1 x | Bracket, Mhs Lvr,right Bd |
1 x | BRICK RETAINER (2) w/SCW# UNIVERSAL PART |
1 x | LOG, LEFT - LS44/46 (#4)# CLASSIC |
1 x | BRICK RETAINER (2) w/SCW# UNIVERSAL PART |
1 x | ASHLIP TRIM, SET SCREWS - 10pk# |
1 x | Bulk100-uss Fw 1/4 Z |
1 x | BURNER, 564HO EMBERFYRE W/LOG* |
1 x | 21 FRONT BURNER ORIFICE #42 (NG) |
1 x | COVER, RIVET (564 GS) w/4 MOUNTING RIVETS |
1 x | LEVELING LEG PK, (4) RADIANT |
1 x | TEE, FITTING- 864TRV/564SS 21TRV 3/8 FLARE x 3/8 mpt |
1 x | LOG EMBERS, LARGE BAG # 12oz. BAG |
1 x | BRUSH, BOTTLE STYLE# UNIVERSAL PS/PI |
1 x | GLASS w/FRAME - BRK/TOL FINGER-PULL LATCH - 2007+ |
1 x | GLASS w/GASKET - BRK/TOL GS NO FRAME |
1 x | PILOT ASSY (5-Pk), NG PSE 2-WY# UNIVERSAL |
1 x | BRICK-CUT, 9 x 7 x 2-5/16 |
1 x | ON/OFF SWITCH w/EXTN WIRES DVL/DVS INSERTS |
1 x | BRUSH, BENT HANDLE # COMBUSTOR/FIREBOX BROOM |
1 x | Rear Log Bracket Assembly |
1 x | BRICK-CUT, 9 x 2-7/8" # |
1 x | SHUT-OFF VALVE# VARIOUS GAS UNITS |
1 x | GLASS RETAINER ASSY, 3n1 SML# w/GLASS & GASKET |
1 x | PUSH PLUG, 1/4" dia, BLK FWI/FXFRE |
1 x | BRICK-CUT w/ HOLE 9x4-1/2x6 GRNST IGN BRICK, INSERT |
2 x | GSKT TADPOLE,3/8 x3/4 PSA BLK# 12' BULK LENGTH |
1 x | TEMP PROBE, FOR DIGITAL METER# ALL MDLS EXPECT APEX 42 |
1 x | BRICK RETAINER SET - FWIM L/R SIDES & REAR |
1 x | BAFFLE INSULATION - MFW MED. FLUSH WOOD INS. |
1 x | DOOR HINGE BRACKET |
1 x | Novasit Pilot Assembly - NG |
1 x | 3/4" I.D. x 2" O.D. Flat Washer |
2 x | FLEX PIPE, 3/8 x 8-1/2# w/ ORIFICE MANIFOLD |
1 x | Fan Speed Control (Rheostat) 99/00/01/02/03/04 |
1 x | ACCENT LIGHT, RGHT 564 HO HONB/GSR2-GSR2 w/ SCR |
1 x | N/S : DOOR ASSEMBLY KIT |
1 x | PILOT ASSY, NG - S.I.T. # PRE GREENSMART |
1 x | SNAP-DISC - 200deg NC # NORMALLY CLOSED - HOPPER DISC. |
1 x | Mill Pac Direct Vent Pipe Sealant - Tube |
1 x | EMBERS, ROCK-WOOL 50 grams# 8X10 BAG |
1 x | INJECTOR, PILOT - LP (#35) # USE w/SIT PILOT ONLY |
1 x | PAINT, METALLIC BLACK 3oz# SPRAY CAN |
1 x | VALVE REGULATOR, LP SIT# S.I.T. 907.204 |
1 x | VENT, ELITE - STARTER COLLAR* 810006669 |
1 x | FLUE STARTER SECT FS GAS/ VARIOUS MODELS |
2 x | SIENNA OWNERS MANUAL |
1 x | DIFFUSER UNIVERSAL 18 GA ALZ - 3.639 x 3.232 |
1 x | Ball Plunger - Bottom Louver (Each) |
1 x | Burner Orifice # 53 - LP |
1 x | Diamond Curved Screen |
1 x | Fitting 1/8" Brass Pipe Adaptor (Located Between Elbows |
1 x | PAINT, METALLIC BLACK 3oz# SPRAY CAN |
1 x | FASTENER - KEPS NUT, 10 PK 8-32 |
1 x | Double Door Catch |
1 x | 2 VALVE ASSEMBLY |
1 x | PAINT, METALLIC BLACK - 12oz.# SPRAY CAN |
1 x | HANDLE (WOOD), DOOR - AVALON# 1/2" id x 4.169" LONG |
1 x | GLASS SPACER, (1) HER FS DV/BV 13-3/16" LONG |
1 x | PILOT ORIFICE, LP - 0.014 PSE# PSE PILOT ASSY |
1 x | GSKT, PILOT ASSY, GS# ALL GREENSMART UNITS |
1 x | LOG GRATE, 864 HO DA/EF GS THRU GSR2 SCR MODELS |
3 x | Novasit Pilot Hood 3 Way 00/01/02/03/04 |
1 x | SUMMER FAN SWITCH-ART# REPLACEMENT PARTS |
1 x | GSKT, FLUE ADAPTER 9" x 9" VARIOUS MODELS |
3 x | Fitting Elbow 90 Degree Forged (Valve Outlet End) |
1 x | Blower Wire Harness 6ft |
2 x | GSKT TADPOLE,3/8 x3/4 PSA BLK# 12' BULK LENGTH |
1 x | GLASS, 1/4 CRUSHED PLAT 10LBS* |
1 x | ANDIRON, WROUGHT IRON* 864 & CLEAN FACE |
1 x | Novasit Electrode - Short |
1 x | SHUT-OFF VALVE# VARIOUS GAS UNITS |
1 x | BAFFLE REAR (LFW)# 12 GA SS304 - 26.500 X 11.288 |
1 x | SHL SIDE w/SCN, LT GRN NWI SCN NEW IRON |
1 x | PILOT ASSY, NG - S.I.T. # PRE GREENSMART |
1 x | 3 PROFLAME CONTROL |
1 x | 7 : VALVE REGULATOR NG MANUAL |
1 x | GLASS RETAINER SET OF 2 DVL/DVS INSERT - 2005 |
1 x | ORIFICE, BURNER - No. 50# SERVICE PART |
