LONG, 2-PK |
1 x | PITCHED CEILING PLATE (12/12/) |
1 x | BACK GRILL (BOTTOM) |
1 x | .4375" RO finish plugs |
1 x | FASTENER - SCW 6-PK NAMEPLATE #2 x 3/8 TYPE U (BLACK ZINC) |
1 x | Tl2/win Brick Insulation |
1 x | Screen Rod Assy |
1 x | PAINT, METALLIC BLACK 3oz# SPRAY CAN |
1 x | ASH PAN-SALES |
1 x | Steel Brick Kit |
1 x | ON/OFF WIRING HARNESS |
2 x | Fan Wiring Harness |
1 x | Door frame weldment |
1 x | LOG, LEFT TWIG - LS1 # 1996-2000 |
1 x | HANDLE (SPRING), DOOR - BLACK# 1/2" id x 4.158" LONG |
2 x | Shldr Screw 3/8x3/8 |
1 x | Tube Scraper Rod |
1 x | 11B : HI/LOW CONTROL KNOB EXT |
1 x | BLOWER CONV, RIGHT# DEERFIELD ONLY |
1 x | Firebrick Side Assy Servi |
1 x | SNAP-DISC - 120deg NO# WOODSTOVE & INSERT |
1 x | Spill Switch - Manual Reset 300 Degree |
1 x | 28 BLUETOOTH MODULE |
1 x | PILOT ELECTRODE, 24" - PSE# PILOT FLAME SENSOR - PSE ONLY |
3 x | Novasit Pilot Hood 3 Way 00/01/02/03/04 |
1 x | PILOT HOOD,2-WAY, S.I.T - GS# STANDARD GS PILOT HOOD |
1 x | 9mm X 13mm Tubing-5ft/kit |
1 x | Bolt On Ash Dr Hinge-sale |
1 x | 2 ACCESS DOOR ASSEMBLY (SEE-THRU) |
1 x | SMS ASH DOOR ASY-SALES |
1 x | Decorative Rivet - Nickel (Each) |
1 x | BLOWER, COMB, PELLET - LARGE# 2000 & UP, YANK/AST |
1 x | Stacked Rust |
1 x | M55C-FS CAST TOP WITH HOPPER LID-PD |
1 x | 2 : FIRESCREEN W/RINGS |
2 x | Fem Disc-fully Ins-25/pk |
1 x | Ball Plunger - Bottom Louver (Each) |
1 x | VACUUM SWITCH LOW PRESURE |
1 x | TLC WOOD KNOB & CAP-2SETS |
1 x | Dielectric Grease (Packet) |
1 x | Fan Heat Deflector |
2 x | On/Off Switch/Fan Switch - White |
1 x | N/S : PAINT-SAND-TUBE |
1 x | PILOT SHIELD (1080) SERVICE PART |
1 x | SHL SIDE, RGHT TOL MAJ BROWN NO LEGS CHK AVLABLITY |
1 x | WALL MOUNT, WIRELESS TRANS# SWITCH - 4-BUTTON 36/1080 CF |
1 x | GLASS CLIP SCREWS (10), AVA # 10-24 x 1/2", BRASS/CAST DOORS |
1 x | Gasket-1/2 Rd Ld-20 Ft |
2 x | DOOR, WASHER, .390 x .630 SS# PK OF 8 |
1 x | Palace Logo Plate |
1 x | Burner Assy, 6048 |
1 x | Insulation Paper Liner - Back |
1 x | SWITCH, ROCKER - 3 POS LOPI 83-93 CHK AVAILABILITY |
1 x | Hearth Brick R/rc36 |
1 x | BOARD MOUNTING BRACKET 864 HH/ST |
1 x | Wooden Door Handle - Black (Used On Charcoal Units) |
1 x | Auger Motor 2 RPM |
1 x | FRONT COMPLETE-PD |
1 x | 4 RELIEF DOOR ASSEMBLY |
1 x | CONV PARTS, NG - SIT 864 ST-GS |
1 x | ACCESS GASKET |
4 x | Duplex Receptacle Box |
1 x | DOOR, AVA, MED BRS, SML HINGE# COMPLT - LIMITED STOCK |
1 x | 1 : DRAGON BRACKET - EBONY |
2 x | Flex Line-30 |
1 x | Front burner tube |
1 x | 5/8" I.D. AUGER BRASS BUSHINGS (SET OF 2) (POST JULY01/08) |
1 x | MANTEL SHIELD* |
1 x | HB35 NG CONVERSION-SALES |
1 x | Hinge Control Door-fs/hm |
1 x | SIT NOVA LP 50% TURN DOWN REG. PLATE (ALL GAS EX 828/EG30/EG95) |
1 x | MILAN OUTER DOOR HINGE PIN |
1 x | DOOR SHELL, YANKEE, BLK PNT SLIP-ON STYLE |
1 x | Southern Comfort 24", VF Logs, Concrete 1/2 |
1 x | DOOR HANDLE (UPPER) |
1 x | AIR GRILL |
1 x | 1 : DRAGON BRACKET - BISCUIT |
1 x | Firebrick- Lt Side |
2 x | 1/2" X 18" Flex Line - Gas Inlet |
1 x | Ceramic Magnet - Side Doors (Each) |
1 x | LOG, FRONT RIGHT(#8) LS35/41# (CHUNK) |
1 x | ORIFICE, BURNER - No. 37 1.180" BRASS HEX (.104 dia) |
1 x | Firebrick Back Assy Servi |
1 x | POWER CORD, w/MOLEX (18 GA) # UNIVERSAL - WOOD & GAS |
1 x | P35i 19.5 In Hopper-sales |
1 x | Loctite anti-seize |
1 x | WIRE HRNS, PEL, PS/PI 2005+# REPLACES OLD HARNESS 100-00393 |
1 x | MANUAL, 996 TF/45 DEG 1992 |
1 x | PIEZO IGNITER, ALL mv GAS UNITS # w/ RETAINING NUT |
1 x | FAN, REAR MOUNT F/S WOOD II* |
1 x | ASH PAN-SALES |
1 x | Nailing Strip - Top |
1 x | Pilot Ods Tp Op# 8402 |
1 x | CABLE CLAMP, ROMEX POWER CORD CLAMP |
1 x | Acc Lid Ballsprng Mnt-sal |
1 x | HW PACK, REMOTE - MOD LP GS SERVICE PART |
1 x | Acc Comb Mnfld Ltch-left |
1 x | STAINLESS STEEL CAST AGITATOR W/COUPLER |
1 x | EMBERS & LRG NUGGETS -WP/BF/ASCOT/EG40 POST '00) |
1 x | MAGNET w/OUT SHEATH w/ MOUNTING HW |
1 x | Hinge Pin Assembly Top |
1 x | Versa Grate Bracket Assembly |
1 x | PILOT ELECTRODE, SIT PILOT# SPARK ELECTRODE/STANDING PILOT |
1 x | FACE, 616 TIMES SQUARE SCR* |
1 x | KNOB (PLASTIC), RHEOSTATS # BLACK w/WHITE LINE - GAS/WOOD |
1 x | HW PACK, BLWR - REAR WOOD STOVE-2 |
1 x | 1/2-13 X 12 All Threadbin |
1 x | Derated Burner Orifice #40 - NG 99/00/01/02/03/04 |
1 x | EFW DAMPER HANDLE SPRING - NICKEL |
1 x | DOOR, HINGE PIN RETROFIT, BLK# 2-PK, FS/INS |
1 x | GSKT, FLUE COLLAR EDEN /CYP/NORFLD/GRNFLD |
1 x | Insulation Paper - Side Liner |
1 x | CONVECTION BLOWER INSULATOR (GASKET) |
1 x | TLC-2000 AIR GRILL TRIM |
1 x | S.I.T. NOVA VALVE CONVERTIBLE WESTPORT CONVERSION KIT LP TO NG |
1 x | Rp199 Replacement Damper |
1 x | ASH PAN-SALES |
1 x | LOG, REAR - LS52 (#1)# (2011) |
1 x | GSKT, FLUE COLLAR VARIOUS MODELS |
2 x | 8 : CS, HEX HD 1/4-20 X 1/2ININ GR5-BLK |
1 x | Nailing Strip - Right |
1 x | 30" Rich Oak Log Set, Concrete |
1 x | AGITATOR DRIVE SHAFT W/SPROCKET |
1 x | Burner Kit |
1 x | PAINT, METALLIC BLACK 3oz# SPRAY CAN |
