1 x | 5/8" Door Gasket Rope (80") |
1 x | 54" Surround, Black Added Depth |
2 x | Fan Speed Control (Rheostat) 99/00/01/02/03/04 |
1 x | Ash door handle |
1 x | Glass Gasket |
1 x | Burner Tube Assembly - NG/LP |
1 x | Door Gasket |
1 x | Handle Mount Plate |
2 x | 3-Way Gold Contact Switch 99/00/01/02/03/04 |
1 x | Outside Air Kit With Duct |
1 x | HB38 30IN SCROLL DOOR |
1 x | Fan Wiring Harness |
1 x | Sage w/ Ivory Trim Canvas Log Carrier |
1 x | BRASS MALE COMP FITTING |
2 x | Glass Media, 5LB Bag, Reflective Black |
1 x | HB38 ARCH OPENFACE |
1 x | Firebox Canopy, Powder Coat |
3 x | Novasit Pilot orifice |
1 x | Door Handle w/ Black Oxide Finish |
1 x | HB38 DUAL BURNER REMOTE |
3 x | Tan/Navy Canvas Log Carrier |
1 x | Novasit Pilot Orifice - LP |
2 x | Green/Navy Canvas Log Carrier |
1 x | Burn Pot Cleanout-sales |
1 x | Fan Assembly |
1 x | 36" Drain Pan w/ 1" Stainless Decorative Face Ext. |
1 x | Gas Ng Pilot Complete-pse |
1 x | 6.0 lb. Bag Smooth Glass Pebbles, Green |
1 x | 1450 Cfm Single-speed Blower |
2 x | 4000w Tadpole Gskt-10 Ft |
1 x | 3500 JCKT SIDE W/O HOLE-S |
1 x | Glass Media, 5LB Bag, Reflective Blue |
1 x | Control Board Knob Pkg-10 |
2 x | Suede (Dark Brown) Log Carrier |
2 x | Explosion Door Handle |
4 x | 4" Air Kit, Collar & Hood Only |
1 x | 36" Outdoor Bi-Fold Glass Door, Platinum Finish |
1 x | 1/8 Inch Fiberglas 2 X 4 |
1 x | Flame Guide-38p/p61/100 |
1 x | Nickel Coil |
1 x | Decorative Face Trim, Aged Copper |
2 x | Duplex Receptacle Box |
1 x | Glass |
1 x | Novasit Electrode - Short |
1 x | Nickel Coil |
1 x | Open End Log Carrier - Ochre |
1 x | 5in Single Paddle Blade |
1 x | COIL HOLE-SALES |
1 x | Comb Blwr Gasket-3 Pack |
1 x | 5/8" Glass Gasket Kit (includes 47") |
1 x | Glass Clip - Bottom Edge |
1 x | 6.0 lb. Bag Smooth Glass Pebbles, Amber |
1 x | Door Handle w/ Black Oxide Finish |
3 x | Outside Air Kit Collar, Hood & 3' Flex for Floor Venting |
2 x | 1in Single Ply-10 Ft/kit |
1 x | Inner Top Baffle Plate |
1 x | Junction Box Kit (Required with Blower) |
1 x | Novasit Pilot Assembly - LP |
1 x | Bulk50-hcs 5mm X 8mm Z |
1 x | Thermostatic Fan DV and VF units only |
1 x | Brown Open End Log Carrier |
1 x | Fan Thermodisc (60T12) 110 Degree |
1 x | ADC MOTOR MOUNT-SALES KB |
1 x | ASH PAN-SALES |
2 x | Robertshaw Regulator - NG |
1 x | HB38 DUCT ASY-SALES |
1 x | 2500/2600/3500 SHAKER BKT |
4 x | Standard Single Speed |
1 x | 3500 JACKET SIDE W/HOLE-S |
1 x | Box-4x4 Steel Bin |
1 x | 1/2 Pillow Block-4 Pack |
2 x | 3 GRATE HOLDER-CAST |
1 x | 6.0 lb. Bag Smooth Glass Pebbles, Blue |
1 x | Door Hinge Pins - 1/2" x 2" |