1 x | LOG EMBERS, SMALL BAG # 4 oz. bag |
1 x | ORIFICE, BURNER - No. 44 1.180 BRS HEX (.086) |
1 x | ORIFICE, BURNER - No. 56# 1.180" BRASS HEX (.0465 dia) |
1 x | KNOB (PLASTIC), RHEOSTATS # BLACK w/WHITE LINE - GAS/WOOD |
1 x | PAINT, METALLIC BLACK 3oz# SPRAY CAN |
1 x | WALL PLATE, WHITE (RKR SWTCH) SERVICE PART |
1 x | LEVER COVER (W/O HOLE) 36/44E |
1 x | PAINT, METALLIC BLACK 3oz# SPRAY CAN |
1 x | 5 Pc Ball Handle - Square Base |
1 x | CLIP, FLOOR BRICK - 564SS CLEAN FACE - GSR2 |
1 x | Bulk50-sae Fw 5/16x11/16 |
1 x | PILOT ELECTRODE COVER TUBE SILICONE TUBE |
1 x | Bulk100-toplock Nut 10-32 |
1 x | SET-SCREWS, 3n1 DOOR KIT# SET OF (2) 1/4-20 x7/16 |
1 x | Cast Front Assembly |
1 x | VENT, ELITE - 2" FIRESTOP(30)* 810006674 |
1 x | GLASS, SMALL LOPI# 8-7/8 x15-3/8" GSKT NOT INCLD |
1 x | BRICK-CUT, 9 x 4 |
1 x | SPRING, EXT. - 3.5" (FULL) x .250od x .041 - 21 TRV |
1 x | N/S : BLACK LOUVER |
1 x | PILOT ORIFICE, LP - 0.014 PSE# PSE PILOT ASSY |
1 x | HW PACK, BLOWER KIT DVi SERVICE PART |
2 x | HANDLE, HOPPER LID - BLACK ALL PS & LG PS/PI 1997-00/AGP |
1 x | Bulk100-bhscs1/4-20 X 3/8 |
1 x | KNOB (PLASTIC), RHEOSTATS # BLACK w/WHITE LINE - GAS/WOOD |
1 x | ANDIRON, TRADITIONAL RING* 564 SS |
1 x | BRKT, FACE, BTM (564/864) SET OF 2 - WILMINGTON |
1 x | 5 pc Tool Set - Maple Leaf |
1 x | PAINT, METALLIC BLACK 3oz# SPRAY CAN |
1 x | Injector 1.20 Mm |
1 x | CNTRL MODULE, BRNR - GS1# ALL GS1 MODELS |
1 x | ORIFICE, BURNER - No. 49 # 1.180" BRASS HEX (.073 dia) |
1 x | FASTENER - HEX NUT# STEEL 3/8-16 -JAMB-LOCK, 5 PK |
1 x | Magnetic Catch - Pedestal Door |
1 x | CNTRL MODULE, BASIC FUNCTION# GSB2 MODELS |
1 x | FASTENER - SCW BLK 6 PK# WD DR HNDL, 1-1/4"x1/4-20 |
1 x | PILOT ELECTRODE - SIT# SPARK ELECTRODE - SIT PILOT |
1 x | FUSE, 5AMP, 5-PK# FUSE ASSEMBLY - 93 & UP PEL |
1 x | INJECTOR, PILOT - LP (#35) # USE w/SIT PILOT ONLY |
1 x | GSKT, WIRE PLATE VARIOUS UNITS - 2" x 1-1/4" |
1 x | EMBERS, ROCK-WOOL 5 gram# |
1 x | EMBERS, ROCK-WOOL 5 gram# |
1 x | MOISTURE METER# FIREWOOD MOISTURE |
1 x | BOARD MOUNTING BRACKET 864 HH/ST |
2 x | KNOB (WOOD) w/ SCREW, BLK FWI# 3/8 i.d. w/HOLE - PAINTED BLK |
1 x | BLOWER BRKT PLATE - BRK/TOL BRKT ONLY - NO HW |
1 x | LOG, REAR TOP (RIGHT)- LS16# HIDEAWAY |
1 x | FACE SCREW, GLD, 1-1/2" (12)# XTRA-LONG LGT - 1/4-20 PHPMS |
1 x | BURNER TUBE |
1 x | BRICK, CUT - SET, FPX 44 A/E |
1 x | Transflo Blower - Motor Only |
1 x | Vermiculite; Bag |
1 x | FLUE SLIDE PLATE ASS'Y - RADIANT RADIANT INS MED/LG |
1 x | PILOT ELECTRODE, 24" - PSE# PILOT FLAME SENSOR - PSE ONLY |
1 x | VENT, 8" MINIMUM VENT KIT A* 810005037 |
1 x | STEPPER MOTOR, NG GS2# GS2/GSR/GSR2 - 3.5"-1.6" WC |
1 x | BRICK RETAINER (2) w/SCW# UNIVERSAL PART |
1 x | Pressure Relief Door Back 99/00/01/02/03/04 |
1 x | Brick Partial - 4 1/2" X 4 1/2" |
1 x | Brass Plated & Black - 21\" L |
1 x | EMBERS, ROCK-WOOL 5 gram# |
1 x | Bulk100-fhn 5/16-18 Z 5 |
1 x | 1 : PIEZO IGNITOR |
1 x | Novasit Pilot orifice |
1 x | AIR CONTROL ASSY, FWM FW HYBIRD MED |
1 x | E30 OWNERS MANUAL |
3 x | N/S : FIREBRICK RETAINER BRACKET SCREWS |
1 x | VALVE REGULATOR, LP SIT# S.I.T. 907.204 |
1 x | AC ADAPTER, 7v # BASE GRN SMT APPLIANCES ONLY |
1 x | SNAP-DISC, 110deg, 2 PR# NORMALLY OPEN |
1 x | Trim Rail Brkt (nielsen) |
1 x | Burner Orifice # 50 - LP 99/00/01/02/03/04 |
1 x | Novasit Pilot Assembly - LP *** |
2 x | Robertshaw Valve Only - LP |
1 x | GSKT TADPOLE,3/8 x3/4 PSA BLK# 12' BULK LENGTH |
1 x | ANDIRON, WROUGHT IRON* 864 & CLEAN FACE |
1 x | RUBBER MOTOR STOP - 2-PK# ALL PELLET - 1990 to PRESENT |