1 x | Ignitor Assembly |
1 x | LOG EMBERS, LARGE BAG # 12oz. BAG |
1 x | 1 : GRIDDLE QUAD |
1 x | 11 PORCELAIN PANEL (REAR) |
5 x | Fan Speed Control (Rheostat) 99/00/01/02/03/04 |
1 x | PAINT, METALLIC BLACK 3oz# SPRAY CAN |
1 x | PILOT ELECTRODE COVER TUBE SILICONE TUBE |
1 x | TERM TRIM COLLAR-SALES |
1 x | GSKT, GLASS 3/4" WIDE x 70"# LOPI WOOD, PELLET & GAS |
1 x | GSKT, ROPE, DR 7/8" x 64" BLACK# VARIOUS WOOD/PEL/GAS |
1 x | M55C-FS CAST FRONT MOUNTING BRACKETS (SET OF 2) |
1 x | Burner Service Kit |
1 x | 1" KNOB |
1 x | Door Extension Spring (Each) |
1 x | Southern Comfort 36", VF Logs, Concrete 1/2 |
1 x | 30" Red Wood Mountain Log Set, Concrete |
1 x | Furnace Logo |
1 x | DOOR HANDLE ASS'Y, '84 DBL DR# NON-CAM SIDE |
1 x | Vent Grill - Chase |
2 x | Side Csb |
1 x | Replacement Glass 99/00/01/02/03/04 |
1 x | 2 SAFETY BARRIER |
1 x | Heat exchange baffle |
1 x | Cabinet Style Stainless Steel Screen Doors W/ Bronze Finish |
1 x | Fdr Slide Plate Asy-sales |
1 x | Replacement Glass |
1 x | PANEL, INSULATION - 3" x 10' # Wood Burning Inserts |
2 x | Southern Comfort 30", VF Logs, Concrete 1/2 |
1 x | BRICK, SET OF 8, FULL SIZE* |
1 x | SNAP DISC HOLE COVER w/SCREWS & GSKT |
1 x | GSKT, ROPE, DR 7/8" x 64" BLACK# VARIOUS WOOD/PEL/GAS |
1 x | ORIFICE-NG-MALE-#39 |
1 x | ASHLIP TRIM, BLK, LOPI LARGE LIBERTY/FREEDOM - 24.5 WIDE |
1 x | LOG, LEFT CROSS - LS51 (#6)# |
1 x | LIGHT BULB, HALOGEN 5PK# 35watt, T4, 120volts, 380 Lumen |
1 x | PAINT, METALLIC BLACK 3oz# SPRAY CAN |
1 x | PILOT ELECTRODE SLEEVE, BLK# BULK LENGTH - 6 FEET |
2 x | Glass Retainer Clips\Glass Screws - 8 Per Package |
1 x | COMBUSTION BLOWER MOUNTING GASKET |
1 x | Bulk15-hcs 5/16-18 X 3 G8 |
1 x | HRD METER SHAFT (vr.2) CHECK SR# |
1 x | GLASS CLIP KIT, Lg/Sm DOORS# DOUBLE DOOR, w/SCREWS, 1981-84 |
1 x | DOOR RETAINER SCRWS(10)# 10-24 x 7/8" - 10PK |
1 x | WIRE HRNS, FAN/LIGHT GSR-2# PRO-FLAME 2 |
1 x | Shr52 Refractory Brick Rt |
1 x | 7 PAN BURNER ASSEMBLY |
1 x | 2 : DAMPER BRACKET |
1 x | VENT, WOOD ZC LINER KIT 25* 810007151 |
1 x | BRUSHED SS TILE PLTE-DEER |
1 x | LOG, RHT FRT TWIG - LS29 # 21 TRV |
1 x | GSKT, DOOR 7/8" x 50' BLACK# ROPE - MISC. GAS/WOOD/PELLET |
1 x | Revere insert |
1 x | Ring, Jump (sm Plated) |
1 x | #8 - 24/18 Top Left Log |
1 x | BLOWER POWER CORD, w/RHEOSTAT# UNI REAR/LPI FRT, NO FL/FR BAY |
1 x | Ass'y, Access Doors, Khld |
1 x | SPARK ELECTRODE W/IGNITOR CABLE (POST 10/00) |
1 x | DOOR SHELL ONLY, SM BLK LOPI NO HANDLE, GLASS, GASKET |
1 x | Oak Retainer Plate W/hdwr |
1 x | CAM ASY-SALES |
1 x | FIRESTOP, 44 DVXXL/DVL ZC 03/ 21 RV/HDY RV/864 TRV |
1 x | Quick Connect Pipe Adapter |
1 x | M55C-FS ASH PAN |
1 x | 19 : VENTURI |
1 x | 1 GLASS GUARD ASSEMBLY |
1 x | BAF SUPRT, FRONT "Y"# LIB/FREE/FREEBY/1190/OLY |
1 x | MILL-PAC BLACK HI-TEMP SEALANT 1-TUBE, (10.3oz) |
2 x | Sensor Switch |
1 x | CABLE CLAMP, ROMEX POWER CORD CLAMP |
1 x | 42* Frame Assembly |
1 x | CONVERSION KIT FROM LP TO NG DV36 |
1 x | GSKT, EXH. CONNECTOR - 864 12.575" x 6" |
1 x | AUGER TUBE COVER |
1 x | Firebrick Back For Servic |
3 x | Fitting Elbow 90 Degree (Located At Orifice End) |
1 x | 8 : CABLE CLIPS (TWO PER FIREPLACE) |
1 x | SET-SCREWS, 3n1 DOOR KIT# SET OF (2) 1/4-20 x7/16 |
1 x | 1A : LOG 1 |
1 x | 1D : LOG 4 |
1 x | COMPLETE PILOT ASSEMBLY NG |
1 x | HOPPER AND LID-SALE |
1 x | Grate Assy Br36 Service |
1 x | GSKT, GLASS 3/4"x50ft. 301-B# ASHESIVE BACK, GLS GSKT |
1 x | BURNER POT - CAST ROUND |
2 x | N/S : LAVA ROCK |
1 x | Log #10, Mon18 |
2 x | AIRSLIDE-SALES |
1 x | NIPPLE, BARBED (PELLET)# |
4 x | 4 : ODS PILOT ASSEMBLY NG - MANUAL |
1 x | SCREW-HWH TEKS 8 X 3/4 |
1 x | Stove Top - Slate Blue - Original |
1 x | AIRTUBE KIT, A-11/L-16 # LIB/FREEBY/OLY |
1 x | PAINT, METALLIC BLACK - 12oz.# SPRAY CAN |
1 x | Acc52i Ashlip-sales |
2 x | GLASS RETAINER w/GSKT, 3n1 SML DOOR GSKT ONLY |
1 x | LIGHT, ACCENT TYPE III # 21 TRV - SERVICE PART |
2 x | 10 BURNER ASSEMBLY (NG) |
1 x | 8b : FIREBRICK - BACK |
1 x | BRICK-CUT, 8-1/4 x 4-1/2 # |
1 x | CERAMIC BRICK RETAINERS w/SCREWS - SET OF 2 |
1 x | Oak Left Side Panel-sales |
1 x | SIDE PNL, RT, BLACK AGP PI AGP PELLET INSERT |
1 x | GSKT ROPE, 7/8" dia - BLK 56"# VARIOUS MODELS |
1 x | Fan Switch Control Bracket |
1 x | PAINT, METALLIC BLACK - 12oz.# SPRAY CAN |
1 x | Bottom Base Assembly |
1 x | 5 Pc Ball Handle - Square Base / Antique Brass/Black / Antique B |
1 x | PAINT, METALLIC BLACK - 12oz.# SPRAY CAN |
1 x | Brick Clip (Each) |
1 x | DOOR, HINGE PINS, BLACK# 2-PK, FS/INS |
1 x | Acc52i Center Wing W/hdwr |
1 x | HANDLE w/BRS CAM, BLK HDL# BLACK SPRING HANDLE, 1988+ |
1 x | EMBERS, ROCK-WOOL 50 grams# 8X10 BAG |
1 x | BATTERY RELAY |
1 x | GSKT TADPOLE,3/8 x3/4 PSA BLK# 12' BULK LENGTH |
1 x | Brick Pack L7 |
1 x | 11 : BACK PLATE |
1 x | PILOT TUBE W/FITTINGS (SIT) |
1 x | ASHLIP TRIM, BLK, LOPI SM/MD# ANS/END/PAR/REV - 19" |
1 x | 2 : INJECTOR LP 1.45 |
1 x | AUGER MOTOR BRACKET |
1 x | Control board harness restraint |