1 x | 19-5/8 X 32-5/8 RECTGLASS |
2 x | # 31 burner orifice |
1 x | Burn Pot/tailpipe Gaskets |
11 x | 5/32" Allen key |
1 x | Log Set - Complete |
2 x | 3-Blade Fan WB & VF only |
1 x | 3/4" Glass Gasket Kit (includes 20" and 80" of 80P20027) |
1 x | 6 HOLE GRATE LINK-CAST |
1 x | Motor Retainer Bracket |
4 x | # 37 burner orifice |
1 x | SCREW-SSSKN5/16-18 X 1/4 |
1 x | Acc Ash Pan-sales |
2 x | Wall Switch Kit, On/Off, White |
3 x | 50 piece Bulk Outside Air Kit - Collar Only Kit |
1 x | AIR INTAKE COVERS (SET OF 4) |
1 x | Fan Access/Cover Plate |
1 x | Terminal Block |
1 x | 300i Blwr Brkt-left-sales |
1 x | Motor Mount Bracket Assembly |
1 x | CAST GRATE - AC |
1 x | Glass Media, 5LB Bag, Goldfinger |
1 x | 820 NOVA VALVE-PROPANE |
1 x | CAST ASH SHELF - AC |
1 x | 16.5in Br Ss Ashlip Trim |
1 x | Glass W/gasket |
2 x | Glowing Embers |
6 x | Variable Speed with Wall Switch |
1 x | 42" Perimeter Trim - Platinum |
1 x | Handle Asy-sms,tl3,68,xxv |
1 x | Buff Brick Liner Kit 45 |
1 x | DOOR PINS 3/8X2-1/4-SALES |
1 x | SMALL FLUSH HYBRID-FYRE INSERT |
4 x | (892002) Door Handle, Spring – Gold 1 |
3 x | Wall Mount T-Stat Control Kit |
1 x | Conversion Kit, Electronic, Propane to Natural |
1 x | FLUSH PLUS RECTANGULAR PERFECT FIT |
1 x | P35i 19.5 In Hopper-sales |
1 x | Hpr Switch Fdr Fitting-2 |
3 x | Stacked Rust |
1 x | Bulk100-hcs1/4-20 X 5/8 |
1 x | Control Panel, Digital 1 |
2 x | 1-1/2IN SHAKER BAR-SALES |
1 x | Glass Media, 5LB Bag, Disk, Midnight |
1 x | SNAP BUTTON STUD&SCKT-4PK |
2 x | OLYMPIC INSERT |
1 x | Hopewell Fireback / Cast Iron - Black |
1 x | 3/8in Str Flex Connectbin |
3 x | 4" Air Kit with Collar, Hood & 3' Flex |
1 x | Xxv Door Only-sales |
2 x | Allen Key 3/16'' 99 |
1 x | Acc Base-sales |
1 x | SHAKER BLOCK-SALES |
2 x | 5 HOLE GRATE LINK-CAST |
1 x | Façade, Contemporary, Black |
1 x | Quick Disconnect Gasket (Exhaust) |
1 x | HB35 28IN ARCH SCROLL GRI |
3 x | Embers - Bag |
1 x | Rear Heat Shield-tl2.6 |
2 x | Adjustment Gear Assembly 99/00/01/02/03/04 |
2 x | 2 GRATE HOLDER-CAST |
1 x | Ember/Lava/Vermiculite Package Complete |
4 x | Derated Burner Orifice #52 - LP 99/00/01/02/03/04 |
1 x | 42" Fixed Door, Brushed Brass |
1 x | Glass gasket |
1 x | P35i Circ Brd Plate-sales |
2 x | Dielectric Grease (Packet) |
1 x | SHAKER REPLACEMENT-TLC |
1 x | Tl/dvc/win Paw Bolt-modif |
1 x | LID CATCH-SALES |
1 x | FEEDER BODY-SALES |
1 x | Oak/tl3 Dmpr Linkage-sale |
1 x | Fox Fireback / Cast Iron - Black |
1 x | PENDLETON INSERT 1994-2012 |
1 x | Adv/61a/acc/68/xxv Harnes |
1 x | Burner Orifice #41 - NG 99/00/01/02/03/04 |