1 x | 6 REAR BURNER |
1 x | BURNER ASSY, FRONT 564SS# 2007-2019 |
1 x | 4 CERAMIC GLASS LENS |
1 x | SHUT-OFF VALVE, GAS# 1/2 INLT, 3/8 FLARE TUBE OUTLT |
1 x | LEVELING LEG PK, (4) RADIANT |
1 x | PANEL, INSULATION - 3" x 10' # Wood Burning Inserts |
1 x | BURNER, 564HO DANCINGFYR TRAD* |
1 x | ON/OFF SWITCH w/EXTN WIRES DVL/DVS INSERTS |
1 x | 5 : INJECTOR LP 52 |
1 x | HINGE, FACE, 4-PK- BERK HINGE & FSTNER, THRU 09 |
1 x | # 33 burner orifice |
1 x | PILOT ORIFICE, LP - 0.014 PSE# PSE PILOT ASSY |
1 x | WIRE HRNS PIG-TAIL, MALE 3-PIN, JNCTN BOX |
1 x | GSKT, GLS 15/16"x50ft. 302-B# VARIOUS WOOD, PELLET & GAS |
1 x | BLOWER FILTER, REPLACEMENT# FPX WOOD |
1 x | Side Left Cast - Charcoal Grey |
1 x | FRONT PLATE w/SILK SCRN LBL 21/864ST/564/31/33 GS |
1 x | LIGHT BULB BASE/SOCKET-2-PIN# BULB BASE,BOTTOM, w/48" LEADS |
1 x | VALVE, SERVO MOTOR, SKYTECH# AF-2000MVH/L - non-ALPHA |
1 x | FLEX PIPE, 3/8"od x 12 BLK NO FITTINGS |
2 x | N/S : PIEZO WIRE |
1 x | THERMO-PILE (10Pk) - SIT# SIT PILOT 1999-2009 |
1 x | 9B : VALVE UV SIT 820.636 RP |
1 x | HANDLE (WOOD), DOOR# w/ SCW 1/4-20 x 1-1/4" BLK |
1 x | GLASS w/GASKET - 564SS NO FRAME |
1 x | BRICK-WHOLE,9 x 4-1/2 x 1-1/4# STANDARD FIREBRICK |
1 x | FLEX PIPE, 3/8"od x8" BLK NO-FITTINGS |
1 x | DOOR HANDLE LATCH |
1 x | PELLET STOVE CLEANING BRUSH |
1 x | Cast Door Hinge With Pin |
1 x | FASTENER - KEPS NUT, 10 PK 8-32 |
1 x | PILOT ORIFICE, NG - 0.018 PSE# NG PILOT ORIFICE |
1 x | BRICK-CUT, 9 x 4-1/2 x 2-11/32 ANGLE CUT BRICK |
1 x | GLASS CLIP w/ GSKT, BOTTOM FWI/FWP/LFW |
1 x | DOOR CAM, BRASS # VARIOUS MODELS |
1 x | PAINT, METALLIC BLACK 3oz# SPRAY CAN |
1 x | FAN, 564/864 TRV - GS* |
1 x | PILOT ELECTRODE - SIT# SENSING ELECTRODE - SIT PILOT |
1 x | 1/4" X 1" Glass Nutsert (Each) |
1 x | TEMP METER STAND# FOR HANDHELD READER |
1 x | Firebox Baffle/Restrictor Assembly |
1 x | ORIFICE, BURNER - .0625" 1.180" BRASS HEX (.0625 dia) |
1 x | WIRE HRNS EXT# 3-PRONG MOLEX PLUG 7" |
1 x | CONTROL PANEL, GSR2 FP 564/864 |
1 x | FACE SCREW, BLACK # BLACK, 1"-1/4-20 PHPMS - 6 PK |
1 x | WIRE HRNS PIG-TAIL, FEMALE 3-PIN, PWR DUCT KIT |
1 x | ACCESS DOOR BRKT, RIGHT 31/33/DVSGS/DVLGS |
1 x | D/bvg/gin/flx Snapdisc |
2 x | Fan Speed Controller Knob 99/00/01/02/03/04 |
2 x | E33 CONTROL PANEL C/W DECAL |
1 x | GSKT ROPE, BLK - GLASS 3/8"x66"# AVALON WOOD, PELLET & GAS |
1 x | Door Mounting Bracket Black Left - Double Door |
1 x | 3/8" X 7" Gas Inlet Pipe |
1 x | ASH GUARD - FWP FWP ARCH/REC & FW CAPE COD |
1 x | ORIFICE, BURNER - No. 70# 1.180" BRASS HEX (.028) |
1 x | Adjustment Gear Assembly 99/00/01/02/03/04 |
2 x | # 37 burner orifice |
1 x | E33I - CONVERSION KIT FOR LOG IPI - LP TO NG |
1 x | MANUAL, BERKSHIRE DOUBLE DOOR OWNER/INSTALL - 2007 |
1 x | N/S : DI-FACE NUT |
1 x | LOG, REAR - LS87 (#1)# CLASSIC OAK |
1 x | BLOWER, CONVECTION# 93-95BV,91-96PS/PI, 00 LRG PS |
1 x | KNOB, PEL SWITCH BOX '90-96 # RHEO & FEED RATE SWITCHES |
1 x | LOG, REAR - LS52 (#1)# (2011) |
1 x | LOG, FRONT (CHUNK)(#2) LS43# |
1 x | STAND-OFF (x1) TOP, 864 w/RIVETS |
1 x | BURNER ASS'Y, OUTER - 864 ST GS/GS2 |
1 x | Louver Form 28.275 Vmi |
1 x | PILOT, RETRO KIT - PSE 2-WY# NG/LP - GS/GSR/GSR2 |
1 x | PIPE ADAPTER, 3/8 FLARE x3/8M 3/8 FLARE x 3/8 MPT - 1/4 FPT |
1 x | GASKET-3/8 RD HD-5 FT |
1 x | Power Cord - 120 Volt |
2 x | GRATE, IRON 864TRV/HH/ST SERVICE PART |
3 x | Fitting Elbow 90 Degree (Located At Orifice End) |
1 x | Hf60 Fb Refractory Btm |
1 x | SPACER, 1/4 dia. x .312 - BLK PACK OF 15 |
1 x | 12B : R/S (ON/OFF SWITCH) |
1 x | RHEO NO OFF, SQUARE # w/ TWO MALE CONNECTORS |