1 x | Lp Burner Tube Assembly |
1 x | SNAP-DISC - 120deg NO# WOODSTOVE & INSERT |
1 x | SWITCH, ROCKER, ON/OFF# SINGLE-POLE, VARIOUS GAS UNITS |
1 x | 24" Rich Oak Log Set, Concrete |
1 x | ASH PAN-SALES |
1 x | HW PACK, FACE, ARC GLD, 44/36# w/ (12) SCREWS |
1 x | Clean Out Covers |
1 x | CHASSIS DOOR BOLT AND ROLL (POST MAY06) |
1 x | 2 AMP FUSE |
1 x | COLLAR |
1 x | BRICK, SET OF 8, FULL SIZE* |
1 x | POWER CORD |
1 x | M55C-FS/FPI WIRING HARNESS |
1 x | 38/61/45 Mod Trim-br Ss |
1 x | 300i Wing Supports & Hdwr |
1 x | Black Glass Assembly |
1 x | Standoffs - Sides |
1 x | SIT NOVA LP 50% TURN DOWN REG. PLATE(ALL GAS EXC 828/EG30/EG95) |
1 x | 2 VALVE (P) |
1 x | CAST FLUTED FIREBOX LINER |
2 x | Auger Motor |
1 x | DOOR, WASHER, .390 x .630 SS# PK OF 8 |
1 x | Bracket DC Sparker Mount |
1 x | 1/2 Pillow Block-4 Pack |
1 x | Hopper switch box |
1 x | Grate Assembly |
1 x | 2 FIXED DOOR ASSEMBLY |
1 x | BURN POT |
1 x | COMBUSTION MAIN IMPELLER 1" x 4 1/2" |
1 x | M55C-FS TECHNICAL MANUAL |
2 x | TRANSFORMER (3V) |
1 x | BURNER ASSY - GRNFLD MV GREENFIELD |
2 x | PILOT GASKET |
1 x | PILOT TUBE, 24" - PSE# 2 & 3-WAY PILOT ASS'Y |
1 x | Standoff Top - Left Side |
1 x | 3/8" X 19" X 9 3/8" (2 Notches) |
1 x | INJECTOR, PILOT - NG (#62)# USE w/SIT PILOT ONLY |
1 x | BAFFLE INSULATION - MFW MED. FLUSH WOOD INS. |
1 x | ORIFICE, BURNER - No. 56# 1.180" BRASS HEX (.0465 dia) |
1 x | WIRE HRNS, BLWR CTRL, GS 21/TOL/BRK/EDN/NOR |
2 x | Cypher Collection - Small Screen |
1 x | 1 1/4 Burner Tube Assy Lp |
1 x | Brick 12 X 6 X 1-1/4 |
1 x | Primary Air Slide Assembly Upgrade Kit ( Replaces Line Numbers 6 |
2 x | DOOR, HINGE PIN RETROFIT, BLK# 2-PK, FS/INS |
1 x | Screens |
2 x | Screens |
1 x | Screens |
1 x | PAINT, METALLIC BLACK 3oz# SPRAY CAN |
2 x | 50* Rh Door Assembly Bz |
1 x | Rt Brick Mbc36 |
1 x | FLASHING, TOP |
1 x | 20 : GRILLE UV30 |
1 x | 4 : REAR BURNER |
2 x | STOVE PACK, AGP INSERT PELLET INSERT |
1 x | Mbc36a Bk Brick |
1 x | GASKET - GLASS 8' |
1 x | WIRE HARNESS |
1 x | WIRE HARNESS |
1 x | FLASHING, LEFT |
1 x | Orifice Hood #52 |
1 x | 3 : FRONT BURNER |
1 x | LOUVRED GRILL |
1 x | ASH PAN HANDLE |
1 x | 8 : END LIGHT DW GAS |
1 x | 1 : DOOR ASSEMBLY |
1 x | 11 : REAR INJECTOR NG |
1 x | 6 : PILOT NG - COPRECI |
1 x | 11 : REAR INJECTOR LP |
1 x | 1d : LOG TOP RIGHT |
2 x | 9 : SPEED CONTROL |
1 x | GRAPHO-GLAS KIT |
2 x | PAINT, METALLIC BLACK 3oz# SPRAY CAN |
1 x | REGISTER PLATE |
1 x | 1 Log Assembly |
1 x | 2 : PILOT ASSEMBLY - LP |
1 x | 10-2131-18 Ss Flex Hose |
1 x | 21 LED WIRE WHITE |
1 x | 23 LED CONTROLLER |
1 x | 2L : RIGHT BASE LOG |
1 x | 27 : CR FIREBRICK-REAR |
1 x | 1 1/4" O.D. X 19" L. (Snap In) |
1 x | P61/45 Hpr Heat Shld-sale |
1 x | Bulk50-hcs 5mm X 8mm Z |
1 x | DECORATIVE INSET |
1 x | HEAT SHIELD (LEFT) |
1 x | DOOR FRAME - BLACK |
1 x | Brick-back Br42 |
1 x | 4L : RIGHT FRONT LOG |
3 x | N/S : PILOT REGULATOR NG |
1 x | Door Latch (Each) |
1 x | Damper Rod Extension Collar |
1 x | ASH GUARD - FWP FWP ARCH/REC & FW CAPE COD |
1 x | 13 : SPRING DOOR CLOSURE |
2 x | KNOB, PHENLIC# BLACK - 1" dia |
1 x | KNOB (PLASTIC), RHEOSTATS # BLACK w/WHITE LINE - GAS/WOOD |
2 x | Embers - Bag |
2 x | STUD PLATE/HW ASSEMBLY SM PI/PS |
1 x | Diamond Curved Screen |
1 x | Arts & Crafts Curved Screen |
1 x | Hearth Brick Mbc36 |
1 x | Connector 3/8" Compression X 3/8" Male (Valve |
1 x | 5/8" Glass Gasket - Top Channel - Per Foot |
3 x | Garland Collection - Large Screen |
1 x | Garland Collection - Small Screen |
1 x | 31 : LEFT END - FREESTANDING - MIDNIGHT BLUE |
1 x | LOGO - TIMBERWOLF - DIE CAST SATIN CHROME |
1 x | Castg-two Leg-dw1000-mach |
1 x | 1 1/4 Burner Tube Assy Ng |
1 x | GLASS, 1/4 CRUSHED BRNZ 10LBS* |
1 x | AUGER BUSHING PLT-UPR, LYD/ARB SERVICE PART |
1 x | 1 : DOOR ASSEMBLY COMPLETE (INCLUDES ITEMS 1,2,3,4,7 & 8) |
1 x | FASTENER - HEX NUT# STEEL 3/8-16 -JAMB-LOCK, 5 PK |
1 x | 25863 REGULATOR, MANUAL FEED RATE 1 |
2 x | VENT, WOOD ZC LINER KIT 35* � 810007152 |
1 x | SPACER, WHITE, INTAKE SHUTR# 5-PK |
1 x | BRICK-CUT, 9" x 4-1/4" (#66) |
1 x | Top Relief Plate 99/00/01/02/03/04 |
1 x | Side Shelf Hardware Package Complete |
2 x | DRAW LATCH, DOOR/FLUE w/ RIVETS - VARIOUS PEL/GAS |
1 x | Plated, Porcelain Panel R |
1 x | HEARTH PLATE - 864 TRV GS# SERVICE PART |
1 x | TOOL, GLASS LATCH/RESTRICT0R # VARIOUS GAS AND PELLET |
1 x | DAMPER SLDR, w/2 SOCKETS# FREE/FRBY/OLY |
1 x | Ash Door Hinge Bracket - Left |
1 x | 21 : AIR DIVIDER, RIGHT |
2 x | AUGER PLATE AND BUSHING (ASSEMBLY) |
1 x | 1 BURNER ASSEMBLY |
1 x | SIDE PNL, LT, BLACK AGP PI AGP PELLET INSERT |
1 x | Ash Plug Tool Handle |
1 x | EMBERS, ROCK-WOOL 5 gram# |
1 x | WIRE HRNS, ACCENT LIGHT, BRK TOL (GREENSMART) |
1 x | 300i Right Rear Side-sale |
1 x | Pellet Power Cords W/ends |
2 x | Motor mount assy (inc pot drive shaft) |
1 x | GASKET, GLASS(must replace if dismantling glass assembly)-4 feet |
1 x | Pot Side Shield |
1 x | Screens |