1 x | ASH PAN-SALES |
1 x | ALUMINUM HOSE BARB (ALL PELLET) |
1 x | 40” Façade Panel – Black |
1 x | Damper Rod Weldment-tl2.0 |
1 x | CONVECTION BLOWER INSULATOR (GASKET) |
1 x | 4 Output Circ Brd-sales |
1 x | Oak/tl3 Right Brick |
1 x | Façade, Sante Fe, Black |
1 x | P68 Ad Latch Asy-sales |
1 x | Pb105 Hopper Lid Asy-sale |
2 x | Ul Short Fd Cvr&gskt-2set |
1 x | Nut-10-24 Acorn Nut |
1 x | Door - P22, P1000PW - Brushed Nickel (PW) 1 |
1 x | Drain Pan |
1 x | CAST BRICK PANEL SET |
1 x | Cast Door Hinge With Pin |
1 x | 25863 REGULATOR, MANUAL FEED RATE 1 |
1 x | Connector 3/8" Compression X 3/8" Male (Valve |
1 x | Ul Motor Mount W/grommet |
1 x | Burn Pot Cleanout Cover-2 |
1 x | Black 12oz Spray-258h |
1 x | Burner Orifice #55 - LP |
1 x | Receiver and Touch Screen Remote Control Kit |
1 x | 61/a/facc/fxxv Push Arm-s |
1 x | 50" Bi-Fold Door, Brushed Brass |
1 x | Gasket-1/2 Rd Ld-20 Ft |
2 x | Elbow 90-Degree, 8" I.D. |
1 x | Pf1/inv-rs Push Arm-sales |
2 x | Tl3 Ash Door Latch Hdwr |
1 x | Hf60 Outer Skin Rght-sale |
2 x | 1/8 Silicone Tubing-5 Ft |
1 x | TLC ASH DOOR LATCH HDWR |
1 x | Fireplace Insert Insulation (KK0111) |
2 x | Steel Sleeve Bushing |
1 x | Large 3F Screen Child Guard Stove |
1 x | Gravity Kit: 2 Elbows 90-Degree, 2 Telescopic Lengths, 2 Grill S |
2 x | Oak/tl3 Damper Adj Kit |
1 x | Vintage Red Brick Liner Kit 40 |
1 x | PUSHER ARM-SALES |
3 x | Sms/p61 Circ Brd-sales |
1 x | SHAKER SHAFT |
1 x | Dowel Pin-1/4 X 3/8 |
1 x | Spark Guard Screen - 44"W x 33"H |
1 x | Log Carrier Stand |
1 x | 1/2 Spring Handle-3 Pack |
1 x | Window Trim, Side - P24I - Gold 1 |
1 x | GASKET-3/8 RD HD-5 FT |
1 x | 5/8 ID AUGER COLLAR W SCREW |
1 x | 48" Masonry Ceramic Glass Bi-Fold Door, Pewter |
1 x | Façade, Contemporary |
1 x | EcoFlow Conversion Kit, Electronic, Propane to Natural |
1 x | Shaker Log Bin / PC - Roman Bronze |
1 x | Fdr -2cleanout W/gskt-2pk |
1 x | Acc Door-painted-sales |
1 x | Log Carrier & Stand - Leaf End |
1 x | Motor retainer bracket |
1 x | Tl2.6 Ash Pan-(pedestal) |
1 x | Antique Brass Plated & Black - 21" L |
1 x | Face Plate, Brushed Nickel |
1 x | Versa Grate Motor with Grease Fitting |
1 x | TLC COAL BAR HOLDERS (2) |
2 x | Set Of 7 Standard Bricks |
1 x | 400 WATT IGNITOR 115V |
1 x | Thermostatic On/Off Remote Control Kit |
2 x | Radiation Shield, 8" I.D. |
1 x | Brass Plated & Black - 21\" L |
1 x | Airwash O Ring-10 Pack |
1 x | HB35 27IN SCROLL DOOR |
1 x | #73 BLANK ORIFICE 3/8" x 27 |
1 x | Ul Fdr Snout Gasket-10 Pk |
1 x | Tl2.0 Blower Blockoff Plt |
1 x | 4 Sided Surround, Trimmable, 46" x 38" |