1 x | Nut # 4 (Magnet Holder) |
1 x | ORIFICE, BURNER - No. 55 1.180" BRASS HEX (.052 dia) |
1 x | Bracket, Pilot - Tpb Se |
1 x | Brick Clip (Each) |
1 x | 18 3/8" WASHER |
1 x | GSKT TADPOLE,3/8 x3/4 PSA BLK# 12' BULK LENGTH |
1 x | AIR CONTROL SHUTTER, REAR CYP,GRNFLD,864HO, 33DVi,DVLGSR |
1 x | PAINT, METALLIC BLACK - 12oz.# SPRAY CAN |
1 x | FAN KIT, DVI INSERT# 31/33 DVI - COMPLT ASS'Y |
1 x | GLASS CLIP w/ GSKT, TOP FWI - w/FASTENERS |
1 x | PILOT TUBE, SIT# USE w/SIT PILOT ASSY ONLY |
1 x | PILOT HOOD,2-WAY, S.I.T - GS# STANDARD GS PILOT HOOD |
1 x | # 49 burner orifice |
1 x | HINGE ASS'Y, DOOR - LG/SD BLK SOCKET & PIN |
1 x | ORIFICE/MANIFOLD ASS'Y, 564 IPI/SS |
1 x | PIPE ADAPTER, 3/8 FLARE x3/8M 3/8 FLARE x 3/8 MPT - 1/4 FPT |
2 x | FASTENER - SCW 6 PK THREAD CUTTING - 10-24 x 1/2" |
1 x | PILOT HOOD, 3-WAY SIT # NON-GREENSMART |
1 x | Bulk25-ssscp 3/8-16 X 1/4 |
1 x | BURNER, (EF) - 2004-08 # 21DV TV-RV/HIDEAWAY/SWEET DRMS |
1 x | GSKT, PILOT ASSY, GS# ALL GREENSMART UNITS |
1 x | Zero Clearance Sleeve |
1 x | LOG, RIGHT LOG - LS6# (AKA DVS I) - BERKSHIRE |
1 x | START COLLAR - 6" DIA. FPX WOOD/PHD/EXTRM |
1 x | LOG, REAR - LS19# ALL/SPDV-EF/DVSZC - INS |
1 x | Oak Andiron-painted-sales |
1 x | GLASS LATCH, SPRING PIN INS VARIOUS MODELS |
1 x | RATE SCREW, LP - CLN FACE LP ONLY - 36/1080CF/ST/PIER |
1 x | Top Cast Charcoal - Charcoal Grey |
1 x | 8a : REGULATOR LP - MANUAL |
1 x | Oak Ash Door Latch Kit |
1 x | PIEZO IGNITER, ALL mv GAS UNITS # w/ RETAINING NUT |
1 x | PILOT ELECTRODE - SIT# SPARK ELECTRODE - SIT PILOT |
1 x | SWITCH, ROCKER, ON/OFF# SINGLE-POLE, VARIOUS GAS UNITS |
1 x | WIRE HRNS EXT# 3-PRONG MOLEX PLUG 7" |
1 x | SHAKER REPLACEMENT-TLC |
1 x | Cast Door - Right |
1 x | GLASS w/FRAME - 564# FINGER-PULL LATCH - SS/DF/DLX |
1 x | EMBERS, ROCK-WOOL 5 gram# |
1 x | DOOR LATCH STRAP, G5/G11/G13/# G16/G22 - OLD STYLE 1998' UNIT |
1 x | MAGNET w/SHEATH 1.000 x .750" 1/4" THICK |
1 x | DUPLEX RECEPTACLE WHITE 15A 125V |
1 x | HANDLE - EXTENSION. HI-LO, SIT VALVE REGULATOR KNOB |
1 x | LEFT LOG SPACER CYP/33/DVL-DF |
1 x | RHEOSTAT WHEEL (1) w/ SPACERS AND COLLAR |
1 x | ORIFICE, BURNER - No. 37 1.180" BRASS HEX (.104 dia) |
1 x | WIRE HRNS PIG-TAIL, MALE 3-PIN, JNCTN BOX |
1 x | MANUAL, DVS FIREPLACE EF, '01 2001 |
1 x | ROLL PIN - GLS LATCH SPRING PACK OF 5 - 5/32" dia x 3/4" |
1 x | PAINT, METALLIC BLACK 3oz# SPRAY CAN |
1 x | Comb Pkg Cap-tl2.0 |
1 x | LOG, CHUNK, LS44/46 (#6)# CLASSIC |
1 x | DAMPER EXT ROD/PULL RING# 13-1/8 - LIB/FRDM/FLBY/LFW |
1 x | FLEX PIPE, 3/8 x 8-1/2# w/ ORIFICE MANIFOLD |
1 x | PIEZO IGNITER, ALL mv GAS UNITS # w/ RETAINING NUT |
1 x | BURNER ASS'Y, 564 HO# EMBERFYRE |
1 x | 19 3/8" FLEX CONNECTOR |
1 x | PANEL, DVS II 4 x 6* |
1 x | SIENNA CERAMIC BURNER GASKET |
1 x | GSKT TADPOLE,3/8 x3/4 PSA BLK# 12' BULK LENGTH |
1 x | GSKT TADPOLE,3/8 x3/4 PSA BLK# 12' BULK LENGTH |
1 x | FUSE, 3AMP, 1/4 dia 5-PK# 250-AVC, GLASS TUBE, 3AG |
1 x | 7B : LOG FOR LOG SWITCH |
1 x | DOOR, WASHER, .390 x .630 SS# PK OF 8 |
1 x | FRBK RETAINER CLIP (2) FIREBACK CLIP |
1 x | HINGE ASS'Y COMPLT, L/R 21DV/TRV/LG/SD |
3 x | Spark Generator Switch - Comes With Wire |
1 x | PAINT, METALLIC BLACK 3oz# SPRAY CAN |
1 x | MAGNET w/SHEATH 1.000 x .750" 1/4" THICK |
1 x | GSKT, BRNR TRAY -DVS GSR/31DVI 2 PCS, 1/2"wide 11-1/2"x9-1/2" |
1 x | HINGE CAP, 36E SINGLE DOOR KIT QTY (2) |
1 x | Explosion Door Handle (Each) |
1 x | RUBBER MOTOR STOP - 2-PK# ALL PELLET - 1990 to PRESENT |
1 x | KNOB (PLASTIC), RHEOSTATS # BLACK w/WHITE LINE - GAS/WOOD |