1 x | FUSE, 6 AMP, 250v - 5-PK GS# GS FAN MODULE |
1 x | 9 PANEL SUPPORT BRACKET |
1 x | 4" EXHAUST STARTER TUBE C/W GASKET |
1 x | FASTENER - SCWS 8-PK GLS CLIP# 8-32 x 3/8" PH TORX TYPE F |
1 x | EMBERS, ROCK-WOOL 5 gram# |
1 x | 17 : BLOWER ASSEMBLY |
1 x | ENDEAVOR (380NT) |
1 x | Assy, Hood G(m)cat50 |
1 x | PILOT ORIFICE, LP - 0.014 PSE# PSE PILOT ASSY |
1 x | 3 COMPLETE DOOR ASSEMBLY |
1 x | POWER CORD, w/MOLEX (18 GA) # UNIVERSAL - WOOD & GAS |
1 x | DAMPER PLATE, 36E 2020 |
1 x | IGNITER BASE , LG-FWI LG-FWI HYBIRD |
1 x | GLASS CLIP KIT, Lg/Sm DOORS# DOUBLE DOOR, w/SCREWS, 1981-84 |
1 x | FIREBACK, 564 SS BRICK/HERR* |
1 x | Fan Speed Controller |
3 x | Handle Asy-sms,tl3,68,xxv |
1 x | 13 RIGHT BURNER BRACKET |
1 x | LOG, FRONT BTM LEFT - LS27# |
1 x | Assembly Valve/pilot,18"ng Tka |
1 x | #12 Jack Chain - 2 Feet Required (Each) |
1 x | GLASS SPACER, (1) HER FS DV/BV 13-3/16" LONG |
1 x | Brick Set |
1 x | 11 BURNER COVER |
1 x | Assy Glass Frame And Pane |
1 x | DOOR, AVA, MED BLK, SML HINGE NO GLASS w/HANDLE (PEN/RAI) |
1 x | Bulk100-ssscp 10-24 X 1/4 |
1 x | PUSH PLUG, 1/4" dia, BLK FWI/FXFRE |
1 x | CONTROL PANEL W/DECAL C-11626 |
1 x | Bottom Standoffs Side - (Each) |
1 x | LIGHT SHIELD, 564 DF FIREBACK SET OF 2 (L/R) |
1 x | CAST TOP ONLY (NO GRATE) - DB |
1 x | 1/4" X 1" Glass Nutsert (Each) |
1 x | INJECTOR, PILOT - LP (#35) # USE w/SIT PILOT ONLY |
1 x | RHEO w/OFF, 90v, RECT (MM)# w/NUT & WASHER |
1 x | Pellet Grill Heat Shield (Includes Fasteners) |
1 x | VALVE TRAY ASSY, 564DF GSR2 DELUXE - no/BURNER |
1 x | Gin/dvgin Xl Cord Harness |
1 x | Y Log 18 Most Service |
1 x | Oak Top Load Handle-sales |
1 x | LIGHT, ACCENT TYPE IV # 1080 CF - SERVICE PART |
1 x | # 33 burner orifice |
1 x | EMBERS, ROCK-WOOL 50 grams# 8X10 BAG |
2 x | Screw 1/4-20x1-1/2 Pkg-25 |
1 x | GLASS FRAME, FINGER PULL - 864 NO GLS, GSKT, OR SCREEN |
1 x | LOG EMBERS, LARGE BAG # 12oz. BAG |
1 x | SWITCH, START, PELLET 1990-96# ROCKER SWITCH |
1 x | FASTENER - KEPS NUT 10 PK 10-24 |
1 x | Shr42a Hearth Brick |
1 x | TRIM, FRONT BOTTOM - 564 PRE SCREEN MODELS |
1 x | Stove Base - Charcoal Gray |
1 x | RHEOSTAT PLATE SCREWS, BLACK SET OF 2 - 36A/E, 44A/E |
1 x | Z Bracket, Snap Disk Serv |
1 x | Hearth Brick Bfc36 Servi |
1 x | FASTENER - BOLT 5 PK HHCS 1/4-20 x 1/2" |
1 x | SET OF CUT BRICK FOR 3500 |
1 x | FLEX 1988 |
1 x | DOOR CAM, LOPI - STAMPED STL# 1986-87 WOOD |
1 x | GSKT, WIRE PLATE VARIOUS UNITS - 2" x 1-1/4" |
1 x | GASKET-FLUE PIPE-3 PK |
1 x | 10 7” FLANGE GASKET |
1 x | GLASS LATCH - FINGER-PULL# vr.2, 2007+ |
1 x | 16 SWITCH WIRE ASSEMBLY |
1 x | Accin Comb Box Insul Cvr- |
1 x | SNAP-DISC - 120deg NO# WOODSTOVE & INSERT |
1 x | Thermocouple-use W/pse |
1 x | 16 : INJECTOR NO.44 - NG |
1 x | ORIFICE, BURNER - No. 46 1.180" BRASS HEX (.081 dia) |
1 x | Assy Screen Dbx/dfx 24 Se |
2 x | Castg Ashfr-lrg-dutchwest |
1 x | SWITCH, ROCKER - 3 POS LOPI 83-93 CHK AVAILABILITY |
1 x | GSKT, WIRE PLATE VARIOUS UNITS - 2" x 1-1/4" |
1 x | GLASS w/GASKET - 864 TRV/ST# TEMPERED GLASS |
1 x | Decorative Rivet - Polished Gold (Each) |
1 x | Halogen Bulb, 60w |
1 x | FASTENER - KEPS NUT, 10 PK 8-32 |
1 x | Ass'y Glass Door A/r 40 |
1 x | Spacer |
1 x | Refractory, Rear, Mcuf42 |
1 x | Ass'y, Door |
1 x | 17 : RIGHT AIR TUBE |
1 x | BRICK-CUT, 7"x 4-1/2" (#63) |
1 x | LOG, LEFT - LS44/46 (#4)# CLASSIC |
1 x | FLUE STARTER SCTN (8" od) w/GASKET |
1 x | ACCENT LIGHT BRACKET 864 ST |
1 x | PILOT GASKET |
1 x | FLEX PIPE, 3/8"od x8" BLK NO-FITTINGS |
1 x | Adv Ul Fdr Asy-sales |
1 x | Cypher Collection - Wall Mounted Tool Set |
3 x | Derated Burner Orifice #52 - LP 99/00/01/02/03/04 |
1 x | Pc45 Feeder Auger |
1 x | Rotation Motor Mount Bracket |
1 x | Pellet Fdr Cw Motor-4rpm |
1 x | Door Frame Only |
1 x | Door Mounting Bracket Nickel Left - Double Door |
1 x | GLASS - 21 ELEC# 22"x 17.5" |
1 x | #9-36 Top Log Massive Oa |
1 x | Neoclassic Flat Screen Large - New! |
1 x | HB35 TERM BLK HARNESS |
1 x | Decorative Carriage Bolt For Handle/Hood - Antique Gold (Each) |
1 x | 2 BURNER ORIFICE LP #54 (TOP) |
1 x | SNAP-DISC BRACKET (NEW STYLE) UNIVERSAL - GAS/PELLET |
1 x | VENT, ELITE - STORM COLLAR* 810006675 |
1 x | POWER CORD, w/MOLEX (18 GA) # UNIVERSAL - WOOD & GAS |
1 x | SMS WIRE COVER |
1 x | Xxv Top Twilight |
1 x | 11 COMPLETE PILOT ASSEMBLY LP |
1 x | 4 : LEFT DOOR ASSEMBLY COMPLETE |
1 x | BLOWER FILTER, COVER GRILL # BLOWER BOX OUTER COVER ONLY |
1 x | HANDLE ASSY, AVA w/BRASS CAM # & WOOD HANDLE - COMPLETE |
1 x | 19 : TOP LOUVER ASSEMBLY |
1 x | GSKT, GLS 15/16x54" 302-B# VARIOUS WOOD, PELLET & GAS |
1 x | EMBERS, ROCK-WOOL 5 gram# |
1 x | BLOWER, CONV, UNIVERSAL# VARIOUS GAS/PELLET/PHD KIT |
1 x | Grate Assembly |
1 x | LOG EMBERS, SMALL BAG # 4 oz. bag |
1 x | GLASS w/FRAME - 564# FINGER-PULL LATCH - SS/DF/DLX |
1 x | Pressure Relief Door Back 99/00/01/02/03/04 |
1 x | DOOR LATCH CLAMP EVG/FW INS |
1 x | Scroll Three-Fold Screen |
1 x | 5 FRONT BURNER |