1 x | Tl300 Ashlip Trim-brush S |
1 x | 300i Airslide Adjust-sale |
1 x | 17-1/2IN FLAPPER-SALES |
1 x | Door – P22, P1000PW – Painted (PW) 1 |
1 x | Flue Collar Heat Shield Vertical - Large |
1 x | Door - P22, P1000PW -Gold 1 |
1 x | Bulk50-hcs1/4-20 X 1/2 G8 |
1 x | Arch Design - Black |
1 x | Air Intake Gasket-set Of6 |
1 x | Pb Ash Door W/relief-sale |
1 x | Hf60 Hopper Lid Asy-sales |
1 x | P35i 23.5 In Hopper-sales |
1 x | BRICK 9 X 4-1/2 X 2-1/2 |
1 x | Length 2ft. |
1 x | TL/DVC BRASS ASHLIP TRIM |
1 x | BLOWER |
1 x | SS Burner Tube for 13-NC (Middle) |
3 x | Brick Clip (Each) |
1 x | Glass Media, 5LB Bag, Disk, Sunset |
1 x | Adjuster Kit |
1 x | Hopper Throat Gasket |
1 x | SNGLE BLK CLASSIC DOORKIT |
1 x | SMS DOOR ASY-SALES |
1 x | Mission Style |
1 x | Grommet 7/16 Id X 3/4 Od |
1 x | Door Extension Spring (Each) |
1 x | HB35 HIGH VOLT HARNESS |
1 x | 50" Mosaic Masonry™ Bi-Fold Door, Oiled Bronze Finish |
1 x | # 30 burner orifice |
1 x | Clean-Out Door 12"x12" / Cast Iron |
1 x | 1in Two Ply-20 Ft/kit |
1 x | AUGER BRASS BUSHING 5/8" ID & PLATE (POSTJAN01/ 08) |
1 x | GASKET 1-1/2X9-32 BULBPSA |
1 x | Log Scraps, Floor Media Kit |
1 x | Buff Brick Liner Kit 35 |
1 x | 3/16 Rubber Spacer-10pack |
1 x | Oriental 44"x22" Half Rnd - Burgundy |
1 x | 12 X 6 Tile Frame-brsh Ss |
2 x | Self Adh Grommet-10ft/kit |
2 x | Damper Clamp (Required in vented applications.) |
1 x | Façade, Sante Fe, Black |
1 x | WOODEN HANDLE WITH BOLT |
1 x | Ul Short Slide Plate-sale |
2 x | FEEDER CLEANOUT-SALES |
1 x | P35i Ashlip Cover-sales |
1 x | Bulk50-sae Fw 5/16x11/16 |
1 x | BRUSHED SS TILE PLTE-DEER |
1 x | 3-Piece Trim Kit, Black |
1 x | Tl Door Trim-brsh Ss |
1 x | Face Plate, Nickel |
1 x | Boiler Gasket-3/16 In Pt |
1 x | Top Auger for all Pellet Units |
1 x | Large Shell Fireback / Cast Iron - Black |
1 x | 3 oz. Silicone Sealant (Black) 1 |
1 x | Jardin 44" x 22" Half Rnd / Noir |
1 x | Bulk25-ssscp 3/8-16 X 1/4 |
1 x | TLC REAR HINGE-SALES |
1 x | Large Plain Design Fireback / Cast Iron - Black |
1 x | Stove Panel Bracket Kit |
1 x | LP to NG Conversion Kit |
1 x | red propane label |
1 x | Auger Motor |
1 x | Highliner, Decorative Accent Trim, Aged Silver |
1 x | Brick Clip (Each) |
1 x | Vintage Red Brick Liner Kit 33 |
1 x | Control Panel Faceplate for A-E-101 1 |
1 x | Glass Fuse for Digital Board (5 Amp) (5 pack) |
1 x | Hf60 Rear Foam Insulation |
1 x | CAST IRON GRATE |
1 x | Elbow 45-Degree, 8" I.D. |
1 x | Glass W/gasket |
2 x | Oak/tl3 Dmpr Frame-sales |
1 x | CAPACITOR HOLDER KIT |
1 x | Ash Pan Weldment |
1 x | Vacuum Shut Down Switch .04-.05 |