1 x | PIEZO IGNITER, ALL mv GAS UNITS # w/ RETAINING NUT |
1 x | GLASS FRAME ONLY, FRONT EDEN/NORTHFIELD, NO GLS/GSKT |
1 x | VALVE CONTROL BOX ASS'Y 1080/36CF |
1 x | LOG, REAR - LS46 (#3)# |
1 x | Pressure Relief Bolt Round Gasket (Each) 2 Per Unit |
3 x | Pressure Relief Top Frame Gasket (Each) |
2 x | 9B : PILOT LP |
1 x | 5 Pc Urn Handle - Rect Base w/ Gallery / Antique / Antique |
1 x | PULL RING, METALLIC BLACK # PAINTED |
1 x | 47" Poker - Aerator / Solid Brass |
1 x | FLUE STARTER SECT FS GAS/ VARIOUS MODELS |
1 x | TOGGLE SWITCH, SUMMER FAN SWITCH OPTION |
1 x | FLUE STARTER SCTN (8" od) w/GASKET |
1 x | PILOT ORIFICE, LP - 0.014 PSE# PSE PILOT ASSY |
1 x | FUSE, 6 AMP, 250v - 5-PK GS# GS FAN MODULE |
1 x | GROMMET, BLACK RUBBER PACK OF 5 - SERVICE PART |
1 x | ROLL PIN - GLS LATCH SPRING PACK OF 5 - 5/32" dia x 3/4" |
1 x | SHUT-OFF VALVE# VARIOUS GAS UNITS |
1 x | WIRE HRNS, PUSH AUGER AGP INS INSERT ONLY |
1 x | BRICK-WHOLE,9 x 4-1/2 x 1-1/4# STANDARD FIREBRICK |
1 x | ORIFICE, BURNER - No. 44 1.180 BRS HEX (.086) |
1 x | VENT, PEL MASNRY LINER KIT 20* 810001908 |
1 x | ACCENT LIGHT, LEFT 564 HO HONB/GSR2-GSR2 w/SCR |
1 x | CNTRL MODULE, BASIC FUNCTION# GSB2 MODELS |
1 x | BATTERY HOLDER, GSR-2# PRO-FLAME-2 |
1 x | PANEL, CUSTOM LG FL WD 4 PACK* 47.5 x 46.5 x 8, UNPAINTED |
1 x | ORIFICE/MNIFLD ASS'Y, 864TRVGS w/#49 NG ORIFICE |
1 x | SWITCH, PILOT ON/OFF - GS# (GREENSMART PILOT CONTROL) |
1 x | SCREEN, GLS FRM, 564SS MESH BLACK |
1 x | FUSE, 5AMP, 5-PK# FUSE ASSEMBLY - 93 & UP PEL |
1 x | Caution Label-15 X 3 Blk |
1 x | Black Wire - From Valve To On/Off Switch (Each) |
1 x | # 47 burner orifice |
1 x | ORIFICE, BURNER - No. 37 1.180" BRASS HEX (.104 dia) |
1 x | EMBERS, ROCK-WOOL 15g# |
1 x | LOG, TWIG TOP LEFT - LS87 (#2)# CLASSIC OAK |
1 x | E33I OWNERS MANUAL |
1 x | POWER CORD, w/MOLEX (18 GA) # UNIVERSAL - WOOD & GAS |
1 x | WIRE HRNS EXT# 3-PRONG MOLEX PLUG 7" |
1 x | Brick Panel/Ember Base - Set Of 3 |
1 x | LIGHT BRKT ASS'Y, INSERTS-LED# DVL&DVS GSR/31&33 DVi |
1 x | Ball Plunger Hose Clamp - Bottom Louver (Each) |
1 x | GSKT TAPE, 1/4" X 1/16" WHT 10' BULK LENGTH |
1 x | BURNER , FRONT - 31 DVi 31 DVi/DVS DF - GSR & GSR2 |
1 x | PIEZO IGNITER, ALL mv GAS UNITS # w/ RETAINING NUT |
1 x | GSKT,UNIV GLASS - TDPLE 75"# GLS GSKT, VARIOUS GAS UNITS |
1 x | KNOB (PHNLC), 1" dia x 1.64 3/8-16 THREAD - TEARDROP SHAPD |
3 x | Embers - Bag |
1 x | BURNER ASS'Y, OUTER - 864 ST GS/GS2 |
1 x | 3-Way Gold Contact Switch 99/00/01/02/03/04 |
1 x | Cypher Collection - Floor Standing Tool Set |
1 x | E33GI - CONVERSION KIT FOR GLASS IPI - LP TO NG |
1 x | MAGNET w/OUT SHEATH w/ MOUNTING HW |
1 x | INJECTOR, PILOT - NG (#62)# USE w/SIT PILOT ONLY |
1 x | LIGHT TRAY, 864HO DF DF BURNER KIT - 96900142 |
1 x | BLOWER, CONV - 21DV TV# 21DV-EF/HIDEAWAY |
1 x | PILOT ASSY, NG or LP# XTREME/36 CF/1080 CF |
1 x | CONV PARTS, NG 564SS GS2 SIT/PSE PILOT |
1 x | PAINT, METALLIC BLACK 3oz# SPRAY CAN |
1 x | BRICK-CUT, 4-1/2 x 2 |
1 x | GLASS CLIP SCREWS (10), AVA # 10-24 x 1/2", BRASS/CAST DOORS |
2 x | Screw # 4 (Magnet Holder) |
1 x | MANUAL, 864 ST (GS) (OPER.) (OPERATION) - 2009 |
1 x | Convection Blower Assembly - Complete |
1 x | GSKT, GLASS 3/4" WIDE x 70"# LOPI WOOD, PELLET & GAS |
1 x | STOVE PACK, 564 DF (GS) 2010 SERVICE PARTS |
2 x | SHUT-OFF VALVE# VARIOUS GAS UNITS |
2 x | LIFTING HANDLES, FIREPLACE # VARIOUS FIREPLACES |
1 x | FLUE COLLAR ASSY, 864 INTAKE/EXHAUST PIPE |
1 x | BLOWER, CONVECTION# 93-95BV,91-96PS/PI, 00 LRG PS |
1 x | Color Control Lbl-pb/hf |
1 x | MERIDIAN FS CABINET SIDE RIGHT |