1 x | 28a : TIE ROD NUT (REPLACES 1203210) |
1 x | PILOT ELECTRODE, 24" - PSE# PILOT FLAME SENSOR - PSE ONLY |
1 x | LOWER HEAT SHIELD |
1 x | HANDLE (SPRING), A/C - BRS # 3/8" id x 2.500" LONG |
1 x | PIPE ADAPTER, 3/8 FLARE x3/8M 3/8 FLARE x 3/8 MPT - 1/4 FPT |
1 x | GLASS, SMALL LOPI# 8-7/8 x15-3/8" GSKT NOT INCLD |
1 x | PILOT ASSY (5-Pk), NG - S.I.T# MILIVOLT MDLS ONLY |
1 x | Fan Wiring Harness |
1 x | Brkt-brick Support |
1 x | DOOR COMPLETE |
1 x | Shr42a Rt Sidebrick-herrn |
1 x | PULL RING, METALLIC BLACK # PAINTED |
1 x | EMBERS, ROCK-WOOL 5 gram# |
1 x | 13 : CABLE CLIP (FOR BLOWER ASSEMBLY) |
1 x | E30 PILOT SHIELD |
1 x | FEEDER ASY-SALES |
1 x | FASTENER - SCWS 8-PK GLS CLIP# 8-32 x 3/8" PH TORX TYPE F |
1 x | N/S : ROCK WOOL 17 GRAMS 30 INCH |
1 x | LOG, RIGHT BOTTOM LS59(#5)# LODGE PINE |
1 x | PILOT ASSY w/SLEEVE 430/616EG# 2-WY |
1 x | COVER PLATE w/GSKT FWL AIR CONTROL |
1 x | Tl3 Damper Arm Gear-sales |
1 x | Terminal Block |
1 x | Xxv Ul Snout Weldment |
1 x | HW PACK, DOOR - 36 DBL DR |
1 x | MAGNET, NEODYMIUM DISC, 10PK DAVINCI, 1/2"dia. x 1/8"thk. |
1 x | Explosion Door Handle (Each) |
1 x | KNOB (PLASTIC), RHEOSTATS # BLACK w/WHITE LINE - GAS/WOOD |
1 x | 22 GLOWING EMBERS |
1 x | E30 GLASS C/W GASKET (21.75" X 13.575") |
1 x | Inlet Air Collar Assy |
1 x | 1.45mm M-10 Body Style |
1 x | 1/4" SPRING PIN |
1 x | #8-32 X 3/8 Ph Flat Cs |
1 x | MAGNAHELIC GAUGE & KIT (FOR TESTING PELLET STOVES) |
1 x | Country Classic Tool Set |
1 x | ORIFICE, BURNER - No. 46 1.180" BRASS HEX (.081 dia) |
1 x | 26 OFF WIRING HARNESS |
1 x | Hopper Switch Retrofit Kit |
1 x | EMBERS, ROCK-WOOL 5 gram# |
1 x | Heat Shield Top |
1 x | LOG, RIGHT - LS44/46 (#5)# CLASSIC |
1 x | CHIMNEY BRACKET (3) w/ SCREWS |
1 x | Snap Disc Control (blower |
1 x | Manual Reset High Limit Thermodisc |
1 x | Bostonian Curved Fire Screen - Large / PC - Black |
1 x | Door Mounting Bracket Antique Gold Left - Double Door |
1 x | WIRE HRNS, JUMPER, BLWR/PILOT VARIOUS GSR2 MODELS |
1 x | BLOWER, CONV, FPX, NO HOUSING# ALL WOOD FIREPLACES |
1 x | Transflo Blower - Motor Only |
1 x | Bracket Hs-cdw |
1 x | 4 MANIFOLD FLEX PIPE |
1 x | PILOT SHIELD - UNIVERSAL# VARIOUS MODELS |
1 x | HB35 RIGHT SIDE BRICK PAN |
1 x | Pressure Relief Plate Bottom Firebox Gasket |
1 x | 14 TUBE FITTING |
1 x | Novasit Pilot Assembly - LP |
5 x | Spark Generator Battery Holder |
1 x | AUTO DRAFT CONTROL-SALES |
1 x | FLEX 95 1989 |
1 x | Fan Speed Controller Knob - White |
1 x | Twigs Flat Screen - New! |
1 x | 10 ACS SWITCH / |
1 x | EMBERS, ROCK-WOOL 50 grams# 8X10 BAG |
1 x | Xxv Top-charcoal |
1 x | HW PACK, LEG CLIP - MOBILE# HOME INSTALLATION |
1 x | 50* Rh Door Assembly |
1 x | Hopper Lid Switch |
1 x | 43" Board / Single Cut |
1 x | DRAFT (FLOW) SWITCH# ALL PS/PI/EXTREME |
1 x | THERMO-COUPLE - SIT # USE w/SIT PILOT ONLY |
1 x | Top Brick Retainer Bracket |
1 x | Glass Clip - Bottom Edge |
1 x | 28 POWER CORD |
1 x | MAGNET w/SHEATH 1.000 x .750" 1/4" THICK |
1 x | Assy, Door Int Linear See-thru |
2 x | Burner Orifice # 50 - LP 99/00/01/02/03/04 |
1 x | Mag Door Latch-set Of 4 |
1 x | 21 CHARCOAL EMBERS |
1 x | BLOWER, CONV, FPX, NO HOUSING# ALL WOOD FIREPLACES |
1 x | RHEOSTAT PLATE SCREWS, BRASS SET OF 2 - 36A/E, 44A/E |
1 x | Valve Assembly Gasket |
1 x | Brnr Main Non-lx/fs Lp Un |
1 x | 2 : TOP (REPLACES 1306760) |
1 x | 1 WIRE HARNESS POWER CORD |
1 x | AUGER BRASS BUSHINGS (SET OF 2 x 3/4"ID,1 x 5/8"ID) |
1 x | GLASS w/GASKET - 864 TRV/ST# TEMPERED GLASS |
1 x | Rear Pressure Relief/Explosion Door Gasket |
1 x | BRICK-CUT, 9 x 3-13/64 |
1 x | BATTERY TRAY, GS - "AA" SERVICE PART |
1 x | BRICK-CUT, ANGLE CUT 6-3/8 x 4-1/2 x 59 deg @3-3/4 |
1 x | HINGE KIT, DOOR - FWP/LFW TOP/BOTTOM w/ fasteners |
1 x | Cstg-airmate-dw2000-black |
1 x | N/S : MIDLOG SERVICE KIT |
1 x | PAINT, METALLIC BLACK 3oz# SPRAY CAN |
1 x | BAFFLE FRONT, NX GEN FW MED MED. FLUSHWOOD |
1 x | Nut-10-24 Acorn Nut |
1 x | LOG, REAR LS59(#1)# LODGE PINE |
1 x | X-88 1988 |
1 x | FLUE COLLAR ASSY, 864 INTAKE/EXHAUST PIPE |
1 x | 16" FasNSeal Universal Appliance Adapter |
1 x | Valve Assembly Gasket |
2 x | 1 : PIEZO IGNITOR |
1 x | DOOR SWITCH, FPX WOOD# BLWR CUT-OFF |
1 x | D/bvg/gin/flx Snapdisc |
1 x | HANDLE (WOOD), DOOR - AVALON# 1/2" id x 4.169" LONG |
1 x | 49" Board / Single Cut |
2 x | 6 : FRONT INJECTOR NG NO. 42 |
1 x | FLUE ADAPTER, DV 8" TO 6-5/8"* 810004994 |
1 x | 8a : REGULATOR LP - MANUAL |
1 x | CONV PARTS, NG - SIT # 21DV/RV/HDAWY/ SWTDRMS - EF |
1 x | 3/16 Pilot Tube Cut Into |
2 x | Trim Rail Brkt (nielsen) |
1 x | DOOR, HINGE ADJUSTABLE DVL FS GAS - 1998-08 |
1 x | VENT, WOOD ZC LINER KIT 35* 810007152 |
1 x | Novasit Regulator - LP |
1 x | LOG, REAR - LS46 (#3)# |
1 x | Round Magnet - Screen Door (Each) |
1 x | DuraFlex AL Kit |
1 x | BOSTON FPI CAST SURROUND SIDE |
1 x | 24" Double Wall Vent Length |
1 x | PILOT TUBE S.I.T - GS# SERVICE PARTS |
1 x | Leg Leveling Kit |
1 x | Ass'y Canopy Dfx24 Rev C |