1 x | Outside Air Kit for Pellet Units |
1 x | BURN POT 1.5" INTAKE HOLE |
1 x | 42" Perimeter Trim - Brushed Brass |
1 x | AUTO DRAFT CONTROL-SALES |
1 x | Adjustable Length, 8" I.D. (2" - 5") |
1 x | RAINIER INSERT |
1 x | 42" Drain Pan w/ 1" Stainless Decorative Face Ext. |
1 x | Burner Orifice # 50 - LP 99/00/01/02/03/04 |
1 x | Complete door |
1 x | P61/p61a Burn Pot-sales |
1 x | Door Handle, Spring – Chrome 1 |
1 x | (891148) Handle – Pocket Pull For Hopper Lid 1 |
1 x | Cotter pin |
1 x | CAM ASY-SALES |
1 x | SCREW-HWH TEKS 8 X 3/4 |
1 x | Hf60 Water Jacket-sales |
1 x | COMBUSTIO/EXHAUST BLOWER ASSEM 115V (FORMED)(POST 10-03) |
1 x | Decorative Volcanic Stone |
1 x | Warm Red Full Herringbone |
2 x | Ceramic Magnet - Side Doors (Each) |
2 x | 250 BRICK RETAINER-SALES |
1 x | Cam Latch – P23, P1000PWA, P24 1 |
1 x | Shaft Cage Weldment |
1 x | 42" Outdoor Bi-Fold Glass Door, Platinum Finish |
1 x | Weston Fire Screen w/ Leaf Motif / PC - Graphite |
1 x | Air Switch (use part # 80621) 1 |
2 x | Decorative Ash Bed / Control Cover Kit |
1 x | Manual Fan, Variable Speed |
1 x | Tl Handle Asy-sales |
1 x | Baffle, Top Plate 2 |
1 x | Hf60 Wrap Around Insul |
1 x | 42" Stainless Steel Hood w/4" Brow |
1 x | Male Disc-fully Ins-25/pk |
1 x | FEEDER DUST TRAY-SALE |
1 x | 1196 1990-1993 |
1 x | UL HOPPER-SALES |
1 x | Glass U Clip - Flush Window (Each) |
1 x | Wright Design Wood Holder w/ Suede Carrier |
1 x | CONVERSION KIT FROM LP TO NG SIENNA |
1 x | Log Scraps, Floor Media Kit |
1 x | 42" Vent-Free Firebox Vintage Fiber Liners |
1 x | Deluxe Brushed Stainless Hood Kit |
1 x | 26-1/2 x 48 Black |
1 x | Pellet Stove Brush |
1 x | Hf60 Ul Fdr Asy-sales |
1 x | Glass, Oval 1 |
2 x | Remote, On/Off, Hi/Low, Electronic |
1 x | Wall Mount On/Off Switch Kit |
2 x | Unit- mountable Rocker Switch |
1 x | Brushed Steel Basket |
1 x | ASH PAN-SALES |
2 x | Spring Clip-20 Pack |
1 x | LEFT FIREBOX BAFFLE-SALES |
1 x | #12 Jack Chain - 2 Feet Required (Each) |
1 x | RAINIER STOVE |
1 x | Gas Appliance Installation Kit |
1 x | 120 Volt Power Cord |
1 x | Door Latch (Each) |
1 x | Acc Door Glass Clip-sales |
1 x | 8IN DIN RAIL |
1 x | 3/8 Rd Black Ld-5 Ft |
1 x | 36" Section Hi-Temp Double Wall Pipe Snap Lock |
1 x | Hf60 Short Bottom Gasket |
1 x | Castable Refractory Cement • Dry mix (buff) |
1 x | 38/45/61/68 Fdr Cover-sal |
1 x | 5/8" I.D. AUGER BRASS BUSHINGS (SET OF 2 ) (POST JULY01/08) |
1 x | Oak/tl3 Logo Brick |
1 x | Ivory Split Stacked |
1 x | Bulk100-fhn 1/4-20 Z 5 |
1 x | Weston Fire Screen w/ Leaf Motif / PC - Graphite |
1 x | Burner Orifice # 54 - LP - Rear |