2 x | EMBERS, ROCK-WOOL 50 grams# 8X10 BAG |
1 x | GSKT TADPOLE,3/8 x3/4 PSA BLK# 12' BULK LENGTH |
1 x | DOOR, WASHER, .390 x .630 SS# PK OF 8 |
2 x | Round Magnet - Screen Door (Each) |
1 x | CONV PARTS, NG - SIT 564 SS 2007-08 |
1 x | PANEL, FL WD LG 1PC 35 x 47* |
1 x | SS BURN POT LINER, STANDARD (EF2/3/WIN/MER) |
1 x | FLEX PIPE, 3/8"od x 6" BLK SERVICE PART |
1 x | GSKT TADPOLE,3/8 x3/4 PSA BLK# 12' BULK LENGTH |
1 x | ANDIRON, ARABESQUE* 864 & CLEAN FACE |
1 x | MANUAL, HERITAGE DVL FS EF 2000 |
1 x | WIRE HRNS PIG-TAIL, FEMALE 3-PIN, PWR DUCT KIT |
1 x | Trim Rail Brkt W/screw |
1 x | Washer # 4 (Magnet Holder) |
2 x | Burner Orifice #32 - NG 99/00/01/02/03/04 |
1 x | VALVE REGULATOR, NG RS# ROBERT SHAW (0.9-3.5") |
1 x | Front Cast - Seaside Sand |
1 x | Multi-fuel burn pot weldment |
1 x | KNOB (WOOD) w/ SCREW# A/C - ASH/ALDER |
1 x | STUD PLATE/HW ASSEMBLY SM PI/PS |
1 x | Glass Media, 5LB Bag, Goldfinger |
1 x | CONV PARTS, LP - SIT 21 TRV-GS |
1 x | 1" O.D. X 17 1/8" L. (14 Air Holes) (Weld In) |
1 x | Control Board - 20 Pin |
1 x | WIRE HRNS, JUMPER, SPLIT FLOW 616/430 |
1 x | ORIFICE, PILOT - NG (.021)# ALL 93 & UP GAS w/RS PILOT ASY |
1 x | Right Hand Auger (Each) - 2 Per |
1 x | STEPPER MOTOR, NG GS2# GS2/GSR/GSR2 - 3.5"-1.6" WC |
1 x | TRIM ASS'Y, FRONT - 864 TRV/ST - SCR MODELS |
1 x | CONVECTION AIR DEFLECTOR DVS-I EF II |
1 x | Round Magnet Holder - Screen Door (Each) |
1 x | WIRE HRNS, POWER VARIOUS MODELS |
1 x | 6 : FRONT INJECTOR NG NO. 42 |
1 x | 8 VENT SLIDE ASSEMBLY |
1 x | Robertshaw Valve Only - NG |
1 x | SPACER, 1/4 dia. x .312 - BLK 4 PACK - VARIOUS UNITS |
1 x | SNAP-DISC - 200deg NC # NORMALLY CLOSED - HOPPER DISC. |
1 x | SCREEN, GLS FRM, 564SS MESH BLACK |
1 x | FLEX PIPE, 3/8"od x 28" BLACK NO-FITTINGS |
1 x | LEVELING BOLT[4], STEEL/PWR LEG# w/RUBBER TIP - 3/8-16x1.5" |
1 x | FIREBACK, 564 HANDMADE BRICK* |
1 x | BUSHING (DOOR/HANDLE) 7/8" LONG x 1/2" dia |
1 x | Half Round Rug Deep Taupe / Taupe/Yellow |
1 x | Half Round Rug Sangria / Red/Brown |
1 x | KNOB, EXTENSION (2.0") GS - FOR PROFLAME VALVE |
1 x | CAULK FOR GRATES |
1 x | EMBER SHELF ASS'Y, LT - 33DVi NO MNTG TAB |
1 x | VALVE, NG - S.I.T. (3.5-1.6)# S.I.T. 820.704 |
1 x | SCREEN, MESH 864 - BLACK 36" x 24" |
1 x | START COLLAR - 6" DIA. FPX WOOD/PHD/EXTRM |
1 x | Brnr Main Non-lx/fs Lp Un |
1 x | Fatwood Caddy - Colonial / PC - Black |
1 x | 9 VENT CONNECTION GASKET |
1 x | GSKT TADPOLE,3/8 x3/4 PSA BLK# 12' BULK LENGTH |
1 x | OPT BLWR#1601 UP |
1 x | BERN / MINI FIREBOX PANEL SET WITH INSULATION |
1 x | FASTENER - SCW 5 PK BUTTON HEAD, 1/4-20x3/8" |
1 x | FLUE ADAPTER, DV 8" TO 6-5/8"* 810004994 |
2 x | ORIFICE, BURNER - No. 56# 1.180" BRASS HEX (.0465 dia) |
1 x | Thermodisc 160 Degree High Limit (60T12) |
1 x | RHEO w/OFF, SQUARE(MM)# w/NUT & WASHER |
1 x | GSKT, PILOT ASSY, GS# ALL GREENSMART UNITS |
1 x | GSKT KIT, GLASS CLIP - FWP/LFW# GLS CLIP GSKT(2) - ARCH & RECT |
1 x | VENT, CO-LINEAR 5" X 8"* 810006055 |
1 x | GSKT KIT, PILOT ASSY FOR NON-GREENSMART UNITS |
1 x | CONV PARTS, LP - SIT 864 TRV GS |
1 x | TRIM ASS'Y, FRONT - 864 TRV/ST - SCR MODELS |
1 x | GSKT, MIXING TUBE, FRONT 36/1080CF - 2.56" x 1.56" |
1 x | VALVE REGULATOR, LP SIT - MOD S.I.T. 907.506 |
1 x | HEARTH PLATE - 564SS SERVICE PART |
1 x | CNTRL/ACCESS DR ASS'Y,INSERTS 31/33DVi, DVS/DVL GS-GS2 |
1 x | PILOT TUBE, RS # EXCEPT 95 36DV & DEXEN VALVE |
1 x | THERMO-PILE (10Pk) - SIT# SIT PILOT 1999-2009 |
1 x | SWITCH, LITE LED w/SUPPORT SERVICE PART |
2 x | Tl Door Trim-brsh Ss |
1 x | Black End Caps |
1 x | Hopper Lid Switch |