1 x | Robertshaw Regulator - NG |
1 x | Bulk50-sae Fw 5/16x11/16 |
1 x | GSKT 50", COMBUSTOR, INTERRAM# (1) - 50" LENGTH |
1 x | AIRTUBE KIT, L-26 LFW HYBRID# LARGE FLUSH WOOD INSERT |
1 x | FACE SCREW, BLACK # BLACK, 1"-1/4-20 PHPMS - 6 PK |
1 x | Hpr Switch Fdr Fitting-2 |
1 x | High-Wind Cap |
1 x | DOWEL PIN, DOOR LATCH, 5-PK UNIVERSAL |
1 x | Bulk50-rev Locknut 1/4-20 |
1 x | EMBERS, ROCK-WOOL 50 grams# 8X10 BAG |
1 x | WIRE HRNS, THERMOSTAT (20') VARIOUS MODELS |
1 x | E33-LOG BURNER CONV KIT-NG TO LP |
1 x | EXHST/INTAKE CVRS w/GSKTS w/FASTENERS - 564 |
1 x | 5/8" Door Gasket Repair Kit |
1 x | 10" FasNSeal Universal Appliance Adapter |
1 x | GSKT (2), IGNITER F/S GREENSTART IGN, STOVE |
1 x | Door Handle/Latch Assembly |
1 x | SWITCH, ROCKER, ON/OFF# SINGLE-POLE, VARIOUS GAS UNITS |
1 x | 3 : REAR BURNER NG |
1 x | CATALYTIC HOLDER, FPX 44A # 1992-97 |
1 x | Ash Extraction assembly - Complete |
1 x | DAMPER BYPASS SLIDE PLATE |
1 x | PIPE ADAPTER, 3/8 FLARE x3/8M 3/8 FLARE x 3/8 MPT - 1/4 FPT |
1 x | COVER HANDLE (X2 FOR GSS48COV) |
2 x | 6 : SCREW-NO.8 X 1/2IN. TRUSS PH SMS-B/Z |
1 x | Log Set - Complete 99/00/01/02/03/04 *** |
1 x | 16" FasNSeal Universal Appliance Adapter |
1 x | GSKT TADPOLE,3/8 x3/4 PSA BLK# 12' BULK LENGTH |
1 x | CNTRL PANL-ASS'Y, 31/33 DVi GS - SERVICE PART |
1 x | Convection Fan |
1 x | BURNER, (EF) - 2004-08 # 21DV TV-RV/HIDEAWAY/SWEET DRMS |
1 x | GRMT/SPACER (4) - BLOWER# 1997+ PEL/1995+ GAS |
1 x | On/Off Switch Assembly Complete |
1 x | GLASS w/GASKET - HER BAY SIDE# (B/DV/DVL)LIMITED AVAILABILITY |
1 x | ORIFICE, BURNER - No. 56# 1.180" BRASS HEX (.0465 dia) |
1 x | $ E30G - GLASS BURNER CONVERSION KIT - NG TO LP |
1 x | BAFFLE REAR (FWP)# 12 GA 304 SS - 24.575 X 10.843 |
1 x | HANDLE (WOOD), DOOR# w/ SCW 1/4-20 x 1-1/4" BLK |
1 x | DOOR LATCH KIT, 36 "A"/ ELITE RIGHT SIDE DOOR |
1 x | FLEX PIPE, 3/8"od x 12 BLK NO FITTINGS |
1 x | Travis Industries Appliance Connector |
1 x | BRICK, SET OF 8, FULL SIZE* |
1 x | Bulk100-rphms 10-32 X 3/8 |
2 x | Valve Assembly - LP |
1 x | E33 DOOR LATCH MECHANISM (SET 2) |
2 x | 9B : PILOT LP |
1 x | Blower Uppco Dfx24 Servic |
1 x | 15 SECURING PLATE |
1 x | VALVE REGULATOR, LP MAN HI-LO# SIT 907.010 (11" - 2.9") GS |
1 x | Brkt Pilot For Service |
1 x | Hopper Lid Switch |
1 x | RHEOSTAT WALL PLATE, WHITE POWER HEAT-DUCT KIT |
1 x | 4x6 120" DVA Concentric Flex |
1 x | FILTER BOX-FURNACE |
1 x | BLOWER ASS'Y, LEFT - FW# FW/FWP/LFW INSERTS |
2 x | Mill Pac Direct Vent Pipe Sealant - Tube |
1 x | 891169 HOSE, HEATER 2 |
1 x | 3DF304 Custom Length Per Foot |
1 x | 891331 SPRING HANDLE - BRUSHED NICKEL 1 |
1 x | 3 : REAR BURNER NG |
1 x | Screens |
1 x | 891284 ACCESS PANEL, AGITATOR MOTOR 1 |
1 x | 4x6 36" DVA Concentric Flex |
1 x | VALVE, PROFLAME GS - SIT# GAS CNTRL VALVE - NG REG |
1 x | BOSTON FPI DOOR ASSEMBLY (NO HANDLE) |
1 x | STUD PLATE/HW ASSEMBLY SM PI/PS |
1 x | THERMO-COUPLE (10Pk) - RS# DV 95 & UP, B-VENT 96 & UP |
1 x | 891195 BRKT, DRIVE MOTOR (25495L) 1 |
1 x | Door Frame Only {1999 to Present} |
1 x | N/S : TRIM RAIL BRKT |
1 x | 1450 Cfm Single-speed Blower |
1 x | PAINT, METALLIC BLACK 3oz# SPRAY CAN |
1 x | Fan Switch Assembly Complete |
1 x | Glass Fuse for Digital Board (5 Amp) (5 pack) |
1 x | Leg Cast - Charcoal Grey |
3 x | Embers - Bag |
1 x | FIREBACK, 564 SS BRICK/HERR* |
1 x | HANDLE (SPRING), A/C - BRS # 3/8" id x 2.500" LONG |
1 x | BATTERY TRAY, GS - "AA" SERVICE PART |
1 x | FASTENER - KEPS NUT, 10 PK 8-32 |
1 x | DOOR CAM, BRASS # VARIOUS MODELS |
1 x | LOG EMBERS, LARGE BAG # 12oz. BAG |
1 x | Galvanized Steel Tub: Oval / Galvanized Steel |
1 x | BLOWER w/MTNG PLATE# 21 RV/TRV's |
1 x | BURNER SPRT BRKTS L & R 564SS SERVICE PARTS |
2 x | 10 : SCREW NO.6X3/4 PPH YELLOW ZINC |
1 x | GSKT, WIRE PLATE VARIOUS UNITS - 2" x 1-1/4" |
1 x | 3 HOLE GRATE LINK-CAST |
1 x | LOG, LEFT TWIG (BOTTOM) -LS31# |
1 x | Pilot Ods Rp Op#8404 |
1 x | SHUT-OFF VALVE# VARIOUS GAS UNITS |
1 x | BLOWER, LT, GAS INS - 2005+ # EF-II/DVS/DVL/31/33 |
1 x | AC ADAPTER, 7v # BASE GRN SMT APPLIANCES ONLY |
1 x | Extra Long Rope Design Tongs - 36" L |
1 x | SWITCH, PILOT ON/OFF - GS# (GREENSMART PILOT CONTROL) |
1 x | English Tool Set |
1 x | ANDIRON, TRADITIONAL RING* 564 SS |
1 x | PAINT, METALLIC BLACK 3oz# SPRAY CAN |
1 x | DOOR PINS 3/8X2-1/4-SALES |
1 x | Graphite Wright Design Wood Holder |
1 x | EMBERS, ROCK-WOOL 5 gram# |
1 x | TEMP PROBE, FOR DIGITAL METER# ALL MDLS EXPECT APEX 42 |
1 x | DOOR, HINGE PINS, BLACK# 2-PK, FS/INS |
1 x | POWER CORD, w/MOLEX (18 GA) # UNIVERSAL - WOOD & GAS |
1 x | 31" Board / Double Cut |
1 x | N/S : SMOKE SHIELD (STAINLESS) |
1 x | SPACER, 1/4 dia. x .312 - BLK 4 PACK - VARIOUS UNITS |
1 x | HANDLE, BLK PHENOLIC,DR 36/44# FPX WOOD w/STUD |
1 x | PAINT, METALLIC BLACK 3oz# SPRAY CAN |
1 x | 5x8 120" DVA Concentric Raw Flex |
1 x | BURNER RETROFIT, EF, CAST,v.2# BERKSHIRE / PRAIRIE |
1 x | AUGER FLIGHT 2" PITCH# AGP/FXFR/DRFLD |
1 x | VENT, WD MASONRYLINER KIT 35* 810001931 |