1 x | Millivolt, Propane to Natural (SIT) |
1 x | Oak/tl3 Ss Brick Clip Set |
1 x | Summer Screen for Votives |
1 x | 26733 BASE PLATE 1 |
1 x | 32" Perimeter Trim - Platinum |
1 x | Combustion Blower Transition – Aluminum 1 |
1 x | Cast Faceplate Mounting Bracket Left |
1 x | 69839 Door Assembly 1 |
1 x | Tl3 Door Asy-sales |
2 x | GASKET-TL3 PKG SIDE/TOP |
1 x | Clean Face Panel Kit (Requires Gravity Kit) |
1 x | GASKET-3/16X5/8 FLAT-10FT |
1 x | Steel Sleeve Bushing |
1 x | 48" Masonry Ceramic Glass Bi-Fold Door, Bronze |
2 x | Novasit regulator |
1 x | Iron Rail, Decorative Accent Trim, Aged Silver |
1 x | Electronic Natural to Propane (Honeywell) |
1 x | Coastal Legs, Brushed Nickel |
1 x | Bulk50-hwhtcs1/4-20 X 5/8 |
1 x | BOX TRIM KEY SET |
1 x | HB35 3/8IN 90DEG TUBE-SAL |
1 x | CORD-ELECTRIC 22 IN |
1 x | Flanged Bushing--Auger |
3 x | Novasit Regulator - LP |
1 x | Tl2/win Brick Insulation |
1 x | 26736 Surround, Right 1 |
1 x | ZC-SUPPRT-ML230 |
1 x | Bulk100-toplock Nut 10-32 |
1 x | Starter Kit: for Wall or floor installations. Includes blower (B |
1 x | Oriental 56"x26" Rect - Beige |
1 x | Acc Block Gasket Set |
1 x | Front burner tube |
1 x | Acc Combustion Housing |
1 x | Heating/Cooling thermostat - 120 volt |
1 x | Threaded Stud, Pepin Ash Pan |
1 x | ADC COVER-PAINTED-SALES |
1 x | Bulk50-rev Locknut 1/4-20 |
2 x | Oak Rear Brick Retnr Set |
1 x | Gold Knob W/screw |
1 x | 5/8" Door Gasket Repair Kit |
1 x | Wall mounted LCD manual and Thermostat Modes |
1 x | Oriental 56"x26" Half Rnd - Beige |
1 x | Shroud Leg Spacer Kit (for UL approval of field fab term covers) |
1 x | 1/4" X 1" Glass Nutsert (Each) |
1 x | BRASS SPRING HANDLE 1/2" |
1 x | Bulk100-close End Pop Rvt |
1 x | TLC GRATE LINK-SALES |
2 x | Outside Air Kit (4’’ I.D. x 10 ft. long insulated flex) |
1 x | D-shape Knob/shaft-25 Set |
1 x | Standard Electronic On/Off Remote Control Kit |
1 x | Ul Pellet Feeder Auger |
1 x | 38/45/61/68 Gold Ash Lip |
1 x | Decorative Ash Bed / Control Cover Kit (Six Pack) |
1 x | Acc Comb Mnfld Ltch-rght |
1 x | Western Timber, 24" VF Log, Concrete |
1 x | Black 12oz Aerosol Spray |
1 x | AUGER (POST JULY01/ 08) |
1 x | COTTAGE TRIM FASTENER KIT PEWTER |
1 x | Variable Speed with Thermo Snap Switch |
1 x | 50" Mosaic Masonry™ Bi-Fold Door, Pewter Finish |
1 x | Warm Red Split Herringbone |
1 x | Duplex Receptacle Box Cover |
1 x | Convection Fan |
1 x | Fitting Elbow 90 Degree (Located At Orifice End) |
1 x | PB105 BODY WELDMENT-SALES |
1 x | Fitting Elbow 90 Degree Forged (Valve Outlet End) |
1 x | Glass Media, 5LB Bag, Platinum |