1 x | SIT PILOT 1/8" TUBE W/END FERULES - ONE PIECE-ALL GAS |
1 x | GSKT (10pk), MIXING TUBE# VARIOUS MODELS |
1 x | BRUSH, BENT HANDLE # COMBUSTOR/FIREBOX BROOM |
1 x | MANIFOLD COVER, LP 616 GSR/4415HO |
1 x | GSKT CEMENT, 3oz. TUBE# w/BRUSH - UNIVERSAL |
1 x | SNAP DISC HOLE COVER w/SCREWS & GSKT |
1 x | LOG, REAR RIGHT (CHUNK) -LS31# |
1 x | GSKT,UNIV GLASS - TDPLE 75"# GLS GSKT, VARIOUS GAS UNITS |
1 x | AIR DEFLECTOR, DVS GSR ONLY MUST USE WITH LS52 LOGSET |
1 x | PILOT ASSY (5-Pk), NG PSE 2-WY# UNIVERSAL |
1 x | Duplex Receptacle Box |
1 x | DOOR, HINGE PIN RETROFIT, BLK# 2-PK, FS/INS |
1 x | RHEO NO OFF, SQUARE # w/ TWO MALE CONNECTORS |
1 x | ACCENT LIGHT COVER CYPRESS/GREENFIELD |
1 x | FRBK MEDIA TRAY REAR 564 DF PAINTED BLACK |
2 x | N/S : PILOT REGULATOR NG |
1 x | Front Cast - Charcoal Grey |
1 x | FLEX PIPE, 3/8"od x8" BLK NO-FITTINGS |
1 x | 10-2131-18 Ss Flex Hose |
1 x | LOG SUPPRT ASS'Y, RGHT (33DVi/CYPRESS) |
1 x | FIRESTOP ASS'Y 3615,4415,4415ST,6015 HO & 564 SS |
1 x | RHEO w/OFF, SQUARE(MM)# w/NUT & WASHER |
1 x | BATTERY TRAY, GS - "AA" SERVICE PART |
1 x | LOG, RT END(LG CHUNK) LS31# |
1 x | GSKT TADPOLE,3/8 x3/4 PSA BLK# 12' BULK LENGTH |
1 x | PIPE ADAPTER, 3/8 FLARE x3/8M 3/8 FLARE x 3/8 MPT - 1/4 FPT |
1 x | HW PACK, DOOR - FPX ADJ WSHRS SERVICE PARTS |
1 x | DOOR LATCH CLAMP EVG/FW INS |
1 x | LIGHT BULB, HALOGEN 5PK# 35watt, T4, 120volts, 380 Lumen |
1 x | SWITCH, ROCKER, ON/OFF# SINGLE-POLE, VARIOUS GAS UNITS |
1 x | Dielectric Grease (Packet) |
1 x | GRILL, 564 LOUVER BLACK* |
1 x | Piezo Igniter |
1 x | 4a : ODS PILOT ASSEMBLY LP - MANUAL |
1 x | ON/OFF SWITCH w/EXTN WIRES DVL/DVS INSERTS |
1 x | Valve Assembly - NG |
1 x | GSKT, GLASS 3/4"x50ft. 301-B# ASHESIVE BACK, GLS GSKT |
1 x | VALVE REGULATOR, LP MAN HI-LO# SIT 907.010 (11" - 2.9") GS |
1 x | FRONT PLATE w/SILK SCRN LBL 21/864ST/564/31/33 GS |
1 x | 13 : BLACK LOUVER |
1 x | ELEC JUNCTION BOX 564/864 GS |
1 x | BLOWER, LT, GAS INS - 2005+ # EF-II/DVS/DVL/31/33 |
1 x | Green 2.2 qt Enamel Steamer - Lattice Top |
1 x | RHEO w/OFF, 90v, RECT (MM)# w/NUT & WASHER |
1 x | 5/8 ID AUGER COLLAR W SCREW |
1 x | VALVE, SHUT-OFF - 616/430# BALL VALVE - 616/430 INSERT |
1 x | TRIM, FRONT LEFT - 564 PRE SCREEN MODELS |
1 x | Hf60 Comb Side Insulation |
1 x | VALVE, SPLIT-FLOW v.2# DUAL-BRNR CNRL - GSR/GSR2 |
1 x | Outside Air Kit Collar, Hood & 3' Flex for Floor Venting |
1 x | THERMO-PILE (10Pk) - SIT# SIT PILOT 1999-2009 |
1 x | BLOWER STUD PLATE (2) 21 TRV |
1 x | Log Set - Complete ( No Embers, Lava Or Vermiculite) See Line |
1 x | Leg Cast - Midnight Blue |
1 x | AC ADAPTER, 7v # BASE GRN SMT APPLIANCES ONLY |
1 x | GSKT, 1/2" X 50' BLACK# BULK - 50' |
1 x | ROLL PIN - GLS LATCH SPRING PACK OF 5 - 5/32" dia x 3/4" |
1 x | Door Mounting Bracket Gold Left - Double Door |
1 x | ACCESS DOOR, 31/33 DVI GSB/GSR |
1 x | RHEOSTAT, w/TOGGLE SWITCH FPX w/OUT DOOR SWITCH |
1 x | GLASS LATCH - FINGER-PULL# vr.2, 2007+ |
1 x | Left Hand Auger |
1 x | FASTENER - SCW 25 PK HWSHSMS,#8 x 3/8" TYPE B |
1 x | BLOWER MOUNTING BRKT 1995-2000 GAS |
1 x | PAINT, METALLIC BLACK 3oz# SPRAY CAN |
1 x | GLASS LATCH - FINGER-PULL# vr.2, 2007+ |
1 x | CONV PARTS, LP - SIT 564 SS / 2007-08 |
1 x | Door Left Cast - Midnight Blue |
1 x | SNAP-DISC, 110deg, 2 PR# NORMALLY OPEN |
1 x | WIRE HRNS, PWR - LIGHTS UNIVERSAL - EMBERGLO |
1 x | CONTRL MODULE, FAN - GRNSMRT# w/POWER CORD |
1 x | Door Mounting Bracket Nickel Left - Double Door |
1 x | Robertshaw Thermopile |
1 x | Motor Retainer Bracket |
1 x | Extension Shaft - 5 1/4" Long x 3/4" O.D. |
1 x | 6 9” FLEX CONNECTION |