1 x | SWITCH, ROCKER, ON/OFF# SINGLE-POLE, VARIOUS GAS UNITS |
1 x | LOG SET, INS EG OAK M* 430 EG & DVS EG |
2 x | 12B : R/S (ON/OFF SWITCH) |
1 x | FIRESTOP |
1 x | GSKT TADPOLE,3/8 x3/4 PSA BLK# 12' BULK LENGTH |
1 x | Screens |
1 x | PILOT, RETRO KIT - PSE 2-WY# NG/LP - GS/GSR/GSR2 |
1 x | SPACER, 1/4 dia. x .312 - BLK 4 PACK - VARIOUS UNITS |
1 x | INJECTOR, PILOT - NG (#62)# USE w/SIT PILOT ONLY |
1 x | FACE AIR BAFFLE - 864 WILIMINGTON/LEGACY |
1 x | 3 GRATE HOLDER-CAST |
1 x | FC 3/4 Mesh Slip-In Round Cap 11" |
1 x | 9 : KNOB |
1 x | ELEC JUNCTION BOX 564/864 GS |
1 x | WIRE HRNS, BLOWER, FWI # FLUSH WOOD INS |
1 x | Masonry Adapter Plate 8x17 |
2 x | 22 : WIRE HARNESS FEMALE-MILLIVOLT CONTROL |
1 x | Fan Motor Gasket |
1 x | SWITCH, COMFORT CNTRL / GS# DBL POLE |
1 x | Screens |
1 x | VENT, WD MASONRY LINER KIT 15* 810001927 |
1 x | SHUT-OFF VALVE, GAS# 1/2 INLT, 3/8 FLARE TUBE OUTLT |
1 x | 5 HOLE GRATE LINK-CAST |
1 x | VALVE ASS'Y, NG 864 ST GS/GS2 w/ DUAL SPLIT FLOW |
1 x | N/S : FIREBRICK SCREWS |
1 x | SWITCH, COMFORT CNTRL / GS# DBL POLE |
1 x | STUD PLATE - SIDE GLASS CLIP SPDV/SPTBAY |
1 x | MERIDIAN FIREBOX DOOR HINGE (PRE JAN 08) |
1 x | 7/8" Door Gasket Repair Kit |
1 x | CHIMNEY ADAPTER |
1 x | FINISH SUPPORT WITH COUPLER |
1 x | WIRE HRNS PIG-TAIL, FEMALE 3-PIN, PWR DUCT KIT |
1 x | VALVE REGULATOR, NG SIT# S.I.T. 907.205 ( 2.2 - 3.5) |
1 x | FUSE -5AMP 5-PK CNTRL BOARD # DIAGNOSTIC BOARD 2006' |
1 x | WIRE HRNS, MAIN - DVS/DVL# ZC FIREPLACE - 1997-2007 |
1 x | GSKT, GLASS 3/4" WIDE x 70"# LOPI WOOD, PELLET & GAS |
1 x | 10" W2 Appliance Adapter |
1 x | HINGE ASS'Y, DOOR - LG/SD BLK SOCKET & PIN |
2 x | Wire Harness |
1 x | ORIFICE, BURNER - No. 49 # 1.180" BRASS HEX (.073 dia) |
1 x | Louver Form 22.213 Vmi |
1 x | RHEO ASSY, SINGLE BLACK PLATE# 36 & 44 A/BI/ELITE |
1 x | INJECTOR, PILOT - LP (#35) # USE w/SIT PILOT ONLY |
1 x | Grate Weldment |
1 x | BRKT, BTM FEED TUBE MOTOR STOP INCLUDED |
1 x | Flue Adaptor Assembly |
1 x | MANUAL, 864 ST (GS) 2009 (INSTALLATION) |
1 x | LOG EMBERS, SMALL BAG # 4 oz. bag |
1 x | 4x6 60" DVA Concentric Raw Flex |
1 x | FIREBACK, NORTHFIELD NEW IRON (NEW IRON) - CAST IRON |
1 x | GSKT, ASH PAN DOOR - AGP# 5/8" dia, BLACK- 60" |
1 x | 9B : VALVE UV SIT 820.636 RP |
1 x | LOG EMBERS, SMALL BAG # 4 oz. bag |
1 x | GLASS w/FRAME - 564# FINGER-PULL LATCH - SS/DF/DLX |
2 x | 9A : VALVE UV SIT 820.637 RN |
1 x | Piezo Kit Bracket Include |
1 x | WIRE HRNS, ACCENT LIGHT 616/430 EG MDLS |
1 x | TL2.0/2.6MODERN TRIM-BRSS |
1 x | WIRE HRNS, ON/OFF VARIOUS MODELS |
1 x | LIBERTY S/N'S 8500-27790 |
1 x | BURNER FLOOR EMBER LFT/RHT# 1 (SET) DVS I (GS) |
1 x | Pellet Tailpipe-cast |
1 x | 4X6 Co-Linear Adapter Kit |
1 x | DECORATIVE COLLAR DVL CONNECTOR |
1 x | TIMING BLOCK KIT, 646 91-96# PELLET STOVE/INSERT (AUGER) |
1 x | DRAW LATCH, DOOR/FLUE w/ RIVETS - VARIOUS PEL/GAS |
1 x | FILTER BOX-FURNACE |
1 x | REFRACTORY CLIP DVS INSRT/ZC PRE-2006' |
1 x | GSKT, EXH. CONNECTOR - 864 12.575" x 6" |
1 x | GLASS LATCH - FINGER-PULL# vr.2, 2007+ |
1 x | BOSTON FPI CAST BASE (CENTER) |
1 x | BRICK BRACKET-SALES |
1 x | HEARTH PLATE - 564SS SERVICE PART |
1 x | AIR FILTERS-14X20X1-12PK |
1 x | GLASS LATCH, SPRING PIN INS VARIOUS MODELS |
1 x | Burn Pot Top Ring |
1 x | Manual Reset High Limit Thermodisc |
1 x | STEPPER MOTOR, NG GS2# GS2/GSR/GSR2 - 3.5"-1.6" WC |
1 x | CHIMNEY BRACKET (3) w/ SCREWS |
1 x | Hf60 Fdr Cover Left-sales |
1 x | Plate Surround Side For S |
1 x | Fireplace Crane - 24\" Swivel Arm |
1 x | GSKT, DOOR 80" BLK FLUSH WD# ROPE - 3/8" dia.(FW/ FWP/LFW) |
1 x | BRUSH, BENT HANDLE # COMBUSTOR/FIREBOX BROOM |
1 x | 891341 Shaker Bar 1 |
1 x | ANDIRON - ARBOR METALIC BLACK CAST WOODSTOVE - 1 PAIR |
1 x | POWER CORD, w/MOLEX (18 GA) # UNIVERSAL - WOOD & GAS |
1 x | INJECTOR, PILOT - LP (#35) # USE w/SIT PILOT ONLY |
1 x | 16 : FAN TEMPERATURE SENSOR |
1 x | FLEX PIPE, 3/8"od x8" BLK NO-FITTINGS |
1 x | FLEX PIPE, 3/8"od x8" BLK NO-FITTINGS |
1 x | BRICK-CUT, 9 x 3 |
1 x | CONTROL PANEL, PAINTED BLACK POWDER COATING N/A |
1 x | HW PACK, BLOWER 564/864 FOR NON-GS MODELS ONLY |
1 x | Fireback Supports |
1 x | BAFFLE FRONT, NX GEN FW MED MED. FLUSHWOOD |
1 x | BLOWER, RT, GAS INS - 2005+ # EF-II/DVS/DVL/31/33 |
1 x | BRICK-WHOLE,9 x 4-1/2 x 1-1/4# STANDARD FIREBRICK |
1 x | GSKT TADPOLE,3/8 x3/4 PSA BLK# 12' BULK LENGTH |
1 x | MAGNET w/OUT SHEATH w/ MOUNTING HW |
1 x | SPACER, 1/4 dia. x .312 - BLK 4 PACK - VARIOUS UNITS |
1 x | HANDLE (WOOD), DOOR# w/ SCW 1/4-20 x 1-1/4" BLK |
1 x | Grate Assembly |
1 x | Valve Assembly - NG |
1 x | FIREBACK, 564 LEDGESTONE* |
1 x | 891373 PAD, DOOR HINGE (THREADED) 2 |
1 x | MANUAL, RADIANT GSB2 - LARGE 2017 |
1 x | MAGNET w/SHEATH 1.000 x .750" 1/4" THICK |
1 x | 20 : TRIM LEFT |
1 x | DOOR ASSY, ARCH - LFW-H COMPLETE w/GSKT & GLASS |
1 x | GSKT, IGNITER GREENSTART IGN, INSERT |
1 x | GSKT, PILOT ASSY, GS# ALL GREENSMART UNITS |
1 x | 9B : PILOT NG |