1 x | 42" Surround, Black Added Depth |
1 x | BLACK CLASSIC KIT |
1 x | Fem Disc-fully Ins-25/pk |
1 x | Xxv Door Asy Blk Enam-sal |
1 x | Oak Retainer Plate W/hdwr |
1 x | Ivory Full Stacked |
1 x | 50" Mosaic Masonry™ Bi-Fold Door, Ebony Finish |
1 x | Jardin 44" x 22" Half Rnd / Cocoa |
1 x | 2600 JCKT SIDE W/O HOLE-S |
1 x | 26415 Access Panel 1 |
1 x | Diamond Curved Screen |
1 x | Bulk100-cntrlcknut 1/4-20 |
1 x | Millivolt, Natural to Propane (SIT) |
1 x | PEWTER & BLACK 4PC TOOL FIRESET |
1 x | Twisted Rope Match Holder |
1 x | Duplex Receptacle - White |
1 x | Blower Motor Only |
1 x | FUSE HOLDER-TIMERBOX |
1 x | COMBUSTION BLOWER MOUNTING GASKET |
1 x | Tl2.6 Cut Brick Set |
1 x | Black Flush Glass Trim (Each) |
1 x | P35i Ash Pan Asy-sales |
1 x | 2" Clearance Firestop Spacer (1ea) |
1 x | 9mm X 13mm Tubing-5ft/kit |
2 x | BEARING 3/8 ID X 1-1/8 OD |
1 x | ONE HOLE FEED COVER |
1 x | Hf60 Hopper Asy-sales |
1 x | Roman Bronze Scrolls Log Basket |
1 x | BRICK PANEL RETAINERS (SET OF 2) |
1 x | TLC FRONT TOP ASY-SALES |
1 x | Hf60 Foam Insulation Frnt |
1 x | Conversion Kit, Millivolt, Propane to Natural |
1 x | BLWR RESTRICTOR PLATE-2PK |
1 x | Swell Latch And Spacer |
1 x | 36" Louvered White Herringbone Refractory |
1 x | Grate Weldment |
1 x | 9-1/2 X 13-5/16 Glass |
1 x | GASKET-TL3/OAK PKG AIRSET |
1 x | BURN POT SCRAPER TOOL |
1 x | AUGER MOTOR 115V (1 RPM) |
1 x | Pb105 Jacket Top-sales |
1 x | Hinge - Male Right 2 |
1 x | Boiler Coil Washer 2/pk |
1 x | Xxv Rght Side Blkenam-sal |
1 x | Gas Conversion Kit Electronic Ignition - NG to LP |
1 x | Comb Pkg Cap-tl2.0 |
1 x | Door Handle Bolt 1/4-20 X 4 1/2" Hex |
1 x | 26413 Surround, Right 1 |
1 x | 36" Louvered Insulated White Stacked Refractory |
1 x | # 42 burner orifice |
1 x | Handle mount plate |
1 x | HB35 BURNER SCREEN-SALES |
1 x | Conversion Kit, Electronic Ignition, Propane to Natural |
1 x | Touch up paint firebox interior |
1 x | Motor Mnt W/grommet-2 Pk |
1 x | Furnace Cement (black) |
1 x | 700 1987 |
1 x | Auger Bushing Washer |
1 x | Flex 5" I.D. X 15' long |
1 x | 306w/120v Ignitor-10 Pack |
1 x | Oriental 56"x26" Rect - Blue |
1 x | Brick Partial - 4 1/2" X 4 1/2" |
1 x | CIRCUIT BOARD DECAL-PELLET 115V&220V |
1 x | SLAB BASE T-NUT-40 PACK |
1 x | Pb Cleanout Rod Repair |
1 x | Cord Clamp #1250 Black |
1 x | OLYMPIC STOVE |
1 x | Front bushing bracket |
1 x | 5/8 ID AUGER COLLAR W SCREW |
1 x | Diamond Curved Screen |
1 x | Louver, Brushed Nickel (For Cast Iron Top Only |
1 x | DV FLUE CONNECTOR |
1 x | TLC COOKGRILL HANDLE-SALE |
1 x | Xxv Door Only-sales |
|
$95,679.76 |
Shipping Charges |