1 x | LATCH, BULLET, RESTRICTOR BALL/SPRING LATCH ONLY |
1 x | REMOTE WALL MOUNT BRACKET# w/SCRWS GRN SMRT GS |
1 x | LOG, LEFT - LS18# 21DV/RV/EF/SWTDRMS |
1 x | GLASS w/GASKET - 564SS NO FRAME |
1 x | GRMT/SPACER (4) - BLOWER# 1997+ PEL/1995+ GAS |
1 x | PAINT, METALLIC BLACK - 12oz.# SPRAY CAN |
1 x | 7 ASSEMBLY COLLAR |
1 x | Fan Speed Control Knob 99/00/01/02/03/04 |
1 x | INJECTOR, PILOT - NG (#62)# USE w/SIT PILOT ONLY |
1 x | 2 BLUETOOTH CONTROL MODULE |
1 x | TOOL (PULL), LPI w/SPRNG HNDL# BYPASS PULL TOOL |
1 x | GSKT TADPOLE,3/8 x3/4 PSA BLK# 12' BULK LENGTH |
1 x | 15 : BLACK LOUVER DOOR |
1 x | Tstat-sit Model #630 (067 |
1 x | SWITCH, PILOT ON/OFF - GS# (GREENSMART PILOT CONTROL) |
1 x | On/Off Switch Assembly Complete |
1 x | MAGNET w/SHEATH 1.000 x .750" 1/4" THICK |
1 x | Flanged Bushing--Auger |
1 x | PILOT ELECTRODE SLEEVE, BLK# BULK LENGTH - 6 FEET |
1 x | INJECTOR, PILOT - LP (#35) # USE w/SIT PILOT ONLY |
2 x | LIGHT BULB, HALOGEN 5PK# 35watt, T4, 120volts, 380 Lumen |
1 x | BRICK-CUT, ANGLE CUT 4-29/32x4-1/2x23.5deg @2-61/64 |
1 x | HEAT SHIELD 564 FOR REAR VENT APPLICATIONS |
1 x | WIRE HRNS, SIT GS REMOTE(v.2)# NOT FOR GS2/GSR2 UNITS |
1 x | Fan Wiring Harness |
1 x | LOG EMBERS, LARGE BAG # 12oz. BAG |
1 x | GSKT, EXHAUST/INTAKE - AGP INS 1/8 RTV SILICONE - 6.563x3.695 |
1 x | Harness - Wiring Male |
1 x | eFire and Light Assembly Service Kit (Linear Series) |
1 x | 9B : PILOT NG |
1 x | GLASS, AVALON SMALL# 5mm NEOCERAM - 10.125 x 17.094 |
1 x | FASTENER - KEPS NUT, 10 PK 8-32 |
1 x | Accin22in Ulhop/hopsw-sal |
1 x | PRES RELIEF DOOR w/ GSKT # MULTIPLE GAS UNITS 1997 + |
1 x | N/S : LAVA ROCK |
1 x | WIRE HRNS, JUMPER, SPLIT FLOW 616/430 |
1 x | LOG, REAR RIGHT (CHUNK) -LS31# |
1 x | LOG, FRONT LEFT - LS16 # HIDEAWAY |
1 x | TOGGLE SWITCH, SUMMER FAN SWITCH OPTION |
1 x | Herringbone Rust |
1 x | Mini Helic |
1 x | Robertshaw Regulator - NG |
1 x | 7 3/8 UNION BULKHEAD FITTING |
1 x | 4 TRANSFORMER |
1 x | GLASS LATCH - FINGER-PULL# vr.2, 2007+ |
1 x | PRES RELIEF DOOR, RGHT(1) 864 864 TRV/HH |
1 x | LIGHT ASSY-564/864 TYPE-1 ACCENT - NOT FOR GREENSMART |
1 x | BURNPOT HOLDER, 1991-96# DOES NOT INCLUDE BURNPOT |
1 x | TOOL HOLDER (w/MNTG SCW), SERVICE PART |
1 x | Door Mounting Bracket Gold Right - Double Door |
1 x | REMOTE, BLK WALL-MOUNT# ALL GS/GSR/GSR2 MODELS |
1 x | PILOT TUBE, SIT# USE w/SIT PILOT ASSY ONLY |
1 x | Screw 1/4-20 X 3/8 Pkg-50 |
1 x | MERIDIAN FS CABINET SIDE LEFT |
1 x | ASHPAN PAWL - NO KNOB ELAN/400/900 PS-PI 1991-1996 |
1 x | CONCEALMENT COVER, 564 GS SERVICE PARTS |
1 x | FIRESTOP, 44 DVXXL/DVL ZC 03/ 21 RV/HDY RV/864 TRV |
1 x | Door Left Cast - Timberline Brown |
1 x | INJECTOR, PILOT - NG (#62)# USE w/SIT PILOT ONLY |
1 x | Venturi/gasket/screws Ass |
1 x | Extra Long Rope Design Brush - 36" L |
1 x | 3 : REAR BURNER LP MILLIVOLT |
1 x | Valve To Reg Pilot Mv 3/1 |
1 x | ACCESS DOOR BRKT, RIGHT 31/33/DVSGS/DVLGS |
1 x | Half Round Rug Amber/Green / Amber/Brown |
1 x | LOG, RT END(LG CHUNK) LS31# |
1 x | Oak/tl3 Ss Brick Clip Set |
1 x | GRMT/SPACER (4) - BLOWER# 1997+ PEL/1995+ GAS |
1 x | BRKT, CONTL MODULE, INS GSR DVS/DVL INSERT |
1 x | Half Round Rug True Blue / Navy/Biscotti |
1 x | RHEO w/OFF, SQUARE(MM)# w/NUT & WASHER |
1 x | Fatwood Caddy Refill - 8 Lb Bag / Wood |
1 x | VALVE REGULATOR,NG MAN HI/LO# SIT 907.203 (3.8"-1.1") millivol |
1 x | INJECTOR, PILOT - LP (#35) # USE w/SIT PILOT ONLY |
1 x | REMOTE RECEIVER, GS - SIT# TIMED FAN FUNCTION |
1 x | MERIDIAN DOOR COMPLETE (POST MAY 2010) |
|
$47,840.06 |
Shipping Charges |