1 x | Masonry Adapter Plate 8x13 |
1 x | LOG EMBERS, LARGE BAG # 12oz. BAG |
1 x | LEVELING BOLT[4], CST/BRS LEG# 1/4-20 w/RUBBER TIPS |
1 x | FLAT ROOF FLASHING |
1 x | GSKT, INTAKE - 864 864 HH/ST/TRV |
1 x | ORIFICE, BURNER - No. 49 # 1.180" BRASS HEX (.073 dia) |
1 x | GSKT, BYPASS, KAOWOOL# REVERE/X-NT /1750 |
1 x | VENT SLIDER ASS'Y, DVL INS 2005/GSR/33 |
1 x | 1200/1700 RIGHT SHIELD ASSEMBLY |
1 x | BLOWER, RT, GAS INS - 2005+ # EF-II/DVS/DVL/31/33 |
1 x | THERMO-PILE (10-PK) - RS# ALL BV/DV/ w/ ROBERT SHAW PILOT |
1 x | HANDLE ASSY, AVA w/BRASS CAM # & WOOD HANDLE - COMPLETE |
1 x | FRONT PLATE w/SILK SCRN LBL 21/864ST/564/31/33 GS |
1 x | Control Membrane Pad |
1 x | HOPPER ASSEMBLY-SALES |
1 x | 4x6 60" DVA Concentric Flex |
1 x | VENT, LARGE F/S MINIMUM KIT D* CYPRESS / GREENFIELD |
1 x | 7 : VALVE REGULATOR NG MANUAL |
1 x | ORIFICE, BURNER - 1.2mm 1.180 BRS HEX (.047/1.2mm dia) |
1 x | E33G OWNERS MANUAL |
1 x | DuraFlex AL Kit |
1 x | HRD METER SHAFT (VR1) AGP PS/PI - CHECK SERIAL# |
1 x | KIBBLE SUPPORT (GREENFIELD) 18 GA ALZ - 9.000 X 5.949 |
1 x | 5/8" Collar with Set Screw |
1 x | INJECTOR, PILOT - LP (#35) # USE w/SIT PILOT ONLY |
1 x | 4 x 6 Flex Kit |
1 x | FUSE-PK, GRN-SMRT FAN MODULE# 5 AMP/ 6AMP - ONE EACH |
1 x | BOSTON FPI CAST BASE (RIGHT) |
1 x | INSULATED ELBOW 15 DEGREE Stainless Steel Outer |
1 x | 4000w Tadpole Gskt-10 Ft |
1 x | BOSTON 1700-C FS CAST TOP-PD |
1 x | LIGHT BRKT ASSY-864 TRV GS/564 LED |
1 x | BATTERY HOLDER, GSR-2# PRO-FLAME-2 |
1 x | GLASS, SMALL LOPI# 8-7/8 x15-3/8" GSKT NOT INCLD |
1 x | Hf60 Wiring Harness |
1 x | VALVE, NG DV, RBRTSHW 96 & UP# ONLY FOR NATURAL GAS FUEL |
1 x | FLUE HANDLE - DVS/DVL INSERT SERVICE PART |
1 x | MANUAL, 564 DF GS INSTALL 2010N |
1 x | GLASS LATCH - FINGER-PULL# vr.2, 2007+ |
1 x | PILOT ELECTRODE - SIT# SENSING ELECTRODE - SIT PILOT |
1 x | VENT, WD MASONRYLINER KIT 35* 810001931 |
1 x | FLEX PIPE, 3/8"od x 12 BLK NO FITTINGS |
1 x | P38 Hopper/lid Asy-sales |
1 x | Flue Opening Cover |
1 x | 7 : VALVE REGULATOR LP |
1 x | 45deg Double Wall Elbow |
1 x | Rear Log Bracket Assembly |
1 x | STAGE MODULE S350AA-1C |
1 x | 5B : VALVE LP HI/LOW |
1 x | 16 : KNOB EXT ON/OFF-MILLIVOLT CONTROL |
1 x | CNTRL MODULE, BASIC FUNCTION# GSB2 MODELS |
1 x | Fan Limit Switch |
1 x | DIFFUSER, w/ SCWS VARIOUS MODELS |
1 x | Bracket Vents Top/Bottom |
1 x | 1-1/2IN SHAKER BAR-SALES |
1 x | 4DT-48 48" DIRECT TEMP PIPE BLACK |
1 x | FUSE HOLDER- GS2 # NO FUSE |
1 x | LOG EMBERS, SMALL BAG # 4 oz. bag |
1 x | BRICK-WHOLE,9 x 4-1/2 x 1-1/4# STANDARD FIREBRICK |
1 x | Vacuum Switch |
1 x | Full Skid Of Brick-sales |
1 x | COIL HOLE-SALES |
1 x | Assy Trim Dfx24c/dbx24c B |
1 x | FASTENER - SCW, 5 PK NAME TAG #10 x 3/8 RHW BLK ZINC |
1 x | LOG EMBERS, LARGE BAG # 12oz. BAG |
1 x | GLASS w/ FRM, SPRG PIN ASSY# 33DVi/RAD LG/DVL INS 2005+ |
1 x | Spring Clip-20 Pack |
1 x | 3'W2 Appliance Adapter |
1 x | N/S : TUBE-VALVE/VENTURI |
1 x | DuraFlex AL Kit |
1 x | EMBER SHELF ASS'Y, RT - 33DVi NO MNTG TAB |
1 x | SPACER, 1/4 dia. x .312 - BLK 4 PACK - VARIOUS UNITS |
1 x | N/S : MIDLOG BRACKET |
1 x | MAGNET w/OUT SHEATH w/ MOUNTING HW |
1 x | FC 3/4 Mesh Slip-In Round Cap 9" |
1 x | Damper Rod Weldment-tl2.0 |
1 x | HW PACK, FACE, ARC GLD, 44/36# w/ (12) SCREWS |
1 x | 4a : ODS PILOT ASSEMBLY LP - MANUAL |
1 x | INSULATED WALL THIMBLE |
1 x | Tall Cone Flat Flashing |
1 x | 13 : COTTAGE RED FIREBRICK-LEFT SIDE |
1 x | Love Joy With Set Screw (Each) - 2 Per |
1 x | RHEO w/OFF, 90v, RECT (MM)# w/NUT & WASHER |
1 x | Door Right Cast - Midnight Blue |
1 x | 891364 HEARTH PLATE 1 |
1 x | 8 X 25' LENGTH |
1 x | 8 X 20' LENGTH |
1 x | DOOR, LOPI WOOD SM BLK* USE W/ MODELS W/ CAST ASHLIP |
1 x | Screens |
1 x | Pressure Relief Bolts 3 1/2 Inches Long |
1 x | PILOT ELECTRODE - SIT# SPARK ELECTRODE - SIT PILOT |
1 x | Speaker Terminal--Thermostat |
1 x | Tee Cap |
1 x | Tee Cap |
1 x | Boot Tee |
1 x | Tee Cap |
1 x | 1 : BURNER - NG |
1 x | DuraFlex AL Kit |
1 x | ORIFICE, BURNER - No. 48 1.180" BRASS HXE (.076 dia) |
1 x | 16" Dia Test Port W2 |
1 x | MOTOR COVER-PAINTED-SALES |
1 x | Cotter Pin |
1 x | Replacement Glass (9 1/8" X 15 5/8") |
1 x | Wire - Battery Connector - Negative - Black |
1 x | RHEOSTAT PLATE SCREWS, BLACK SET OF 2 - 36A/E, 44A/E |
1 x | ORIFICE, BURNER - No. 44 1.180 BRS HEX (.086) |
1 x | 11 : FRONT FACE |
1 x | FIREBACK, DVL HANDMADE BRICK* |
1 x | THERMO-PILE - SIT # SIT PILOT 1999-2009 |
1 x | SNAP-DISC/BRKT ASSY - FW# BLWR - FW/FWP/LFW |
1 x | Left Middle Log #5 - Dfx3 |
1 x | 891187 BRKT,PRESSURE SWITCH/PCB 1 |
1 x | KNOB (PLASTIC), RHEOSTATS # BLACK w/WHITE LINE - GAS/WOOD |
1 x | GLASS w/FRAME - 564# FINGER-PULL LATCH - SS/DF/DLX |
1 x | Damper Control Knob, York Insert |
1 x | BURNER COVER, 564 DIAMOND FYRE CAST IRON |
1 x | 3"DFSW-25KT |
1 x | 8 X 25' LENGTH |
1 x | 7 X 15' LENGTH |
1 x | Xxv Ashlip W/paint-sales |
1 x | 4 X 25' LENGTH |
1 x | 4 X 20' LENGTH |
|
$187,635.12 |
Shipping Charges |